0 projects

SIPOPETR-SIP-OED Petroleumssektoren

Fundamental Understanding Of Localised Corrosion In H2s-Containing Environments

The number of sour (H2S-containing) oil and gas fields worldwide is increasing, as sweet fields are being depleted and high oil prices vouch for profitable development of sour oil and gas finds. Sour oil and gas production and transport always imply a ris k of material damage and shutdowns due to...

Awarded: NOK 6.9 mill.

Project Period: 2008-2011

Location: Viken

NANO2021-Nanoteknologi og nye materiale

Parameter optimization in preparation of membranes for osmotic processes

For osmotic processes high flux of solvents combined with high rejection of solutes are necessary. TFC-membranes will be focused because the separation and support membranes are prepared separately, hence their influence on the performance of the two memb ranes and the total TFC-membrane will be ...

Awarded: NOK 5.0 mill.

Project Period: 2008-2013

Location: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

New International Training and Pre-Simulation Concept for Arctic Marine Operations - Phase 2

Prosjektet er en videreføring av Fase 1 som har resultert i grunnleggende nye algoritmer som danner basis for sanntids simulering av is. Algoritmene vil i fase 2 bli raffinert og tunet inn mot simulatoren. Validering av resultatene vil bli utført på tanks kip i is og i istank i Tyskland. Algori...

Awarded: NOK 6.3 mill.

Project Period: 2008-2010

Location: Trøndelag - Trööndelage

SIPOPETR-SIP-OED Petroleumssektoren

Top seal integrity and leakage, with relevance for exploration risk in the Barents Sea

For a number of years SINTEF Petroleum Research has been active in increasing the geologic understanding and improving exploration technology related to Arctic regions. Focus area for this research has been the Norwegian part of the Barents Sea. The goal of this research has been to increase the ...

Awarded: NOK 10.8 mill.

Project Period: 2008-2010

Location: Trøndelag - Trööndelage

FRINAT-Matematikk og naturvitenskap

Numerical Modeling in 3D of Rift Segmentation, Propagation, and Oblique Rifting: Control of Strain Weakening and Brittle Ductile Coupling

The work proposed here focuses on understanding the evolution and structural style of sedimentary basins and passive margins in 3 dimensions (3D) using state of the art computational modelling techniques. To date very few 3D models exist that follow the e volution of rifting to large deformation ...

Awarded: NOK 4.5 mill.

Project Period: 2007-2010

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sikkerhet offshore for Hørsel og Talekommunikasjon

...

Awarded: NOK 5.0 mill.

Project Period: 2007-2010

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Risk Modelling, Integration of Organisational, Human and Technical factors

There is considerable knowledge about how human performance may help to prevent accidents in the general, qualitative sense. There is also qualitative knowledge about how human errors may contribute to causing accidents. But there is quite limited knowled ge about how the performance of organisat...

Awarded: NOK 7.8 mill.

Project Period: 2007-2011

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Emergency handling in centres of coordination

This project aims to gain new knowledge about emergency handling in offshore centres of coordination. Both technological and organizational characteristics distinguish centres of coordination from more traditional work settings, e.g. the work require a co ntinuous interaction with other workgroup...

Awarded: NOK 2.1 mill.

Project Period: 2007-2010

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

SATURN Cold Flow demonstration project

...

Awarded: NOK 2.1 mill.

Project Period: 2007-2009

Location: Trøndelag - Trööndelage

SFI-Sentre for forskn.drevet innov

Center for Integrated Operations in the Petroleum Industry

Senteret for Integrerte Operasjoner i Petroleumsindustrien (IO-senteret) har vært et Senter for Forskningsbasert Innovasjon (SFI) i perioden 2007-2015. Forskningspartnerne er NTNU (vertskap), SINTEF og IFE, 8 store olje- og gasselskap og 5 leverandørselskap er industripartnere og 7 internasjona...

Awarded: NOK 80.0 mill.

Project Period: 2007-2015

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

ReelWell - Drilling Concept - Demonstration Jointed Pipe Version

...

Awarded: NOK 7.0 mill.

Project Period: 2007-2009

Location: Rogaland

PETROMAKS2-Stort program petroleum

Robust Regulation in the petroleum sector

Prosjektet "Robust Regulation in the petroleum sector" (2008-2013) har undersøkt egenarten ved det norske reguleringsregimet slik det har utviklet seg over tid. En har særlig sett på utviklingen av regimet i Nordsjøen og den tette koplingen og den gjensidige påvirkningen mellom norsk og britisk ...

Awarded: NOK 8.1 mill.

Project Period: 2007-2015

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

250T FRDS JIP Phase 3 & 4

...

Awarded: NOK 12.2 mill.

Project Period: 2007-2010

Location: Møre og Romsdal

VRI-Virkemidler for regional innovasjon

Virkemidler for regional FoU og Innovasjon - Vestfold 2007 - 2009

Partnerskapet Verdiskaping Vestfold (VSV) er formell avsender av Vestfolds VRI-søknad. På vegne av VSV er Høgskolen i Vestfold utpekt som juridisk kontraktspartner. Professor Stein Ivar Hansen er utnevnt fra VSV som koordinator for VRI Vestfold. VRI Vestf old er organisert med en egen styringsgru...

Awarded: NOK 9.0 mill.

