0 projects

PES-INST-Prosjektetablererstøtte EU (FoU)

Inorganic-organic hybrid materials for separation, catalysis and membranes

...

Awarded: NOK 29,999

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Punctually Responsivety in Autonomous Contexts

...

Awarded: NOK 4,169

Project Period: 2008-2009

Location: Østfold

PES-INST-Prosjektetablererstøtte EU (FoU)

NANOstructured MEMbranes for CO2 capture

...

Awarded: NOK 21,374

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Towards hierarchically nanostructured materials for breakthrough concepts in CO2 and H2S removal from methane

...

Awarded: NOK 49,184

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Improve animal health and food safety by manipulating gut physiology and microbiology

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Akershus

ROMFORSK-Program for romforskning

Dynamics of Spacecraft and Small Planetary Bodies

ITA has been actively involved with ESA's Rosetta mission since its launch in March 2004. The main goal of this very ambitious mission is to study the comet 67P/Churyumov-Gerasimenko (67P/C-G) with which the Rosetta spacecraft will rendezvous in August 20 14. The spacecraft will then be placed in...

Awarded: NOK 0.80 mill.

Project Period: 2008-2009

Location: Oslo

FORNY-3-Kommersialisering av FoUresultater

Obtaining in vivo data to judge the commercial potential of marine diatome apoptogen and marine cyanobacterial organic anion channel blocker

...

Awarded: NOK 1.4 mill.

Project Period: 2008-2010

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Knowledge Embeded Adaptive Production Systems

...

Awarded: NOK 74,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

HAVKYST-Havet og kysten

Toxicity of acute oil discharges to cod larvae - Relative contribution of oil droplets, water soluble fraction, and photosensitization

The main objective of this project is to provide parameterised data on the toxicity of oil in water dispersions to fish larvae toxicity, using cod fry as the main target in order to: 1. Determine the relative contribution to acute toxicity from the dissol ved and particulate phase of dispersed oi...

Awarded: NOK 4.5 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Cost-benefit methodology for the characterization of exposed outdoor stone heritage deterioration and preventive conservation

...

Awarded: NOK 44,303

Project Period: 2008-2008

Location: Oslo

RUSMIDDEL-Rusmiddelforskning

Konferanser (SERAF)

...

Awarded: NOK 2.3 mill.

Project Period: 2008-2015

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Towards River Basin Twinning Synergies

...

Awarded: NOK 79,999

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Novel Assembly Line Catalytic Machinery for Effective Production of Innovative Bioactive Compounds

...

Awarded: NOK 30,446

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Design of highly selective nanostructured membranes by innovative approaches

...

Awarded: NOK 49,859

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Value-chain integration and Risk-informed decision capability: Business models, New processes, and Integrated platforms for Performance opti

...

Awarded: NOK 5,613

Project Period: 2008-2008

Location: Rogaland

PES-INST-Prosjektetablererstøtte EU (FoU)

High volume piezoelectric thin film production process for microsystems

...

Awarded: NOK 0.19 mill.

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

New Materials for CO2 Capture using Electric Swing Adsorption

...

Awarded: NOK 42,435

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Forest biorefineries: Added-value from chemicals and polymers by new integrated separation, fractionation and upgrading technologies

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Management And Monitoring Of Deep-sea Fisheries And Stocks

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Highly Adaptable and Trustworthy Software using Formal Models

...

Awarded: NOK 47,424

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

EUropean NAnoporous Materials POLe of Excellence

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Use Snow Better as a Resource and Understand the Challenges Related to Snow and Seasonality in the European Groundwater Directive

...

Awarded: NOK 43,337

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Arctic Health Risks: Impacts on health in the Arctic and Europe owing to climate-induced changes in contaminant cycling

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Predicting Global Atmospheric Mercury Impact with Changing Energy Scenarios

...

Awarded: NOK 49,927

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Simulations for Personalised Learning Environments and Assessment

...

Awarded: NOK 99,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

SMARTRANS-Næringslivets transp. og ITS

Søknad om støtte til internasjonal workshop innen transportoptimering

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Groundwater and dependent ecosystems: Nenw Scientific basis on climate cange and land use impacts for the update of the EU Groundwater Dir.

...

Awarded: NOK 0.35 mill.

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

InteGRAtion of proCEss and quality control using multi-agent technology

...

Awarded: NOK 24,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Scale One CO2 Recovery And Trapping Engineering Studies

...

Awarded: NOK 0.20 mill.

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Arctic marine Life and Ecosystems Resilience under Threat

...

Awarded: NOK 43,162

Project Period: 2008-2008

Location: Vestland