INCA – Increased Capacity in New and Existing Power Grids The INCA project aims to develop software and new technology to increase utilization of existing cable networks and increase transmission capacity by 20 to 70%. By modeling time-varying current , available capacity in the grid will be identified and made available. This will provide more flexibility to operate the grid efficiently INCA will develop and integrate REN's software for calculating transmission capacity, Grøft Design®, with real-time monitoring of cable installations from SafeBase. This enables utility companies to utilize the true transmission capacity of the cable network. Today, capacity calculations are performed using table lookups in national standards, software based on established IEC standards, or general-purpose simulation software based on numerical methods. The first two offer limited flexibility, while the last requires expert competence, is computationally intensive, and is specific to each individual cable installation. SINTEF Energi will research strategies and methods to make such numerical models both flexible and computationally efficient so they can be used in Grøft Design®. To verify the electrothermal models, SINTEF Energi will conduct scaled laboratory experiments and compare models with data collected from cables in service. Better utilization of existing cable networks will provide significant socio-economic and environmental benefits: - By reducing the use of resource-intensive raw materials like aluminum and copper - Reducing land degradation by offsetting development of new infrastructure - Increasing capacity for connecting renewable power generation, especially wind and solar - Making more transmission capacity available to customers faster than through new grid investments - Increasing the capacity of charging infrastructure, leading to lower CO2 emissions from industry and transport INCA will run over three years and has a budget of 32 million NOK.

Norge trenger økt overføringskapasitet i kraftnettet for å støtte grønn industri og fornybar energiproduksjon. Kabler, som utgjør 55% av kraftnettet, driftes i dag med statiske grenser for overføringskapasitet. Siden lasten varierer gjennom døgnet og årstidene og svært sjelden når den statiske grensen, utnyttes ikke den sanne overføringskapasiteten til kraftkabler. Prosjektet INCA skal utvikle programvare og ny teknologi for å utnytte eksisterende kabelnett bedre og øke overføringskapasiteten med 20 til 70 %. Ved å modellere tidsvarierende, dynamisk last vil ledig kapasitet i nettet bli identifisert og tilgjengeliggjort. Dette vil gi mer fleksibilitet til å drifte nettet på en effektiv måte. INCA skal utvikle og integrere RENs programvare for beregning av overføringskapasitet, Grøft Design, med sanntidsovervåking av kabelinstallasjoner fra SafeBase. Dette vil gjøre det mulig for nett- og kraftselskaper å utnytte eksisterende og nye kabelinstallasjoner helt opp til den sanne overføringskapasiteten uten vesentlig økt risiko. Potensialet for kapasitetsøkning er stort, og det finnes ingen løsninger på markedet for dette i dag. Løsningen, med stort internasjonalt nedslagsfelt, skal utvikles av REN, SafeBase og SINTEF Energi i samarbeid med Arva, BKK, Glitre, Mellom, Tensio og Statkraft.

Funding scheme:

ENERGIX-Stort program energi