Project Period: 2007-2010

Location: Vestfold og Telemark

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Coping with shiftwork: An empirical study among offshore and onshore petroleum workers in Norway.

The proposed project aims to create competence about the role of individual coping strategies with the special shift work system in the Norwegian petroleum sector, related to health, job-satisfaction, mastery of family/social life and sleeping problems. W e have a preliminary report based on a st...

Awarded: NOK 1.5 mill.

Project Period: 2007-2012

Location: Oslo

NANO2021-Nanoteknologi og nye materiale

Template based synthesis of nanoporous metal-organic frameworks with high surfaces areas

Metal-organic frameworks, also known as coordination polymers, have eminently promising properties regarding application as gas storage systems, sensors, magnetic materials, in ion exchange or catalysis. The principal objective of the project is to prepar e novel micro- to nanoporous metal-organi...

Awarded: NOK 6.4 mill.

Project Period: 2007-2012

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Effects of "Paperwork management" and Integrated Operations on managerial practice and HSE offshore: a comparative study

...

Awarded: NOK 2.6 mill.

Project Period: 2007-2011

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

A historical cohort study on multiple sclerosis among offshore workers in the petroleum industry in Norway

Norway has one of the highest frequencies of multiple sclerosis (MS) in the world with a life-time risk of more than 1 per 1000. The cause of this disease is still unknown. It is commonly assumed that MS has a polygenetic and multifactorial etiology with possible interactions between the genetic ...

Awarded: NOK 83,999

Project Period: 2007-2009

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Re-Os isotopic tracing of hydrocarbon systems in Arctic regions: Norway-USA collaboration implementing new technologies for exploration

Re-Os (rhenium-osmium) isotope geochemistry is emerging as a powerful tool for geochronology and tracer studies in petroleum systems. Both Re and Os are concentrated in organic material fixed in marine shales by reduction from seawater. The decay of 187 Re to 187Os provides a radiometric clock ...

Awarded: NOK 8.5 mill.

Project Period: 2007-2012

Location: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

TIME EFFECTS PILES UPGRADING BEARING CAPACITY OF PILED FOUNDATIONS TO ACCOUNT FOR TIME EFFECTS

The results of the project will primarily be based on the execution of a series of new pile load tests specifically designed to document the effects of time on the axial bearing capacity. A thorough characterisation of all relevant soil characteristics is necessary and will form an essential int...

Awarded: NOK 14.4 mill.

Project Period: 2007-2012

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Vispo3D Reservoir Management

...

Awarded: NOK 2.0 mill.

Project Period: 2007-2009

Location: Viken

DEMO2000-Prosj.ret tekn.utv. petro.virk

Partitioning Interwell Tracer Test to measure oil saturation

...

Awarded: NOK 1.8 mill.

Project Period: 2007-2010

Location: Viken

DEMO2000-Prosj.ret tekn.utv. petro.virk

eCAD - utilizing existing CAD models in eField real-time 3D visualization

...

Awarded: NOK 2.3 mill.

Project Period: 2007-2009

Location: Viken

NANO2021-Nanoteknologi og nye materiale

Conducting Oxides and Nanostructures for Energy Technology

The access to clean and sufficient energy represents probably the largest challenge of this century. Research programs world-wide put major emphasis on the need for rapid development of alternative and novel energy technology, and indeed, this calls for m aterials and components with performance ...

Awarded: NOK 10.0 mill.

Project Period: 2007-2012

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Real-Time Drilling Automated Analysis and Decision Support System

...

Awarded: NOK 1.9 mill.

Project Period: 2007-2009

Location: Viken

DEMO2000-Prosj.ret tekn.utv. petro.virk

Ship Based Production And Transportation Of Hlg (Heavy Liquified Gas)

...

Awarded: NOK 0.85 mill.

Project Period: 2007-2009

Location: Viken

DEMO2000-Prosj.ret tekn.utv. petro.virk

PRODML Pilot for Production Optimization and Intuitive Crisis Management

...

Awarded: NOK 2.3 mill.

Project Period: 2007-2009

Location: Viken

BIA-Brukerstyrt innovasjonsarena

New materials and methods for placement of a thin layer cap on contaminated seabed

The Norwegian Ministry of the Environment identified remediation of contaminated sediments as important. The total release of contaminants to the fjord environment from larger areas with moderate contaminant levels can be greater than that from smaller ar eas with higher contaminant concentration...

Awarded: NOK 12.0 mill.

Project Period: 2007-2011

Location: Oslo

FORINFRA-Nasj.sats. forskn.infrastrukt

Utvidelse av testanlegg ved IRIS - Ullrigg Bore- og Brønnsenter

Testanlegget vil bli bygget for å reprodusere virkelige brønnforhold slik at utstyr under utvikling kan bli utsatt for dette som en del av kvalifiseringen. Vår kompetanse og erfaring fra denne type anlegg vil bli vektlagt i det nye anlegget sammen med i nnspill som er gitt fra serviceleverandør...

Awarded: NOK 2.0 mill.

Project Period: 2007-2012

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Collaborative Decision Making in Integrated Operations

The CODIO project proposes to create a new synthesis of previous work in integrated operations, decision support, and semantic technology in order to improve decision making processes in future well planning and execution. The central component of the CO DIO architecture is a Dynamic decision mo...

Awarded: NOK 9.1 mill.

Project Period: 2007-2010

Location: Oslo