0 projects

DIP-Design Pilot

Float Comfort - DP086

...

Awarded: NOK 0.27 mill.

Project Period: 2010-2011

Location: Møre og Romsdal

DIP-Design Pilot

Utvikling av "Intelligent Energy Monitoring System" - DP052

...

Awarded: NOK 0.15 mill.

Project Period: 2010-2011

Location: Oslo

DIP-Design Pilot

Smått er smart - DP042

...

Awarded: NOK 0.27 mill.

Project Period: 2010-2011

Location: Trøndelag - Trööndelage

DIP-Design Pilot

Kvalitetskontroll i medisinske laboratorier - fra pliktøvelse til verdiskapende merkevare - DP011

...

Awarded: NOK 0.35 mill.

Project Period: 2010-2012

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

MAKS: maritimt kontrollsystem for framtiden

Skipstekniske systemer blir mer og mer komplekse. Og kontroll og styring av maskiner og teknisk utrustning blir mer og mer problematisk for operatørene etter som systemer med ulike brukergrensesnitt adderes - også innen Green shipping utvikling. Utvikling en på området har vært teknologisk og har...

Awarded: NOK 0.15 mill.

Project Period: 2010-2011

Location: Vestfold

DIP-Design Pilot

UTURN - DP016

...

Awarded: NOK 0.45 mill.

Project Period: 2010-2011

Location: Vestfold

DIP-Design Pilot

Arbeidslivsformer i endring: Scenarier og konsepter for framtida - DP030

...

Awarded: NOK 0.31 mill.

Project Period: 2010-2012

Location: Oslo

DIP-Design Pilot

Resirkulering av porselen - fra problem til verdi - DP054

...

Awarded: NOK 87,097

Project Period: 2010-2012

Location: Rogaland

MAROFF-2-Maritim virksomhet og offsh-2

Utvikling av Elektrisk Motorstyring for 3kV Undervanns intervensjon

Prosjektet tar sikte på å klargjøre tekniske og operasjonelle aspekter ved bruk av distribuert (subsea) kraft-distribusjon til elektriske motorer basert på inverterdrift med 3kV driftsspenning. Det søkes en løsning med elektronikk montert i trykkompensert dielektrisk medium. Teknologiske utford...

Awarded: NOK 0.15 mill.

Project Period: 2010-2011

Location: Rogaland

DIP-Design Pilot

Nigth Care - DP079

...

Awarded: NOK 0.22 mill.

Project Period: 2010-2012

Location: Akershus

FORNY20-FORNY2020

ScaleM - SCALable and rEliable fabric Manager

...

Awarded: NOK 0.20 mill.

Project Period: 2010-2011

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Integrated Decission support approach for ship, fleet, and maritime supply chain design

The maritime industry constantly faces a number of commercial and technological challenges. Many current challenges are closely linked to the globalization of world trade which has led to greater value chain complexity. New and demanding maritime operati ons in harsh environments like in the Arc...

Awarded: NOK 0.15 mill.

Project Period: 2010-2011

Location: Trøndelag - Trööndelage

FORNY20-FORNY2020

Composite Buoyancy

...

Awarded: NOK 2.2 mill.

Project Period: 2010-2012

Location: Trøndelag - Trööndelage

DIP-Design Pilot

Stativ til Less båresystem - DP033

...

Awarded: NOK 0.23 mill.

Project Period: 2010-2011

Location: Innlandet

MAROFF-2-Maritim virksomhet og offsh-2

Elektrisk drevet utenbordsmotor

Det skal utvikles konsept for elektrisk drevet utenbordsmotor basert på direkte propelldrift av en avansert vannkjølt elmotor og kraftelektronikenhet plassert i undervannshuset. Det må utvikles en ny el-motor med et forholdsvis lavt turtall og høyt dreie moment tilpasset en optimal utformet unde...

Awarded: NOK 2.5 mill.

Project Period: 2010-2012

Location: Agder

MAROFF-2-Maritim virksomhet og offsh-2

Onboard VOC, Cargo and Energy Recovery System

Hamworthy Gas Systems has devised and applied for patents for a system whose aim is to reduce and recover VOC emissions in conjunction with loading and transport of partially volatile cargo by tanker vessels. The system consists of several components, b oth active and passive giving the ability...

Awarded: NOK 0.15 mill.

Project Period: 2010-2010

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Forprosjekt for fremtidens utslippsfrie skip

Norge har satt som mål at den globale middeltemperatur ikke skal øke mer enn 2 °C fra førindustriell tid. Forskere har identifisert dette som en avgjørende terskel for å unngå de mest dramatiske konsekvensene av global oppvarming. En norsk studie publiser t i tidsskriftet Climatic Change i juni 2...

Awarded: NOK 0.15 mill.

Project Period: 2010-2011

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Reduksjon av NOx i avgasser fra marine forbrennningsmotorer

For at Norge skal kunne oppfylle sine forpliktelser i henhold til Gøteborgprotokollen må NOx-utslipp ytterligere reduseres. Det er stort fokus på innenriksflåten som stå for 38 prosent av Norges samlede utslipp av NOx i 2007. SINTEF MK sammen med MATINTE K og Yarwil ønsker å avklare muligheter f...

