0 projects

Selections based on text queries do not reflect the Research Council's published statistics. Read more...


Text queries provide an overview of all projects containing the specified text in either its title or summary. This may result in a different selection of projects than that used by the Research Council as presented in its various publications. The Research Council's statistics are normally based on selections in set categories. You will find these in the left menu, in the diagrams themselves or when selecting from the left column of autocomplete suggestions via the search field.

Les mer...

DEMO2000-Prosj.ret tekn.utv. petro.virk

Pilot gjenvinningsanlegg til behandling og nyttegjøring av petroleumsavfall med borekaks som råvare i tilslags masse til mørtel og betong

...Gjenvinning vil bygge et pilotanlegg for å behandle 9 000 tonn borekaks fra petroleumsindustrien...betydelig inhomogenitet i massene som skal behandles, noe som kompliserer prosessen betydelig....fragmenter til å bli innsatsfaktor eller råstoff i nye løsninger. Optimalisering av...

Awarded: NOK 6.0 mill.

Project Period: 2024-2025

Location: Rogaland

TU-Tungt utstyr

Molekylær og funksjonell MR

...gode evalueringer, bl.a. Forskningsrådets biofagevaluering, tildeling av Marie Curie Training...deltaker i den høyt evaluerte SFF-søknaen "MR and Ultrasound for Improved Patient C are", og som...oppgave at universitetsbrukere fra de andre universitetene i Norge kan komme til...

Awarded: NOK 1.5 mill.

Project Period: 2004-2006

Location: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Utvikling av et funksjonelt og økonomisk nedsenkbart oppdrettsanlegg

...viser at oppdrett vil foregå på mer ekspanderte lokaliteter. I de fleste land med egen...så er det ofte et press på havområdet nærmest land. Det er også flere steder en økende motst and...forurensing fra bl.a. oppdrettsanlegg. Mange land har besluttet å satse på akvakultur, men for...

Awarded: NOK 0.70 mill.

Project Period: 2006-2008

Location: Trøndelag - Trööndelage

HOYKOM-Høyhastighetskommunikasjon

Vats friskule- eit elektronisk kulturnav i disgtriktsbygda

...Skulen kom i gang i august 2004 etter at den offentlege skulen vart nedlagt, Med det planlagde...med og utveksle kunnsap og erfaringar med andre pedagoiske miljø, med heimane og med bygda...resultat av dette arbeidet til beste også for andre innbyggjarar i bygda.. Prosjektet føreset...

Awarded: NOK 0.14 mill.

Project Period: 2005-2005

Location: Buskerud

PETROMAKS2-Stort program petroleum

Interpretation of frequency-dependent seismic responses of finely layered, partially saturated and fractured reservoirs

...

Awarded: NOK 7.6 mill.

Project Period: 2017-2020

Location: Trøndelag - Trööndelage

IT-FUNK-IT for funksjonshemmede

Tilleggsprosjekt: Norsk OSIRIS og universell utforming (Hovedprosjekt 168178)

...splittet opp i fire moduler: Modul 1. State of the art: I denne modulen dannes det faglige...Intervjuer skal avdekke tjenesteleverandørenes synspunkter og profesjonelle og private...som hovedhensikt å koordinere arbeidet i de 3 andre modulene, og å sy sammen resultatene....

Awarded: NOK 0.87 mill.

Project Period: 2006-2007

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Jordobservasjon med ubemannede luftfarkoster

...er oppgaver som vi mennesker finner risikofylte, repeterbare og/eller...datakvalitet skal vi fly så lavt som mulig, ofte i i tøffe klimatiske eller topografiske...kostnadsnivå i operasjon og er nær sagt risikofri for mennesket. En RPAS som måler med flere...

Awarded: NOK 7.7 mill.

Project Period: 2016-2019

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Optimal levetidsutnyttelse av vannkraftanlegg basert på overvåking av teknisk tilstand og risiko

...en integrering av avanserte systemer for tilstandsovervåking og klassiske metoder for...(2014). Systemer for avansert tilstandsovervåking som bruker data fra vern- og...kunnskap og modeller om å benytte avansert tilstandsovervåking til levetidsmodellering,...

Awarded: NOK 6.4 mill.

Project Period: 2015-2019

Location: Oslo

VILLAKS-Forskningsprogram om villaks

Taxonomy, phylogeny and distribution of Gyrodactylus spp. with emphasize on parasites from Norwegian salmonids

...

Awarded: NOK 2.7 mill.

Project Period: 2001-2006

Location: Oslo

MANGFOLD-Biologisk mangfold-dynamikk, t

Species richness and host specificity of phytophagous beetles in two different types of tropical forests in Panama

...

Awarded: NOK 1.8 mill.

Project Period: 2001-2005

Location: Ukjent Fylke

LANDSKAP-Landskap i endring. Bruk og forvaltning

LAND. Population dynamics of aquatic top predators: effects of harvesting regimes and environmental factors.

...

