PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Electrocoalescence - Criteria for an efficient process in real crude oil systems

The fundamental mechanism active in the electrocoalescence process has been identified as a formation of an electrohydrodynamical surface instability. Hydrodynamic models for drop movement has been established and verified experimentally in model systems. This far, coalescence has been studied u...

Awarded: NOK 12.5 mill.

Project Period: 2006-2010

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

WIRESCAN Sub-Sea Development Project Real-Time Condition Monitoring and Analysis for Sub-Sea Wire Systems

...

Awarded: NOK 3.0 mill.

Project Period: 2006-2009

Location: Akershus

FRINAT-Matematikk og naturvitenskap

Computational models and methods to study the dynamics of gas hydrates

The objective of the project is to gain a better understanding of the conditions under which gas hydrates exist in oil and gas pipes. The project aims to design and apply molecular dynamics techniques to study the creation and dissociation of such hydrate s. The molecular dynamics simulations wil...

Awarded: NOK 3.6 mill.

Project Period: 2006-2011

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Free convection effects in pipes and complex geometries exposed to cooling

...

Awarded: NOK 1.6 mill.

Project Period: 2006-2009

Location: Buskerud

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Condition- and performance-monitoring of critical subsea and topside systems and equipment

...

Awarded: NOK 13.7 mill.

Project Period: 2006-2010

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

High Pressure Gas Liquid Separation

...

Awarded: NOK 12.8 mill.

Project Period: 2005-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Hydrates in petroleum production - Assessment of Plug Risk

During transport of oil, gas and water in pipelines, solid gas hydrate plugs may form when the conditions are within the thermodynamic range of stability of natural gas hydrates. The cost of hydrate prevention is often a project stopper for small field de velopments. However, the presence of oil ...

Awarded: NOK 6.4 mill.

Project Period: 2005-2009

Location: Vestland

SIPOPETR-SIP-OED Petroleumssektoren

Droplet Transport Modelling and Generation Enhancement in Hydrocarbon Multiphase transport

Liquid accumulation due to velocity difference between gas and liquids has a significant influence on the capacity and operability of a multiphase hydrocarbon production system. Droplet transport increases the liquid transport and thereby reduces the liqu id accumulation. Present models for dropl...

Awarded: NOK 10.0 mill.

Project Period: 2005-2009

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Mobile Test Unit for Liquid Holdup Measurement in Gas Condensate Pipelines using Tracers

...

Awarded: NOK 2.7 mill.

Project Period: 2005-2011

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Enabling production of remote gas

The main focus in project is to address the critical technology barriers related to floating production of natural gas from smaller fields through a coordinated effort by industry and research institutions. Specific challenges are: Safety, movement of pro cess equipment, weight and compactness as...

Awarded: NOK 27.5 mill.

Project Period: 2005-2009

Location: Trøndelag - Trööndelage

SUPOPETR-SUP-OED Petroleumssektor

Enabling technology for sub sea production of oil and gas using electricity for power supply and control.

Fundamental research and development of new competence at NTNU, will provide a basis for the creation of more cost-effective technology for oil and gas production from smaller or complex sub sea fields. Further, increased recovery from mature fields requi res electric power for water or gas injec...

Awarded: NOK 8.9 mill.

Project Period: 2005-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Økt transportutnyttelse gjennom optimalisering av strømningskontroll og operasjonsstyring

...

Awarded: NOK 1.6 mill.

Project Period: 2004-2009

Location: Rogaland