0 antall prosjekter

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

International Research Training group NUPUS Non-linearities and Upscaling in Porous Media Flow

-

Tildelt: kr 0,85 mill.

Prosjektperiode: 2012-2016

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Novel membrane contactor using ionic liquids for pre-combustion CO2 capture

The project entitled MCIL-CO2 - Novel membrane contactor using ionic liquids (ILs) for pre-combustion CO2 capture, aims to develop an environmentally friendly and energy efficient new solution for CO2 capture from pre-combustion power plant emission. In a pre-combustion process, CO2/H2 separation...

Tildelt: kr 8,9 mill.

Prosjektperiode: 2012-2017

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Innleid konsulent: Sintef Energi AS v/Øyvind Langørgen (saksnr:12/9416)

...

Tildelt: kr 0,51 mill.

Prosjektperiode: 2012-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Application for support to strategic work related to the establishment of an EERA Joint Program on Carbon Capture and Storage (CCS)

The key objective of the European Energy Research Alliance (EERA) is to accelerate the development of new energy technologies by conceiving and implementing Joint Research Programs in support of the SET-plan. EERA has officially launched a Joint Program o n Carbon Capture and Storage (CCS-JP) at ...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Innovation in high-temperature CO2-capture Development of novel solid sorbents

-

Tildelt: kr 4,4 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Impact of fault rock properties on CO2 storage in sandstone reservoirs

An optimal reservoir for CO2 storage should ideally have high porosity and permeability and exhibit predictable communicational properties. Within sandstone reservoirs, faults and deformation bands may act as barriers and baffles, thus introducing compart mentalization and areas of flow retardati...

Tildelt: kr 8,0 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Monitoring Geological CO2 Storage: Quantitative CO2 Prediction with Uncertainty from Physical Modeling and Multiple Time-Lapse Data Types

-

Tildelt: kr 7,7 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

CO2/H2OPLUS: Understanding of hydrate formation, water deposition and water drop-out in CO2-streams - accurate dewatering specifications

Capture processes in most cases provide CO2, where apart from mutual solubility; water is present as a separate phase. In order to avoid water drop out during the transport of CO2 inside the pipeline, a transport specification for the maximum allowable wa ter contents is set. Normally a drying pr...

Tildelt: kr 2,4 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Søknad om økonomisk støtte til Bellonas arbeid i Zero Emission Fossil Fuelled Power Plants (ZEP)

Bellona har jobbet aktivt med å akselerere implementering av CCS i EU over de siste åtte år. Gjennom deltakelse og lederskap i EUs teknologiplattform for CCS (ZEP - The European Technology Platform on Zero Emission Fossil Fuel Power Plants) har vi utført et omfattende arbeid med å utvikle innspi...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Zero Emission Gas Power Technology Qualification for Industrial Scale ZEG Plants

This project focuses on technology development high efficiency co-production of electricity and hydrogen by the Zero Emission Gas (ZEG) process. Previous projects have identified the ZEG as an especially promising method for producing hydrogen and electri city from natural gas with CO2 capture (C...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Dual phase membranes for CO2 separation in power generation

To-fase-membraner bestående av smeltede karbonater i en matrise av faste porøse oksider er fremstilt og undersøkt ved elektrokjemiske metoder og fluksstudier. Den totale ledningsevnen av smeltefasen i en inert keramisk matrise ble målt og de partielle ledningsevnebidragene bestemt fra elektromoto...

Tildelt: kr 10,0 mill.

Prosjektperiode: 2011-2015

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

China: Study of CO2 storage in gas hydrates in oceanic sediments

Gas hydrates, also known as clathrate hydrates, are solid crystalline of hydrogen-bonding water network encapsulating gas molecules which usually are hydrophobic natural gas, especially CH4 and CO2 within cages created by the water lattice. The big challe nge is to understand the possibility to e...

Tildelt: kr 72 780

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Application for support to participate in IEAGHG international networks

To extend our scientific contacts we are planning to participate in IEAGHG's international network building arenas for consulting and discussion of models, experimental setup, methods and solutions. IEAGHG is a highly appropriate arena for us. One of the organisation's main activities is "to hel...

Tildelt: kr 0,30 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Støtte til strategisk arbeid inn mot EU og IEA

Within the available time frame and the monetary constraints of this project the objective will be met by active participation in strategic actions and working groups relating to CO2 management (CCS) as summarised in three specific directions: 1.The EU Te chnology Platform (ZEP and related platfo...

Tildelt: kr 1,8 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Simulation of CO2 behaviour in flow and depressurization

Treatment of CO2 in the oil & gas and process industry has become more focused over the last years. This concerns processing, transportation and storage. There is a safety aspect related to this that is not sufficiently covered by available technology and knowledge, i.e. the formation of solid C...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

China: Joint Research Centre (JRC) in Sustainable Energy' between Shanghai Jiao Tong University (SJTU) and NTNU

The JRC Agreement is a result of a long term development which started in 2004. The close cooperation we have enjoyed with Innovation Norway and the Research Council of Norway (supported by BILAT projects) culminated with this JRC Agreement signed during NTNUs Rector Delegation to China on May 2...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2010-2012

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

China: Joint Research Centre (JRC) on Renewable and New Energy' between Tsinghua University (THU) and NTNU

The JRC Agreement is a result of a long term development which started in 2004. The close cooperation we have enjoyed with Innovation Norway and the Research Council of Norway (supported by BILAT projects) culminated with this Draft JRC Agreement settled during NTNUs Rector Delegation to China 2...

