0 projects

MAROFF-2-Maritim virksomhet og offsh-2

Low Carbon Shipping

Previous studies have indicated that shipping has a potential to reduce GHG emissions in a cost-effective manner (i.e. emissions can be cut with net cost savings) . These options often increase the price of new ships (or upgrading of existing), but provid es substantial cost saving in a life-time...

Awarded: NOK 5.2 mill.

Project Period: 2010-2012

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

ADEMAR - advanced decision-support system for the development of global maritime logistics networks

The maritime industry constantly faces a number of commercial, technological and societal challenges. Many current challenges are closely linked to the globalization of world trade which has led to greater value chain complexity, and to new and demanding maritime operations in harsh environments...

Awarded: NOK 93,999

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

IT-FUNK-IT for funksjonshemmede

Den røde tråd, universell utforming i langvarige elektroniske tjenestedialoger

Den røde tråd er et tilleggsprosjekt til Verdikt-prosjektet Semicolon som avsluttes 31.12.2010. Den overordnede idéen med Semicolon er å bidra til økt samhandling i offentlig sektor og, som et resultat av det, mellom offentlig og privat sektor. Hensikten med Den røde tråd er å utvide Semicolon-...

Awarded: NOK 1.00 mill.

Project Period: 2009-2010

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

RObots in Tanks

The proposed project ?RObots in Tanks? (ROT) aims to foster the development, application and integration of new manufacturing and inspection processes for narrow, highly inaccessible, dirty and complex enclosed spaces on vessels, like ballast water tanks. These processes will use a new generatio...

Awarded: NOK 0.80 mill.

Project Period: 2009-2012

Location: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of nanoparticle aerosol exposure scenarios for workers in research laboratories using case studies and experimental simulations

...

Awarded: NOK 74,999

Project Period: 2009-2009

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Design-stage Energy Optimisation / Air-Emission Reduction of Ships (DEO/AEROS)

Issues concerning emission reduction of particular relevance in the design stage may be summarised in four key factors, none of which may be neglected during the different design stages, but where DEO will focus on items 1 and 2: 1.Increasing the logistic s chain efficiency (kWh /work) 2.Increasi...

Awarded: NOK 4.7 mill.

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Marine Icing

The rationale for this project is the lack of adequate tools and guidelines for safer operation in icing-prone waters. Knowledge of icing and the ability to forecast potential icing events in time and space will be important to secure safe operations. De velopment of improved and verified models...

Awarded: NOK 10.8 mill.

Project Period: 2009-2013

Location: Akershus

HAVBRUKS-Havbruk - en næring i vekst

SUSTAFISH: Sustainable aquaculture: water quality as a test parameter for meeting sustainability certification and management requirements

Fish is an important source of protein worldwide. Ensuring that the fish sold is sustainably produced is in focus from producer organisations, retailers and consumers. Development and implementation of certification schemes is considered as one tool to he lp towards a more sustainable aquaculture...

Awarded: NOK 24,999

Project Period: 2009-2009

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Design-stage Energy Optimisation and Air-Emission Reduction of Ships (DEO-AEROS) - pre-project

Issues concerning emission reduction of particular relevance in the design stage may be summarised in four key factors: 1. Increasing the logistics chain efficiency (kwh produced/work performed) 2. Increasing the efficiency of the ship(s) (kwh produced/w ork performed) 3. Increasing the specific...

Awarded: NOK 0.13 mill.

Project Period: 2008-2008

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

MARLEN - Maritime Logistics Chains and the Environment

The principal objective of the project is to: Obtain and systematize facts and knowledge regarding the main operational and organizational conditions that may influence the energy efficiency and environmental profile/performance of alternative maritime l ogistics chains, and thereby reduce the p...

Awarded: NOK 4.5 mill.

Project Period: 2008-2010

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Reducing Impact from Shipping on the Environment

The project will encompass three activities Ship emission indicator Today's serious concern is on global climate and local air pollution in densely populated areas. This proposal will concentrate on ship emissions to the air. Special focus is on following items: - Decision on emission components...

Awarded: NOK 2.9 mill.

Project Period: 2008-2010

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Superintendent's Manual / Owner's Portal

I en svært raskt skiftende verden hvor informasjonstilgangen synes å være eksponentielt økende, er det behov for ulike virkemidler for å understøtte beslutningstakere i den maritime industrien. Dette innebærer bl.a.: - Videreutvikling og tilgjengeliggjør ing (i ulike kommunikasjonskanaler og bes...

Awarded: NOK 2.3 mill.

Project Period: 2008-2009

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Optifoul Project

The roughness of the surface of the hull is one of the major factors that contribute to the overall fuel consumption of the vessel. Measurements of the hydrodynamic drag of different commercially available antifouling coatings have shown that surface roug hness between different antifouling syste...

Awarded: NOK 1.0 mill.

Project Period: 2008-2012

Location: Akershus

VERDIKT-Kjernekomp.og verdiskaping IKT

Dependable ICT for the Energy Sector

Software as an integrated part of critical components used in O&G installations is increasingly being used in the oil & gas industry, because it promises more functionality, lower building costs, lower cost of operation, as well as higher flexibility for future changes and upgrades. In particular...

Awarded: NOK 10.5 mill.

Project Period: 2008-2012

Location: Akershus

RENERGI-Fremtidens rene energisystemer

International Energy Agency - Hydrogen Implementing Agreement - Annex 19 -Hydrogen Safety - Extension to 2010

Risk analysis methodology and CFD tools are widely used in the industry for predicting accidental loads and designing safe plants, as well as in transport on road, rail, in the air and at sea. Using similar methods for the safe introduction of hydrogen as an energy carrier would be a natural cho...

