0 projects

IS-RUST-EONR-statsvitenskap

The Role of Temporary Agents in European Political Order

...Political Order via two studies of the decision-making processes of SNEs in the Commission and...institution, affect temporary officials' decision-making. A comparative approach creates variation...current crisis. While data on Commission SNEs have been collected during my dissertation, the...

Awarded: NOK 45,000

Project Period: 2014-2014

Location: Ukjent Fylke

IS-RUOK-EONR-økonomi

Ownership type, performance and the context: the study of institutional and industrial owners

...how ownership type influences the performance of the organization. The pr evious...arguing that the effect of ownership type on performance is likely to be contingent on industry...advanced statistical analysis, including IV endogeneity tests, will be performed in collaboration...

Awarded: NOK 61,000

Project Period: 2014-2014

Location: Ukjent Fylke

DIV-INT-Annet internasjonalt samarbeid

10th International Symposium on Ecohydraulics

...on Ecohydraulics (ISE) is an important venue for discussions of research and management on...applications of hydraulics, hydrology and ecology. The 10th ISE will be held in...number of short courses arranged the weekend before the symposium starts. The conference topics...

Awarded: NOK 0.20 mill.

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

FRIBIO-Biologi og biomedisin

Astrocytes - guardians of neuroprotection

...cortex but the focus on these cell types have been far neglected. In the later years it has...(BBB). In a very recent unpublished study, we have shown that the lactate transporter,...from the brain. This is not only important for normal brain function but perhaps even more so...

Awarded: NOK 2.2 mill.

Project Period: 2007-2010

Location: Oslo

INT-BILAT-BILAT-ordningen

NA - Citizenship and Local Development in the North

...project aims at re-establishing and expanding the close links that...Norwegian social scientists operating in a multi-disciplinary mode, but with a clear focus on...but new identities and indigenous people?s self-assertion also play a role. In the recent Arctic...

Awarded: NOK 0.15 mill.

Project Period: 2006-2007

Location: Troms - Romsa - Tromssa

HAVBRUKS-Havbruk - en næring i vekst

Proliferative gill inflammation in Atlantic salmon – identification of aetiology

...in later years. It is estimated that as many as 150 Norwegian sea-farms were affected in...with mortality levels as high as 40%. The aetiology of PGI is apparently multifactorial and...inclusions (epitheliocysts) containing chlamydia-like organisms (CLO) are frequently seen...

Awarded: NOK 4.5 mill.

Project Period: 2005-2011

Location: Akershus

IS-BILAT-Mobilitet Norge-USA /Canada

National Identity in Contemporary Norway: The cultural politics of immigration and integration

...a doctoral candidate in the Social Anthropology Ph.D. program of Harvard University, I am...a Leiv Eiriksson Mobility Grant to support a 10-month research stay in Norway beginning in...researcher with the strategic research program, Cultural Complexity in the New Norway...

Awarded: NOK 0.11 mill.

Project Period: 2006-2007

Location: Oslo

IS-BILAT-Mobilitet Norge-USA /Canada

Investigation of oxy-fuel flame structure by laser diagnostics

...The focus of this project is to study oxy-fuel flames whose reactants are methane and...and highlight the influence of turbulence-chemistry interactions at various levels of...at different locations within the turbulent, non-premixed, axisymmetrical flame are to study....

Awarded: NOK 79,000

Project Period: 2010-2011

Location: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offshore operasjoner 2

Fast Air Supported Carbon Composite Offshore Support Vessel

...variant of the Air Support Vessel (ASV) technology developed by Effect Ships International AS...the hull/water resistance. Adding ASV technology will give the vessel a new dimension in terms...A typically fast OSV operates in the 20-40 knots speed range. Assessments available on...

Awarded: NOK 2.3 mill.

Project Period: 2014-2016

Location: Oslo

IS-AUR-Samarb.progr. mellom Norge og Frankrike

Fidelity of a youth football coach education program in France and Norway.

...were implemented as they were supposed to have been) of an intervention aimed at enhancing...training. The other two studies utilize the RE-AIM framework (a set of criteria for designing...the impact of theoretically grounded health behaviour interventions) to determine t he reach,...

Awarded: NOK 48,694

Project Period: 2013-2013

Location: Vestland

SSF-Svalbard Science Forum

Geochronology, geochemistry, and geometry of igneous intrusions at Wallenbergfjellet, Svalbard

...Igneous Provinces are widespread in the geological record and consist of significant igneous...Nordic countries and the research laboratories available at the partner universities; the...PhD project, as it will add much needed geological data from a previously unstudied area of...

Awarded: NOK 0.10 mill.

Project Period: 2022-2023

Location: Svalbard