Tildelt: kr 0,34 mill.

Prosjektperiode: 2010-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

China: Sino-Norwegian network on applied research on CO2 storage

The project shall establish a bi-national network of expertise in the storage aspects of the CCS chain. Within the scope of the project, the network aims to identify gaps that delay an industrial implementation of CO2 storage in China and Norway. Possible R&D actions to close these gaps shall be...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2010-2011

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

China: Sino-Norwegian network of excellence on applied research on CO2 capture techiques and concepts

Two thematic workshops shall be organised; One in Hangzhou, China, in the outset, and one in Trondheim, Norway. The aim is to facilitate communication and breaking ideas. The latter workshop will be planned adjacent to an international conference on CCS - notably the TCCS-6 in Trondheim (by mid ...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2010-2012

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Development and Analysis of Vertically Averaged Models in Porous Media

It is an acknowledged fact that simulation technology has to play an important role in providing capacity estimates, analyzing long term safety, and risk factors related to geological storage of CO2. However, the premise of this project is that current te chnologies used to model the dynamics of ...

Tildelt: kr 3,9 mill.

Prosjektperiode: 2010-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Permanent CO2 storage by in situ injection in ultramafic rocks

In situ mineralogisk lagring av CO2 representerer en mulig løsning for sikker, permanent og trygg lagring a CO2. I mineralogisk lagring danner CO2 stabile mineraler når det reagerer med silikat-mineraler, slik som basalter eller ultramafiske bergarter. Slike silikat-bergarter er tilgjengelig i st...

Tildelt: kr 5,7 mill.

Prosjektperiode: 2010-2017

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

A Numerical CO2 Laboratory

The flow physics of CO2 storage is very challenging and contemporary numerical tools cannot provide answers to many important questions. A collaborative research effort that provides transparent and verifiable solutions and that are not proprietary to any specific company is needed. The projec...

Tildelt: kr 5,4 mill.

Prosjektperiode: 2010-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Amine Emissions during Carbon Capture Phase II: Experimental Study Investigating Risks of select Amines (ExSIRA) Part C

Task 1: Modellering Det er utført implementering av gassfase kjemi i to modeller , WRF -Chem og WRF- EMEP. Deet er utført modellsimuleringer med begge modellen med de samme inngangsdata for vind- og nedbørforhold. To publikasjoner er utarbeidet, en er publisert, den andre foreligger som utkast ...

Tildelt: kr 9,2 mill.

Prosjektperiode: 2010-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

CO2 OLGA Verification and Improvement Project

Numerical simulations are essential to a safe and effective design and operation of CO2 transport pipelines. No simulator in the market today is able to provide reliable predictions for all these simulation scenarios. Besides dedicated modeling work, the development of such a simulator requires ...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2010-2013

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Geological input to Carbon storage: from outcrop to simulator

Prosjektet "GeC - Geological input to Carbon storage: from outcrop to simulator" har fokusert på hvordan CO2 oppfører seg i undergrunnen. Vi har benyttet informasjon fra Longyearbyen CO2 lab som det viktigste datagrunnlaget. Geologiske variabler som sedimentær heterogenitet, sprekker og forkastni...

Tildelt: kr 8,7 mill.

Prosjektperiode: 2010-2016

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Environmental Decision Support for Innovative EcoDesign for CCS

-

Tildelt: kr 6,8 mill.

Prosjektperiode: 2010-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

CO2 capture from industrial point sources and further development of amine reclaimer waste handling by incineration and biological treatment

Prosjektet har fire arbeidspakker som tar for seg ulike aspekter ved fangst av CO2 fra ulike typer store punktkilder, både fra gass- og kullfyrte kraftverk, og fra prosessindustrien. Problemstillingene i kraftbransjen og i prosessindustrien er forskjellig e, for eksempel har røykgass fra ulike in...

Tildelt: kr 11,4 mill.

Prosjektperiode: 2010-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

In-situ hydrocarbon reforming to hydrogen

Hydrogen has a great potential as an environmentally clean energy fuel. The limitations for wide use of hydrogen energy are related to hydrogen storage and transportation issues. Currently the processing of hydrocarbons for the production of hydrogen is a staged process including extraction, tra...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2010-2011

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Safety and Environmental Consequences of Unintended Releases from Offshore CO2 Pipelines

En samling av Matlab rutiner for Span-Wagner termodynamikken er kodet opp. Dette biblioteket av rutiner er essensiell for forenklede bulk modeller og vil bli brukt i fremtidige prosjekter, inkludert master og PhD. Bobbleplume modellen ved Herriot-Watt Univrsity er videreutviklet SECURE har de...

Tildelt: kr 12,3 mill.

Prosjektperiode: 2010-2014

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Carbon Capture in Molten Salts

In this project we show how molten inorganic halide salt based mixtures containing CaO may be utilized for selective capture and subsequent controlled release of carbon dioxide from diluted flue gases. Highly efficient absorption is demonstrated in fluori de based liquids, absorbing close to 100%...

Tildelt: kr 4,4 mill.

Prosjektperiode: 2010-2013

Sted: Ukjent Fylke