481 projects

FORNY20-FORNY2020

Veritrack Wireless Micro Transmitter: Ultra low-power wireless process instruments with autonomous identifiable tag with wireless data trans

...

Awarded: NOK 2.0 mill.

Project Period: 2010-2012

Location: Trøndelag - Trööndelage

FORNY20-FORNY2020

Verification of a 3 dimensional integrated analog-to-digital-converter based on CMOS technology

...

Awarded: NOK 0.37 mill.

Project Period: 2010-2012

Location: Trøndelag - Trööndelage

IS-MOBIL-Mobilitetsprogr.f.utl.Ph.D-stu

Contributions to Type-2 Fuzzy Sets Theory and Applications in Control Engineering and Robotics

In this research, type-2 fuzzy-neural systems will be implemented to a robotic system, i.e. robotic manipulator. The reason is that the robots are highly nonlinear. They have also some uncertainties and it can be challenging to control a robotic manipulat or accurately. Because of the reasons men...

Awarded: NOK 41,000

Project Period: 2009-2009

Location: Ukjent Fylke

EUROSTARS-EUROSTARS

SensoNor Inertial Measurement Unit - System-in-Package (E! 4736 SIMU-SiP)

SensoNor Technologies will develop a novel series of complete Inertial Measurement Units (IMUs) as microsystems-in-package for a set of applications within down-hole surveying and instrumentation for land surveying, road construction, agriculture etc., ma ritime positioning and stabilization.

Awarded: NOK 8.1 mill.

Project Period: 2009-2012

Location: Vestfold

FRINATEK-Fri prosjektstøtte for matematikk, naturvitenskap og teknologi

Device concepts for micro energy harvesting

There is a big world wide effort on the development of energy scavenging devices to power wireless electronics. The research activities have demonstrated that this type of devices has a great potential for applications that can be driven by a few microwat ts. The basic motivation behind the field...

Awarded: NOK 10.7 mill.

Project Period: 2009-2013

Location: Vestfold

BIA-Brukerstyrt innovasjonsarena

SensoNor Inertial Measurement Unit

In the SIMU project, SensoNor will develop a novel series of MEMS gyros and complete Inertial Measurement Units (IMUs) for a set of applications within down-hole surveying and instrumentation for land surveying, road construction, agriculture etc., mariti me positioning and stabilization as well ...

Awarded: NOK 19.0 mill.

Project Period: 2009-2012

Location: Vestfold

ENERGIX-Stort program energi

Intelligent biogas fuelled energy conversion technologies

-

Awarded: NOK 7.8 mill.

Project Period: 2009-2014

Location: Rogaland

RENERGI-Fremtidens rene energisystemer

Utvikling og evaluering av ulike barrieresystem for statiske og dynamiske sjøkabler

Tradisjonelt benyttes det blant annet en (relativt tykk) metallisk ytterkappe i høyspente sjøkabler, oftest av bly, for å hindre at fuktighet trenger inn i det elektriske isolasjonssystemet. Fuktighet kan redusere den elektriske levetiden betydelig for bå de masseimpregnerte og polymere isolasjon...

Awarded: NOK 3.6 mill.

Project Period: 2009-2012

Location: Østfold

RENERGI-Fremtidens rene energisystemer

Utvikling av en enkel metode for tilstandskontroll av oljefylte høyspent kabelendeavslutninger

Den overordnede ideen med prosjektet er å forenkle samt gjøre sikrere tilstandskontroll av oljefylte høyspent kabelendemuffer. Dette betyr å utvikle en måleenhet som skal stikkes inn i luftehullet på toppen av kabelendemuffen. Måleenheten vil inneholde re lativ fuktighet-, temperatursensorer og d...

Awarded: NOK 1.00 mill.

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Air Insulated Switchgear Technology

-

Awarded: NOK 11.0 mill.