Awarded: NOK 2.1 mill.

Project Period: 2008-2012

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Forprosjekt - Maritime logistics and the environment - Fact book

Maritim industri vil til en hver tid stå ovenfor en rekke foretningsmessige og samfunnsmessige utfordringer. Mange av dagens utfordringer er tett knyttet til globalisering av verdenshandelen. En av de viktigste utfordringene i denne sammenheng er det st erkt økende fokus som nå er på energiforb...

Awarded: NOK 0.15 mill.

Project Period: 2007-2008

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Superintendent's Manual / Maritime Technical Knowledge Exchange

The preliminary project shall primarily focus on the preparation and specification of the upcoming main project as per the following: - Describe and demonstrate the technology related to the MTKE - Map and define/formulate the uncovered requirements / i mprovement potentials in the targeted sec...

Awarded: NOK 0.15 mill.

Project Period: 2007-2008

Location: Akershus

VERDIKT-Kjernekomp.og verdiskaping IKT

Semantisk interoperabilitet i kommuniserende og samhandlende organisasjoner

Sammendrag Dette er en søknad hvor offentlig virksomhet er bridragsyter. Den overordnede idéen er å bidra til økt samhandling i offentlig sektor og, som et resultat av det, mellom offentlig og privat sektor. Vi finner svar på både organisatoriske og sema ntiske interoperabilititetsutfordringer g...

Awarded: NOK 17.6 mill.

Project Period: 2007-2011

Location: Akershus

RENERGI-Fremtidens rene energisystemer

Sikkerhet, regelverk, standardisering og koordinering av aktiviteter

Identifisere aktørene De ulike aktørene/bedriftene som arbeider med teknologi tilknyttet å nyttiggjøre hydrogen som energibærer identifiseres. Dette kan omfatte både de bedrifter som har konkrete prosjekter, de bedrifter/virksomheter som har planer og de bedrifter som kan tenkes å være en fremtid...

Awarded: NOK 0.15 mill.

Project Period: 2007-2008

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

FellowSHIP - Fuel Cells for Low Emission Ships

FellowShip is a joint industry R&D project to develop and demonstrate hybrid fuel cell power packs suitable for landbased, marine and offshore use. The power packs build on fuel cell technology in hybrid configurations with conventional engines, in combin ation with new electrical-, power electro...

Awarded: NOK 31.5 mill.

Project Period: 2007-2010

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Use of adhesive polymer film as replacement for anti corrosion and anti fouling coating in a maritime environment

The idea behind the MARFILM project is to verify that adhesive polymer film can be used for corrosion protection purposes and replacement for antifouling coatings. This verification process is an essential part of the R&D project as there are no independ ent investigations of the corrosion prote...

Awarded: NOK 1.4 mill.

Project Period: 2006-2010

Location: Akershus

BIA-Brukerstyrt innovasjonsarena

Long-Term Records Management

The particular problems addressed by LongRec typically emerge when document lifetime exceeds 20 years, and LongRec imposes no upper limit on the lifetime. The main objectives for the LongRec partners are: Objective 1: To enable transition to digital o riginal documents and digital work proces...

Awarded: NOK 9.5 mill.

Project Period: 2006-2010

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Safe Maritime ICT

Software as an integrated part of components onboard vessels, as well as a component in its own right controlling essential systems of physical components (machines) is increasingly being used in vessels, because it promises more functionality, better cre w guidance, lower vessel building costs, ...

Awarded: NOK 2.7 mill.

Project Period: 2006-2008

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Process Qualification - Phase II

...

Awarded: NOK 1.4 mill.

Project Period: 2006-2010

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

IKT-teknologier og -løsninger for sanntids miljøovervåking av olje- og gassinstallasjoner med hovedfokus på nordområdene

Miljørisikoen i nordområdene er vurdert som større enn i de fleste andre havområder. Innføringen av Integrerte Operasjoner (IO) i nordområdene åpner imidlertid muligheten for innføring av en ny generasjon, sanntidsbaserte miljøovervåkingsløsninger. OLF, DNV og UIO ønsker å bidra til dette gjenno...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Maritime Emission Mitigation

Det søkes om forprosjektmidler for å etablere en hovedprosjektsøknad med prosjektinnhold som beskrevet under. Shipping står for ca 2/3 av varetransporten i verden. Samtidig bidrar shipping med en betydelig andel av de globale utslipp av NOx, SOx og CO2, men har tradisjonelt ikke hatt strenge mil...

Awarded: NOK 0.15 mill.

Project Period: 2006-2006

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Amplitude-LNG Loading System Fabrication & Qualification

...

Awarded: NOK 0.73 mill.

Project Period: 2006-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Intelligent Data Sheets and Collaborative Work Processes Methodology, Product Model, Testing and New Business Processes

...

Awarded: NOK 7.5 mill.

Project Period: 2006-2008

Location: Akershus

RENERGI-Fremtidens rene energisystemer

International Energy Agency - Hydrogen Implementing Agreement - Annex 19 - Hydrogen Safety -

Risk analysis methodology and CFD tools are widely used in the industry for predicting accidental loads and designing safe plants, as well as in transport on road, rail, in the air and at sea. Using similar methods for the safe introduction of hydrogen as an energy carrier would be a natural cho...

Awarded: NOK 0.60 mill.

Project Period: 2006-2008

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Three dimensional Safety Zone

Aviation control introduced safety zones around air planes for decades ago and it has proven to be safe and reliable. If similar safet zones concepts can be developed for maritime traffic then a corresponding safety gain could be harvested. This projec t will develop a three dimensional safety...

Awarded: NOK 1.6 mill.

Project Period: 2006-2007

Location: Akershus