0 projects

SSF-Svalbard Science Forum

PEbbles, ice and TalitroidS – checking overlooked beaches in the frame of autecology - RiS ID 12381

The project involves researchers part of both Amphipodologists group and editors for the Worls Registrer of Marine Species (WoRMS); for tighter collaboration and extension towards the ecology of sandy shores, it intends: To check for presence of talitroid amphipods on polar cobble beaches and as ...

Awarded: NOK 94,999

Project Period: 2024-2024

Location: Vestland

SSF-Svalbard Science Forum

Evaluating the maximum photosynthetic depth limit using coralline algae as a model organism, RiS ID 12351

This master’s thesis aims to better understand polar ecosystems by shedding light on the photosynthetic limitations of red coralline algae. We will use a mini remotely operated vehicle (Blueye X3) with a grabber attachment to locate and sample coralline algae from Van Mijenfjorden. We will collec...

Awarded: NOK 87,999

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

SSF-Svalbard Science Forum

Active Scattering in Sea Ice for Measuring Internal Properties

Sea ice is filled with small brine pockets because the salt is rejected by the crystal lattice during the freezing process. These brine pockets have a significant influence on several aspects of sea ice, including its bearing capacity, the remote sensing of it, as well as the amount of solar ener...

Awarded: NOK 53,999

Project Period: 2024-2024

Location: Svalbard

SSF-Svalbard Science Forum

Monitoring Active Layer Thickness from Space – Creating a Validation Dataset around Ny-Ålesund, RiD ID 12361

The active layer thickness is one of the most important variables characterizing the state of permafrost, but we still lack the possibility to determine it over large areas, especially from satellites. Seasonal thawing and freezing cycles of the active layer cause the ground surface to heave in w...

Awarded: NOK 0.11 mill.

Project Period: 2024-2024

Location: Oslo

SSF-Svalbard Science Forum

Monitoring seawater CO2 release from thawing permafrost mobilized by Bayelva proglacial stream, RiS ID 11654

The Bayelva river (Kongsfjorden, Svalbard) represents a key site where to unearth the patterns of carbon release from thawing permafrost into coastal waters. For this reason on September 2023 the Institute of Polar Sciences of the National Research Council (ISP-CNR) of Italy, in the framework of ...

Awarded: NOK 0.10 mill.

Project Period: 2024-2024

Location: Troms - Romsa - Tromssa

INNOFFARENA-Innovasjonsarena for stat og kommune

Kompetansespor

Prosjektet "Kompetansespor" tar sikte på å utforske hvordan eIDAS 2.0 vil påvirke kompetanseinnvandringsprosessene til Norge og hvilke muligheter ny teknologi gir. Med et økende behov for internasjonal kompetanse og den forestående utviklingen av eIDAS 2.0, er det avgjørende å være i forkant for ...

Awarded: NOK 0.15 mill.

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

AI for Open Source Software Security Certification

The main goal of CertifAIit project is to propose a holistic view on novel AI-based development technologies, data technologies and Cybersecurity compliance issues, by offering a toolset to implement secure code, easy to be integrated by third parties for releasing certified products, with a conc...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Rogaland

KLIMAFORSK-Stort program klima

Zerorapporten 2024: ZERO sjekker tempoet på vei mot 2030

I april 2022 fylte Miljøstiftelsen ZERO 20 år og i den forbindelse arrangerte vi klimatalen hvor vi lanserte «Zerorapporten ZERO 2030: Slik når vi klimamålene». I denne rapporten, som ble overrakt daværende klimaminister Espen Barth Eide, viser vi hvordan regjeringen kan nå sine mål om å kutte ut...

Awarded: NOK 0.12 mill.

