0 projects

PES-HORISONT-EU-PES Horisont Europa

Physics and data-based battery management for optimized battery utilization (Batteries Partnership)

WP1 - Project management WP2 Multi-scale modelling framework, parametrisation, model reduction WP3 Data, analytics and inference: AI, state estimators, prognosis WP4 Digital twins and framework validation WP5 Physical BMS, sensorisation, data collection, open data, cybersecurity WP6 Experime...

Awarded: NOK 69,999

Project Period: 2022-2023

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Towards net-zero emissions ports as multimodal hubs for sustainability and smart mobility: The greening of EU ports

The overall Greening Ports strategy is to introduce solutions testing mature key energy, infrastructure, mobility greening technologies and to demonstrate how these can be integrated and optimised to provide an emissions neutral port in a sustainable and transferable manner. To achieve this, Gre...

Awarded: NOK 59,999

Project Period: 2020-2021

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Ocean-11

Proposing a Zn-ion battery (ZIB) system with aqueous electrolyte. Modern ZIBs are particularly well suited for this challenge: Potential for lower costs, both capex and opex even on cell level Aqueous ZIBs are inherently safe in terms of being non flamable even higher potential for lower costs on...

Awarded: NOK 79,999

Project Period: 2020-2020

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Maritime light-weight batteries

Prosjektet går ut på å ta vårt lettvekts batterisystem fra TRL6-ish til TRL9. Dette lettvekts batterisystemet er i dag det maritime batterisystemet med den høyeste energitettheten som også har innebygd passiv propageringsskkerhet slik at dersom en enkeltcelle begynner å brenne så vil ikke en bran...

Awarded: NOK 99,999

Project Period: 2019-2020

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Clean maritime transport -large modular battery systems

Prosjektet går ut på å ta vårt lettvekts batterisystem fra TRL7 ti TRL9. Dette lettvekts batterisystemet er i dag det maritime batterisystemet med den høyeste energitettheten som også har innebygd passiv propageringsskkkerhet slik at dersom en enkeltcelle begynner å brenne så vil ikke en brann sp...

Awarded: NOK 74,999

Project Period: 2019-2019

Location: Vestland

MAROFF-2-Maritim virksomhet og offsh-2

Utvikling av nytt batteristyringssystem spesielt for maritime anvendelser.

I Norge står skipsfarten for ca 20% av CO2 utslippene og ca 33% av NOx utslippene i transportsektoren (2011 tall). Elektrifisering med batterier vil kunne bidra til å få ned disse utslippene. Dersom en bruker effektoptimaliserte batterier vil forbruket av drifstoff fra skip med store variasjoner ...

Awarded: NOK 0.15 mill.

Project Period: 2015-2015

Location: Telemark

PES2020-Prosj.etabl.støtte H2020

Maritime batteries feasibility study

This is a feasibility study verifying the technological/practical as well as economic viability of a maritime battery concept with considerable novelty to the maritime and offshore industry sectors.The activities comprise risk assessment, market study, IP R management, innovation strategy develop...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Telemark

PES2020-Prosj.etabl.støtte H2020

Certified maritime battery pack

Project work description A battery system contains several parts: Cell: Smallest electrochemical unit Module: Assembly of cells including some level of electronic control Sub-Pack: Assembly of 1 or more modules. The smallest unit that can be electrically insulated String: Smallest unit in a bat...

Awarded: NOK 29,999

Project Period: 2014-2014

Location: Telemark

MAROFF-2-Maritim virksomhet og offsh-2

Utvikling av en Lithium Ione batterimodul for maritimt bruk basert på 18650 celler

Utvikling av en Lithium Ione batterimodul for maritimt bruk Formålet med hovedprosjektet er å utvikle og teste en batterimodul for maritimt bruk basert på litium ione celler. Den mest sentrale FoU-utfordringen vi kommer til å være å møte kravene som marke det etterhvert begynner å etterspørre når...

Awarded: NOK 0.15 mill.

Project Period: 2013-2013

Location: Telemark