0 projects

PETROMAKS2-Stort program petroleum

Development of Geoscience-driven Machine Learning Applications for Basin Analysis and Exploration Play Evaluation

...main goal is to develop geoscience-driven Machine Learning (ML) applications (e.g. plug-ins to...industry geoscientists: (i) better understand the tectono-stratigraphic development of...and (ii) more accurately and quickly predict the nature and occurrence of hydrocarbons in...

Awarded: NOK 15,999

Project Period: 2016-2016

Location: Viken

PES-HORISONT-EU-PES Horisont Europa

Hybrid actuation system for safety critical valves and equipment

...will deliver actuators for valve- or equipment operations that support...Our solution is a Hybrid, utilizing 3 mediums for moving a valve or equipment: Nitrogen,...we design a control system, that based on machine learning can predict the health of the...

Awarded: NOK 74,999

Project Period: 2021-2022

Location: Agder

IKTPLUSS-IKT og digital innovasjon

The 6th ACM SIGIR / The 10th International Conference on the Theory of Information Retrieval

...The ACM SIGIR International Conference on the...to present and discuss research related to the theory and practice of Information Retrieval...harnesses Big Data and represents one of the most prominent and successful application...

Awarded: NOK 99,999

Project Period: 2020-2020

Location: Rogaland

IKTPLUSS-IKT og digital innovasjon

Hybrid Deep Learning Cellular Automata Reservoir

...The ambitious research goal of the DeepCA project...a theoretical and experimental foundation for a novel hybrid deep learning paradigm based on...biological neural networks, in order to bridge the gap between neuroscience and deep learning...

Awarded: NOK 7.8 mill.

Project Period: 2020-2023

Location: Oslo

FRINATEK-Fri prosj.st. mat.,naturv.,tek

Emergent networks: Predicting strain localization and fracture network development

...experimental time series of fracture networks and strain fields provide...unavailable. This access enables quantifying the dynamics of the transition from distributed to...community lacks a quantitative understanding of the criteria that govern the transition from...

Awarded: NOK 7.6 mill.

Project Period: 2020-2024

Location: Oslo

NAERINGSPH-Nærings-phd

Statistical methods for high dimensional sensor based monitoring of ship systems

...and inspections of ships performed by DNV GL have traditionally...to a time schedule. This philosophy is based on the assumption that a component has a defined...its failure rate increases. However, estimates of lifetime have large uncertainties and a large...

Awarded: NOK 1.6 mill.

Project Period: 2015-2019

Location: Viken

HAVBRUK2-Stort program for havbruksforskning

Selective Breeding of Copepods

...produces copepod eggs for the marine larviculture industry. An increase...and company value. Selective breeding is a powerful tool to increase the performance of a...in a population. By establishing a new line of highly fecund copepods through a selective...

Awarded: NOK 6.0 mill.

Project Period: 2021-2024

Location: Trøndelag - Trööndelage

IKTPLUSS-IKT og digital innovasjon

Mixed Reality Interactions across Contexts of Learning

...the last decade, information and communication...r ealities. However, in schools and museums, the potential of ICT have not been utilized as...take is needed to constitute a foundation for 3D web solutions as one central component in a...

Awarded: NOK 13.5 mill.

Project Period: 2010-2015

Location: Oslo

IS-TOPP-Toppfinans. av M.Curie-stipend

Common Language Resources and their Applications (CLARA)

...the past decades, language models have...towards systems based on statistics and machine learning of authentic data. The construction...e amounts of suitable, annotated language data for every language in question. Current approaches...

Awarded: NOK 0.44 mill.

Project Period: 2011-2014

Location: Vestland

FINNUT-Forskning og innovasjon i utdanningssektoren

Learning, Assessment and Boundary crossing in Teacher Education

...The project Learning, Assessment and Boundary...collaborative practices can be developed and learning processes examined. The research will take a...Research (DWR) approach developed in the frame of cultural historical activity theory (CHAT)...

Awarded: NOK 12.0 mill.