Awarded: NOK 1.7 mill.

Project Period: 2001-2007

Location: Oslo

NETT-Stimulerings-/nettverksbygging

Modelling opportunities and limits for restructuring Europe towards sustainability (MOSUS)

...

Awarded: NOK 99,999

Project Period: 2002-2004

Location: Oslo

PROFO-Forurensning – kilder, spredning og effekter

Study of the physical properties and the chemical characterisation of particulate matter at Birkenes

...

Awarded: NOK 1.1 mill.

Project Period: 2003-2005

Location: Akershus

PROFO-Forurensning – kilder, spredning og effekter

Bioavailability and effects of organochlorine contaminants in relation to seasonal lipid cycles in arctic fox

...

Awarded: NOK 1.7 mill.

Project Period: 2003-2006

Location: Troms - Romsa - Tromssa

MILJØ2015-Norsk miljøforskning mot 2015

LAND: Ecosystem Finnmark: Determinants of changes in structure and function of an Alpine/low Arctic tundra ecosystem

...

Awarded: NOK 10.0 mill.

Project Period: 2003-2009

Location: Troms - Romsa - Tromssa

MILJØ2015-Norsk miljøforskning mot 2015

VANN: Use of male salmon parr as broodstock to study their significance for production and population structure

...

Awarded: NOK 1.3 mill.

Project Period: 2004-2009

Location: Vestland

FOLKEHELSE-Folkehelse

The influence of the Physical and the Social Environment on Morbidity - A population based multilevel study in Oslo, Norway

...

Awarded: NOK 1.8 mill.

Project Period: 2004-2007

Location: Oslo

BIOFYS-Fysiologiske og anatomiske fag

Computational and experimental analysis of ionic mechanisms underlying hippocampal theta resonance

...

Awarded: NOK 1.7 mill.

Project Period: 2004-2006

Location: Oslo

FRIMUF-Miljø- og utviklingsforskning

Spatial spread of invasive plants: linking demography, dispersal and spatial variation in niche opportunities.

...

Awarded: NOK 1.7 mill.

Project Period: 2004-2006

Location: Oslo

PES-EUR-Prosjektetablererstøtte Eureka

Prosjektetableringsstøtte for Embedded Decision and Data Fusion for Medical Intervention Support

...

Awarded: NOK 0.10 mill.

Project Period: 2007-2008

Location: Oslo

FORNY-3-Kommersialisering av FoUresultater

New drugs for treatment of disorders associated with insulin resistance, such as type 2 diabetes and obesity

...

Awarded: NOK 2.4 mill.

Project Period: 2007-2009

Location: Oslo

FORNY-3-Kommersialisering av FoUresultater

Tumor Target Therapy with Immunotoxin and Cyclosporin A - A phase I study in patients with advanced carcinoma

...

Awarded: NOK 1.8 mill.

Project Period: 2007-2008

Location: Oslo

S-AFRIKA-Program for forskningsamarbeid med Sør- Afrika

Capacity building in evidence-based dentistry and clinical practice guidelines, for a developing country.

...

Awarded: NOK 17,009

Project Period: 2004-2006

Location: Oslo

UTDANN-Utdanning og læring

Learning Environment and Cultural Encounters in School. A Study of Parental Involvement in Lower Secondary School

...

Awarded: NOK 7.3 mill.

Project Period: 2003-2007

Location: Troms - Romsa - Tromssa

FRIBIO-Biologi og biomedisin

Gene regulation in the immune system: The TdT and pIgR genes as models to study the role of chromatin in transcriptional regulation.

...

Awarded: NOK 1.5 mill.

Project Period: 2003-2010

Location: Oslo

F-MAT-Naturvitenskap, matematikk

Mathematics and society in Scandinavia around 1900: The creation of research traditions on the European periphery

...

Awarded: NOK 1.1 mill.

Project Period: 2004-2007

Location: Agder

PES-INST-Prosjektetablererstøtte EU (FoU)

OPERATIONALISATION OF NATURAL CAPITAL AND ECOSYSTEM SERVICES: FROM CONCEPTS TO REAL-WORLD APPLICATIONS

...

Awarded: NOK 99,999

Project Period: 2011-2012

Location: Innlandet

PES-EU-Prosjektetablererstøtte EU (bedrift)

Knowledge in Networked Organizations World-wide for Small and Medium-sized Enterprises

...

Awarded: NOK 0.10 mill.

Project Period: 2011-2012

Location: Akershus

POLRES-Polarforskning POLRES

Relationships between fracture patterns and lithologies of the De Geerdalen formation, Svalbard.

...

Awarded: NOK 37,398

Project Period: 2012-2013

Location: Svalbard

NOS-HS-Sekr. nord. sam.nemd. HumSam

NORDCORP. Youth trajectories: a longitudinal study of risk factors for marginalisation in Finland Sweden and Norway

...

Awarded: NOK 2.1 mill.

Project Period: 2009-2013

Location: Vestland