Awarded: NOK 61,012

Project Period: 2010-2011

Location: Oslo

JTI-Joint Technology Initiatives

ARTEMIS Call 2 Prosjekt iFEST

iFEST will specify and develop an integration framework for establishing and maintaining tool chains for engineering of complex industrial embedded systems; a significant technical contribution in the field of embedded systems technology. Central to iFES T are open tool chains targeting HW/SW co...

Awarded: NOK 5.8 mill.

Project Period: 2010-2013

Location: Akershus

BIONÆR-Bionæringsprogram

Valuing Norwegian wool

The project responds to the programme main goal; to increase sustainable value creation from value chains based on natural resources through knowledge production enhancing innovation, profitability and market sensitivity. Contrary to other rural industr ies such as food production and tourism, ...

Awarded: NOK 4.3 mill.

Project Period: 2010-2013

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

LNG Fuel Tank for ships and other marine applications, developed on the NLI TS X system.

Goal The TS-X LNG Fuel Tank project has the overall objective of researching and thus verifying the TS-X concept for LNG Fuel Tank systems for marine applications. Main challenges Low/cryogenic temperatures: LNG is cryogenic at -162 degrees centigrade. T his sets high demands on the choice of ma...

Awarded: NOK 3.2 mill.

Project Period: 2010-2011

Location: Vestfold

MAROFF-2-Maritim virksomhet og offsh-2

Forprosjekt for uttesting av ny teknologi for energigjenvinning i marine gassmotorer

RR ønsker å utvikle enda renere lean burn gass motorer spesielt med tanke på metanslipp og reduserte CO2 utslipp. For å kunne realisere etterbehandling og varmegjenvinning må motoren tilpasses dette. RR må gjennomføre målinger for å dokumentere CO2 ekviva lente gevinster av etterbehandling av eks...

Awarded: NOK 1.4 mill.

Project Period: 2010-2010

Location: Møre og Romsdal

IT-FUNK-IT for funksjonshemmede

Innovation for all - European Business Conference on Inclusive Design

...

Awarded: NOK 0.15 mill.

Project Period: 2010-2010

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Integrated Marine Operations, theory for design, simulation, training and evaluation

Anchor-handling at depths of several thousand metres, precise assembling of subsea modules weighing several hundred tons, rig-construction in the ice and the cold of the northern regions, development of small, distant fields etc, are all examples of more demanding marine operations. The complex...

Awarded: NOK 19.8 mill.

Project Period: 2010-2015

Location: Møre og Romsdal

MAROFF-2-Maritim virksomhet og offsh-2

Arctic DP: Safe and Green Dynamic Positioning Operations of Offshore Vessels in an Arctic Environment

KMB prosjektet Arctic DP forskar innan sikre og effektive offshore operasjoner i arktis som inkluderer dynamisk posisjonering (DP) av offshore fartøy i drivis. Me forskar langs tre hovudaksar: A) Matematiske metoder og algoritmer for kompensering av islaster i eit DP kontrollsystem. B) Numeri...

Awarded: NOK 14.9 mill.

Project Period: 2010-2014

Location: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Improved ship design and operation, by operational data aggregation, key performance indices and numerical optimization

Prosjektet har utviklet en demonstratorversjon av et skipsdesignverktøy. Basert på simulatormodeller av mulige komponenter i et designs energisystem, kan programmet finne hvilke komponenter som bør installeres for best mulig å passe designets forventede driftsprofil. Prosjektet har utviklet et...

Awarded: NOK 14.0 mill.

Project Period: 2010-2016

Location: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

New modes of collaboration in the maritime industry

The Norwegian maritime sector is a strong and complete national cluster that is globally competitive. The cluster is characterized by close local inter-firm interaction, with increasing international linkages. Linkages include foreign guest workers, forei gn ownership of maritime firms, outward f...

Awarded: NOK 6.6 mill.

Project Period: 2010-2015

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Entry and Berthing Ship and Port Advising System as an Element of Port ITS

Safety is a severe issue for the ship approach to a port. The choice of manoeuvring procedures is based on the ship in combination with the Harbour Master experiences which have the potential for failing in difficult weather conditions, because of the str ong dynamic variability in near coastal a...

Awarded: NOK 2.2 mill.

Project Period: 2010-2013

Location: Vestland

SAMF-Fagkomiteen for samfunnsvitenskap

Consortium of international market research, annual conference, May 26-29, 2010

The project is principally to organize the CIMaR 2010 conference, with participants from about 25-30 countries. Invitations will be sent early Fall 2009, with subsequent follow-up rounds, paper submissions/reviews and carry out the conference in late May 2010. An integral part of the project i...

Awarded: NOK 0.25 mill.

Project Period: 2010-2010

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Advanced environmental design optimalisation & control

The program will demonstrate technologies within simulation and control technologies that will give substantial better vessel efficiency, reduced emissions and increased safety. This is not available in the market today. A complete understanding of the use of energy during the ship design phas...

Awarded: NOK 15.0 mill.

Project Period: 2010-2012

Location: Vestland