Project Period: 2019-2023

Location: Troms og Finnmark - Romsa ja Finnmárku - Tromssa ja Finmarkku

IKTPLUSS-IKT og digital innovasjon

Doctor AI2 – Artificial Intelligence mining of the Adaptive Immune system to develop an immunodiagnostics platform

...diagnosis of disease is key to optimal treatment and in...out diagnosis with unmatched precision before clinical symptoms arise. There is a gold rush...to assist doctors in everyday diagnosis. The adaptive immune system records each past and...

Awarded: NOK 9.2 mill.

Project Period: 2021-2024

Location: Oslo

NAERINGSPH-Nærings-phd

Machine Learning in Geophysical Processing and -Inversion

...pressure waves are used to extract important information about the subsurface physical properties...appearance. In seismic inversion you formulate the forward problem, in order to make...study we will investigate how we can use state of the art algorithms from both geoscience and...

Awarded: NOK 1.8 mill.

Project Period: 2018-2021

Location: Viken

ROMFORSK-Program for romforskning

MULTI-TEMPORAL SAR IMAGE ANALYSIS Robust surface change detection and time series analysis of SAR and POLSAR images

...to develop advanced signal processing and information retrieval approaches for tem- poral...multi-class surface cover classication, and the detection and measurement of temporal change....modeling. WP3: Feature extraction and machine learning. In WP1 all relevant ground truth...

Awarded: NOK 2.8 mill.

Project Period: 2009-2012

Location: Troms og Finnmark - Romsa ja Finnmárku - Tromssa ja Finmarkku

SFI-Sentre for forskn.drevet innov

BIG INSIGHT - Statistics for the knowledge economy

...INSIGHT produces innovative solutions for key corporate challenges facing a consortium...and applying original statistical and machine learning methodologies. Fulfilling the...behaviours and control processes that are at the core of the partners' innovation. This leads...

Awarded: NOK 96.1 mill.

Project Period: 2015-2023

Location: Oslo

NORKLIMA-Klimaendringer og konsekvenser for Norge

Climate change impacts in the Electricity Sector

...change will have impacts on electricity markets, both on demand and supply. In Norway,...likely impacts are that the supply of hydropower and wind power will be boosted by weather...in this sector will be different. The focus of this research is how the impacts for Norway and...

Awarded: NOK 7.4 mill.

Project Period: 2007-2013

Location: Oslo

ENERGIX-Stort program energi

HydroConnect - Impacts of connecting Norwegian hydropower to continental Europe and the UK

...countries are decarbonising their energy systems to meet climate targets. To...fossil sources, drastically increasing the share of unregulated power production....increases. Improved knowledge on how hydropower can be used to balance variable renewable...

Awarded: NOK 11.8 mill.

Project Period: 2021-2024

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Integrating Balancing Markets in Hydropower Scheduling Methods Integrasjon av balansemarkeder ved produksjonsplanlegging for vannkraft

...The future European electricity system will be...renewable intermittent generation than what is the case today. This development is e.g. driven by...European Union and decisio ns on downscaling of nuclear generation capacity. Tighter market...

Awarded: NOK 11.9 mill.

Project Period: 2013-2018

Location: Trøndelag - Trööndelage

AAL-Active and Assisted Living Research and Development Programme

HOME-based ICT solutions FOR the independent living of people with DEMentia and their caregivers

...The project will develop, test and bring to the...in detecting and to differentiate activities of daily living. The platform is targeted to be...removed or added and thus it can be adapted for most use cases. The sensors are optimized for...

Awarded: NOK 2.8 mill.

Project Period: 2015-2018

Location: Oslo

FRINATEK-Fri prosj.st. mat.,naturv.,tek

Constraining the Large Uncertainties in Earth System Model Projections with a Big Data Approach

...The increasing volume of climate model data makes...tool impractical. This hinders the discovery of new crucial knowledge for society. COLUMBIA...that aims to facilitate rigorous evaluation of large ensemble of Earth system models. The...

Awarded: NOK 11.3 mill.

Project Period: 2018-2022

Location: Vestland

RENERGI-Fremtidens rene energisystemer

Design, implementation and evaluation of environmental policy

...use inflicts costs on society in terms of negative external effects on the environment...and global warming). In this setting economists often talk of market failure, i.e. that...society do not lead to an efficient allocation of resources (including environmental resources)....