Project Period: 2009-2014

Location: Akershus

RENERGI-Fremtidens rene energisystemer

Norsk deltagelse i IEA ENARD Annex IV "Transmission systems"

Denne søknaden gjelder for deltagelse i IEA ENARD (ExCo) og Annex-ene I og IV. Hovedinnsatsen i prosjektet vil være knyttet til arbeidet i Annex IV. Prosjektsammendraget nedenfor er hentet fra arbeidsbeskrivelsene til hhv. Annex I og Annex IV: Annex I: I nformation Collation and Dissemination: ...

Awarded: NOK 0.84 mill.

Project Period: 2009-2011

Location: Oslo

ENERGIX-Stort program energi

Miljøgevinst ved Avanserte Måle- og Styringssystemer (AMS)

Trussel om klimaendringer har ført til økt fokus på energiforbruk. EU skal innen 2020 redusere CO2-utslippet med 20% og spare 20% energi, i forhold til en normal utvikling av energiforbruket. I Energi21 fokuseres det bl.a. på energieffektivisering i bygni nger og husholdninger og bruk av fjernavl...

Awarded: NOK 2.3 mill.

Project Period: 2009-2013

Location: Oslo

FORNY-3-Kommersialisering av FoUresultater

Verification of RF-choke free switching power amplifier circuit

...

Awarded: NOK 1.0 mill.

Project Period: 2009-2009

Location: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Teknologi for deteksjon av partielle utladninger i elektriske anlegg

Vi søker herved om å videreføre søknaden i prosjekt 174140/S30 System for Electric Diagnosis of Partial Discharges for Power System Apparatus . Målet med det nye prosjektet er å videreutvikle teknologi for minst fire nye innovative produkter. Det eksiste rende prosjektet sluttføres i 2008 med fø...

Awarded: NOK 3.4 mill.

Project Period: 2009-2011

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Optimal infrastructure for seamless integration of distributed generation - OiDG

Following the visions and strategies stated in the European SmartGrids2 Technology Platform as well as in the Norwegian energy sector strategy - Energi21 , seamless connection and integration of distributed generation (DG) into medium voltage (MV) and low voltage (LV) networks is one of the obje...

Awarded: NOK 7.7 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Vulnerability and security in a changing power system

The modern society is critically dependent on a secure electricity supply to maintain its functionality. Increased knowledge about the security of supply regarding vulnerabilities in the power grids and wide-area interruptions (blackouts) is very importan t to enable a secure and flexible power s...

Awarded: NOK 8.3 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Power Electronics for Reliable and Energy efficient Renewable Energy Systems

-

Awarded: NOK 12.7 mill.

Project Period: 2009-2014

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

'High Frequency Wind Power'.

Prosjektet omhandler løsninger for vindparker basert på likespenning. Ny omformerteknologi og transformering med høy frekvens gir systemer med lavere vekt og volum. Nøkkelteknologi er bruk av nanokrystallinske materialer i transformatorkjerner samt matriseomformere. Prosjektet omhandler særlig hv...

Awarded: NOK 7.4 mill.

Project Period: 2009-2014

Location: Trøndelag - Trööndelage

RBGRUNTEKN-Resultatbasert grunnbevilgning - Tekn.ind.institutter

Grunnbevilgning SINTEF Energi

...

Awarded: NOK 242.4 mill.

Project Period: 2009-2019

Location: Trøndelag - Trööndelage

IS-TOPP-Toppfinans. av M.Curie-stipend

Low-light and Fluorescence Hyperspectral Imaging

The topic of the project is experimental work in the field of hyperspectral imaging. A brief general description of this field is given below. The work will be done mainly at Norsk Elektro Optikk AS (NEO), but in close collaboration with FFI and NTNU. Th e main focus of this project is the devel...

Awarded: NOK 0.84 mill.

Project Period: 2008-2011

Location: Akershus

RENERGI-Fremtidens rene energisystemer

Wide Area Control Systems (WACS) for control of FACTS/HVDC

Prosjektet Wide Area Control Systems (WACS) for control of FACTS & HVDC baseres på resultater fra prosjektet 'Wide Area Monitoring and System Protection for Power System Security' (NFR prosjektnr 168509). Der ble en prototype for en ny type målesystemer e tablert, som gir presise målinger av stab...