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

DIRS - A Digital Incentivisation & Regulation PaaS and ecoSystem for controlling connected mobility services

The purpose of the project is to prove the relevance, impact power, and technical and commercial feasibility of a new digital incentivisation & regulation PaaS and ecosystem solution, DIRS. The new services delivered by the new DIRS platform will be offered to the market within 12 months from the...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

A targeted radiotherapy solution for hepatic and systemic cancer, delivering a potent alpha emitter directly to the tumor

Node Pharma has developed a novel targeted radiotherapy that enables the pre-selection and treatment of liver cancer patients. Primary liver cancer is ranked as the sixth most frequently occurring, and as the third most deadly cancer type as of 2022 (Globocan). Furthermore, liver cancer is freque...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Project support for Lead optimization for nomination of a preclinical development candidate for AML therapy

The PES grant will be used to engage personnel in KinSea to have dedicated time to write and coordinate the project proposal.

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Troms - Romsa - Tromssa

PES-HORISONT-EU-PES Horisont Europa

PES-middler til EUROSTARS 2024, vår

EUROSTARS-prosjektet skal fremme utviklingen av en ny generasjon undervanns-skanner. Disse vil være de første mobil optiske skannere basert på høy hastighet mønster projeksjon (laser), optimalisert for inspeksjon av betong-strukturer som for eksempel fundament til offshore vindkraft anlegg. SUBSE...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

RuralTwin PES

Writing a HE project proposal called RuralTwin. This is a follow-up proposal of NextGEOSS, (BLB was a partner and continue to maintain the resulting NextGEOSS datahub and platform), The H2020 project ILIAD developing the Digital Twin of the Ocean, BLB member of Coordination team as Innovation man...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Buskerud

PES-HORISONT-EU-PES Horisont Europa

Digital Twin for the Catchment-to-Shelf Continuum

The project addresses the critical importance of shelf seas for global societies by proposing the development of DT-Coast infrastructure. Shelf seas face various anthropogenic pressures and climate change impacts, necessitating adaptive observation and simulation strategies. The DT-Coast will inc...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Advanced Remote Infrastructure System Evaluation

The ARISE platform will continually update and digitally record the maintenance and repair status of infrastructure assets. It will adopt an interoperable data-sharing approach, adhering to existing standards and contributing to standardization. Moreover, ARISE will bolster skills development, of...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Søknad til EIC Accelerator steg 2 (Plug In)

Kyoto Group AS er et teknologiselskap innen fornybar energi som utvikler standardiserte industriskala systemer for generering og lagring av varme, såkalte Termiske Batterier, eller Thermal Energy Storage system (TES). Systemene tillater lading med rimelig strøm om natten eller når kraften er bill...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Akershus

IS-AUR-Samarb.progr. Norge Frankrike

Sustainability Wine Labelling: A French – Norwegian Scientific Cooperation

The backdrop for our collaboration is rooted in the historical and current landscape of the natural wine industry. The resurgence in popularity of natural wines, tracing back to its modern beginnings in France in the 1950s (Vigneron, 2022) and the subsequent boom after Isabelle Legeron's Raw Wine...

Awarded: NOK 40,000

Project Period: 2024-2025

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Arrangementsstøtte til konferansen MTEC/ICMASS i 2024

Som del av forskningssamarbeidet mellom Norge og Singapore har MTEC-konferansen (International Maritime-Port Technology Conference) vært arrangert stort sett annethvert år i henholdsvis Singapore og Norge. Det er bestemt at MTEC 2024 skal holdes i Trondheim i dagene tirsdag 29. og onsdag 30. okto...

Awarded: NOK 0.50 mill.

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

Development of a High Temperature downhole convertible coring and drilling system for a Geothermal drilling application.

The general project description is to develop and test a High Temperature system for a Geothermal well drilling application that allows drilling and selective coring without tripping, and which further includes controlling and adjusting the inclination of the wellbore by downhole adjustment of a ...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

Prosjektetablererstøtte til EIC Accelerator Step 2

Agoprene søker med dette om PES-støtte fra Forskningsrådet for å utarbeide og sende inn en vinnende søknad til EUs flaggskipprogram "EIC Accelerator" til fristen den 13. mars 2024. Agoprene sendte inn en "Step 1"-søknad i Q4 2023 som fikk "Go" fra tre av fire evaluatorer, og dermed kvalifiserte s...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Vestfold

NANO2021-Nanoteknologi og nye materiale

National Conference for Additive Manufacturing

NCAM2024 representerer en plattform for kunnskapsutveksling og samarbeid, nødvendig for å holde Norge i forkant av global utvikling innen additiv fabrikasjon. Gitt den eksponentielle veksten siden kommersialiseringen av 3D-printing, er dette feltet mer relevant enn noen gang, spesielt i nøkkelind...