Awarded: NOK 4.3 mill.

Project Period: 2006-2008

Location: Vestland

ENERGIX-Stort program energi

Integration of Computational Fluid Dynamics(CFD) and Meteorological Modelling Techniques to Optimize Wind Farm Performance

...The aim of this project is to improve the wind...the operational phase by accurate predictions of wind turbine production and loading. Accurate...by inte grating mesoscale and microscale models. Recent improvements in both mesoscale...

Awarded: NOK 3.8 mill.

Project Period: 2013-2014

Location: Vestfold og Telemark

SUPOENER-SUP-OED Energi-sektoren

Wind energy strategic program 2003-2007

...is at the brink of a significant wind energy development...most notably by ScanWind aud Umoe Ryving. The aim of this project is to support the...will fund 5 PhD studies carried out at NTNU together with research at Institute for Energy...

Awarded: NOK 19.6 mill.

Project Period: 2003-2010

Location: Trøndelag - Trööndelage

FRINATEK-Fri prosj.st. mat.,naturv.,tek

Next Generation 3D Machine Vision with Embedded Visual Computing

...The overall objective of this research is to give...digitalization using real-time 3D vision and learning processes. This research aims to initiate an...3D sensing and online (embedded) visual learning engines that operate in natural environments...

Awarded: NOK 12.0 mill.

Project Period: 2021-2024

Location: Agder

SSF-Svalbard Science Forum

FEATURE DETECTION IN GLACIAL CHANNELS USING MACHINE LEARNING, RIS ID 11603

...For my master thesis I will be using machine...features to improve geometric reconstructions of glacial channels based on data collected from...campaign in 2021. There are two drifter platforms which will be deployed, one using GNSS...

Awarded: NOK 94,999

Project Period: 2021-2021

Location: Oslo

TJENESTER-Helse- og omsorgstjenester

Government financing of drug consumption in Norway and the markets for pharmaceuticals

...The starting point is the special structure of the...producers. Third party financing i s implied by the reimbursements of medical expenses made by the...and with relatively few firms participating in the market. The market for pharmaceuticals is...

Awarded: NOK 2.3 mill.

Project Period: 2006-2008

Location: Oslo

HELSEINNOVASJON-Helseinnovasjon

A framework for assistive robotics technology in personalised healthcare (ASSISTANT)

...The socioeconomic effects of morbidity and...for technologies that support the provision of healthcare services, the execution of...including training to keep and increase physical fitness across the entire cycle of life. The...

Awarded: NOK 0.30 mill.

Project Period: 2021-2021

Location: Agder

BIA-Brukerstyrt innovasjonsarena

Artificial intelligence based fraud prevention in digital advertising

...worldwide epidemic that affects market players of all sizes and across all industries resulting...on malicious and low-quality traffic sources. The development of entirely new transparent,...digital media buying and completely reshape the digital life of every company and every...

Awarded: NOK 15.9 mill.

Project Period: 2019-2023

Location: Viken

NAERINGSPH-Nærings-phd

High resolution wind farm simulations with CFD for Wind Resource Assessment and Forecasting

...is not always available when it is needed. Therefore, it is very important to have an...the electrical grid. WindSim AS has developed forecasting systems based on Artificial Neural...based on Computational Fluid Dynamics (CFD). The ANN solutions are very efficient when the...

Awarded: NOK 1.6 mill.

Project Period: 2017-2020

Location: Vestfold og Telemark

KLIMAFORSK-Stort program klima

Ensemble methods for improving climate predictions and estimating extreme events

...have played a significant role in improving forecasting skills for predicting the Northern...data assimilation with coupled climate models is still in its infancy. Particular issues...to the multiscale nature of coupled climate models pose problems for the data assimilation...

Awarded: NOK 0.24 mill.

Project Period: 2022-2022

Location: Vestland

IKTPLUSS-IKT og digital innovasjon

Testing of Learning Robots

...The future of industrial robotics is rooted in the...that can collaborate and learn with humans. These collaborative robots would have the ability...and improve their behaviours through the usage of machine learning algorithms. However,...

Awarded: NOK 10.2 mill.

Project Period: 2018-2022

Location: Oslo