Awarded: NOK 1.7 mill.

Project Period: 2008-2011

Location: Akershus

RENERGI-Fremtidens rene energisystemer

General competence of CRT

CRT is first a hydropower machine which consist of two machines, the turbine and the generator integrated into one cohesive construction. In addition is the machine built with the two contra rotating stages integrated into one hydro dynamical optimal turb ine concept. This construction gives man...

Awarded: NOK 1.6 mill.

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Moderne, pålitelige PEX kabler med våt konstruksjon

Prosjektets hovedformål er å redusere vanntreveksten i våte kabelkonstruksjoner: a) Reduksjon av inndiffusjon av vann b) Redusere / eliminere SIED degradering c) Optimalisere tilsatsstoffer (type/mengde) i isolasjonssstemet a) Reduksjon av inndiffundert vann Det har vist seg at det ligger betyde...

Awarded: NOK 1.7 mill.

Project Period: 2008-2010

Location: Oslo

IS-AUR-Samarb.progr. mellom Norge og Frankrike

Weman, Helge Aurora 2008-09 Fransk-norsk forskerutveksling

...

Awarded: NOK 0.10 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

IS-DAAD-Forskerutveksling Norge-Tyskland

Jiang, Yuming DAADppp 2008-09 Tysk-norsk forskerutveksling

...

Awarded: NOK 30,000

Project Period: 2008-2010

Location: Trøndelag - Trööndelage

TU-Tungt utstyr

Avansert trykktank for testing av elektrisk utstyr til bruk på havbunnen

Undervannsteknologi er en viktig nøkkel for videre utnyttelse av olje- og gass¬ressursene på norsk sokkel og i farvann utenfor Norges grenser. En har lenge hatt undervanns¬installasjoner for å produsere fra brønner, men brønnstrøm har hittil vært ført upr osessert til plattform eller land der pro...

Awarded: NOK 3.9 mill.

Project Period: 2007-2007

Location: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

A NEW CONCEPT FOR POWER QUALITY AND RELIABILITY MEASUREMENT AND MANAGEMENT-THE PQM PROJECT

Quality of supply problems in T&D systems increase both due to increased pollution in networks (increased emission) and due to increased use of electrical equipment that are sensitive to disturbances (reduced immunity). Customers quality of supply requir ements with respect to reliability and vo...

Awarded: NOK 12.6 mill.

Project Period: 2007-2012

Location: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

FoU ved Vannkraftlaboratoriet, NTNU

Prosjektets hoved aktivitet er knyttet til doktorgradsutdannelse ved Vannkraftlaboratoriet på NTNU. I løpet av søknadsperioden på 4 år vil 4 nye PhD kandidater uteksamineres. Dette vil bidra til forskning innen fagtema omforent med bransjen og sørge for r ekruttering av høyt kvalifisert personell...

Awarded: NOK 1.8 mill.

Project Period: 2007-2009

Location: Oslo

RENERGI-Fremtidens rene energisystemer

Norsk deltagelse i IEA implementing Agreement on Electricity Network Analysis, Research and Development.

Denne søknaden gjelder for deltagelse i Annex I. I utkastet til ?Program of Work? (Version 0, 16. March 2006) er det gitt følgende beskrivelse av sentrale problemstillinger og sentrale FoU-utfordringer: Annex I: Information Collation and Dissemination. S cope The central focus of Annex I will be...

Awarded: NOK 0.70 mill.

Project Period: 2007-2009

Location: Oslo

RENERGI-Fremtidens rene energisystemer

Spenningsstabilisering i svake 12-24 kV nett ved distribuert kraftproduksjon

Målet er å kunne bidra til å øke antall økonomisk lønnsomme utbygginger av distribuert kraft i nettet. Som regel ligger den nye kraften langt ute i nettet, og betinger oppgraderinger for å kunne overføre energien uten for store spenningsvariasjoner. I m ange tilfeller vil kostnadene til tradisj...

Awarded: NOK 2.1 mill.

Project Period: 2007-2009

Location: Trøndelag - Trööndelage