Awarded: NOK 0.10 mill.

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

SPRINT - Sodium-ion batteries for stationary applications featuring improved electrodes PRocesses, Inherently safe and Non-Toxic materials

1) Scope and concept development of the project to optimise and demonstrate in end-user conditions two European, sustainable, techno-economically viable and safe Sodium-Ion Batteries (SIBs) to match the requirements of a wide range of energy storage applications. 2) Preparation of this EU project...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Vestfold

MSCA-TOPP-UT-Toppfinansiering av MSCA utgående kandidater

Topfinancing MSCA Melomanes

MSCA Melomanes is an acronym for "Combination therapy for the treatment of metastatic melanoma using magnetic nanoparticles". My role in the project is to investigate and evaluate the multiscale biological effects of nanoparticle-induced hyperthermia treatment on melanoma tumor microenvironments,...

Awarded: NOK 0.51 mill.

Project Period: 2024-2026

Location: Ukjent Fylke

PES-HORISONT-EU-PES Horisont Europa

HY4MAR - Utvikling av ny hydrogen fylleteknologi for maritim anvendelse.

HY4MAR-prosjektet krever en kompleks teknisk utvikling basert på avansert prosessutvikling og simulering. Grunnlaget er kort som følger: Hydrogen som energibærer kan spille en viktig rolle i maritim transport og industri i Norge. Spesielt innen den maritime sektoren har nordområdene i Norge, Sver...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Møre og Romsdal

IKTPLUSS-IKT og digital innovasjon

Event support for “The 2024 IEEE International Conference on Real-time Computing and Robotics”

The IEEE RCAR 2024 conference holds immense significance for Norwegian society, marking the first time it is hosted in Norway after successful editions in various countries worldwide. This presents a unique opportunity to showcase Norway's burgeoning expertise and contributions to the fields of r...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

PES Horizon CBE IA-05 2024 Bioaromatics from lignin

The project is a continuation and scale up of the RCN funded project 321427 Lignin to bioaromatics. Two technologies for depolymerisation of lignins (lignosufonates, kraft lignins, hydrolysis lignins) are ready for scale up. Borregaard plan to invest in a new demo plant for production of aromati...

Awarded: NOK 0.40 mill.

Project Period: 2024-2025

Location: Østfold

INNOFFARENA-Innovasjonsarena for stat og kommune

Forbedre, systematisere og automatisere kommunal kommunikasjon

• Bygland Kommune: Kommunen står overfor utfordringer knyttet til rekruttering og å tiltrekke beboere. For å takle dette har de identifisert behovet for å styrke sin tilstedeværelse og markedsføring i sosiale medier. Dette prosjektet er en direkte respons på dette behovet og er i tråd med kommune...

Awarded: NOK 0.11 mill.

Project Period: 2024-2024

Location: Agder

TRANSPORT-Transport 2025

Digital Twin for Aviation

The aviation sector will have to accelerate the work on reducing emissions to ensure we are able to meet goals defined globally, in the EU and nationally. Aviation may be the hardest-to-abate sector and is a system of systems. A number of value chains, interdependencies and governance structures...

Awarded: NOK 0.50 mill.

Project Period: 2024-2024

Location: Nordland - Nordlánnda

PES-HORISONT-EU-PES Horisont Europa

Støtte til EIC Accelerator søknad steg 2

Prosjektet går ut på å utarbeide og skrive en søknad til EIC Accelerator steg 2 der det stilles høye krav til både søknad, presentasjon og film.

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

MAIRROR

The objective of the MAIRROR proposal is to develop tools to help define design and process guidelines from any level of the characterisation pyramid. Currently, there is only interactions between the adjacent levels, but our project wants to break these barriers and generate new connections than...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo