0 antall prosjekter

MSCA-Marie Sklodowska-Curie Actions (MSCA)

DSTrain - Data Science Postdoctoral Training Programme

DSTrain - Data Science Postdoctoral Training Programme

Tildelt: kr 52,1 mill.

Prosjektperiode: 2024-2028

Sted: Buskerud og 12 andre

CL5-Climate, Energy and Mobility

iTEC SkyNex ATC platform

iTEC SkyNex ATC platform

Tildelt: kr 0,37 mill.

Prosjektperiode: 2023-2026

Sted: Akershus

H20-TPT-Smart, green and integrated transport

DemonsTrating lower pollUting soLutions for sustaInable airPorts acrosS Europe

DemonsTrating lower pollUting soLutions for sustaInable airPorts acrosS Europe

Tildelt: kr 32,4 mill.

Prosjektperiode: 2022-2025

Sted: Akershus og 2 andre

H20-TPT-Smart, green and integrated transport

INTEGRATED TMA, AIRPORT AND RUNWAY OPERATIONS

The future of aviation will have to be focused more and more around an environmentally sustainable improvement of aviation. This proposal constitutes the SESAR2020 Consortium Members’ combined response to the SESAR-W3-2020 Solutions found under the Industrial Research and Validation activities (...

Tildelt: Skjult

Prosjektperiode: 2021-2022

Sted: Akershus

H20-TPT-Smart, green and integrated transport

All Weather Autonomous Real logistics operations and Demonstrations

All Weather Autonomous Real logistics operations and Demonstrations

Tildelt: kr 13,8 mill.

Prosjektperiode: 2021-2023

Sted: Buskerud og 3 andre

H20-TPT-Smart, green and integrated transport

Safely Optimized Runway Throughput

The expected rapid growth in air traffic will lead to an increasing number of capacity constrained airports. Therefore airports have to improve significantly the runway and airport throughput while maintaining or increasing runway safety levels. In SESAR 2020 WAVE-1 this was mainly addressed by P...

Tildelt: kr 7,9 mill.

Prosjektperiode: 2020-2022

Sted: Trøndelag - Trööndelage og 2 andre

H20-TPT-Smart, green and integrated transport

SESAR2020 PJ07-W2 OAUO Optimised Airspace Users Operations

SESAR2020 PJ07-W2 OAUO Optimised Airspace Users Operations

Tildelt: Skjult

Prosjektperiode: 2019-2022

Sted: Akershus

H20-TPT-Smart, green and integrated transport

Airport airside and runway throughput

Airport airside and runway throughput

Tildelt: kr 2,3 mill.

Prosjektperiode: 2019-2022

Sted: Trøndelag - Trööndelage og 3 andre

H20-TPT-Smart, green and integrated transport

PJ05-W2 Digital Technologies for Tower

PJ.05-W2 Digital technologies for Tower - SESAR-IR-VLD-WAVE2-05-2019 deals with two Solutions: Solution 35: "Multiple Remote Tower and Remote Tower centre" and with solution 97: "HMI Interaction modes for Airport Tower". 14 SESAR members (in sum 31 legal beneficiaries) showed interest in these so...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2019-2022

Sted: Akershus og 3 andre

H20-TPT-Smart, green and integrated transport

PJ04 W2 Total Airport Management

PJ04 W2 Total Airport Management

Tildelt: kr 5,6 mill.

Prosjektperiode: 2019-2022

Sted: Akershus og 2 andre

H20-TPT-Smart, green and integrated transport

PJ.20 W2 Master Planning

PJ20 W2 “Master Planning” project is the continuation of the SESAR2020 Wave 1 PJ20 ATM Master Plan Maintenance project (AMPLE). Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the long-term roadmap to guide and connect ATM Research and Innovation and...

Tildelt: kr 0,51 mill.

Prosjektperiode: 2019-2022

Sted: Trøndelag - Trööndelage og 2 andre

H20-TPT-Smart, green and integrated transport

PJ01 Wave 2 Enhanced Arrivals and Departures

PJ01 Wave 2 Enhanced Arrivals and Departures

Tildelt: Skjult

Prosjektperiode: 2019-2022

Sted: Akershus

H20-TPT-Smart, green and integrated transport

Cross Border SESAR Trials for Enhanced Arrival Management

There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft o...

Tildelt: Skjult

Prosjektperiode: 2017-2019

Sted: Akershus

H20-TPT-Smart, green and integrated transport

Increased Runway and Airport Throughput

Increased Runway and Airport Throughput

Tildelt: kr 4,5 mill.

Prosjektperiode: 2016-2020

Sted: Akershus og 3 andre

H20-TPT-Smart, green and integrated transport

Integrated Surface Management

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future Europ...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2016-2019

Sted: Trøndelag - Trööndelage og 3 andre

H20-TPT-Smart, green and integrated transport

Total Airport Management

Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the...

Tildelt: kr 3,8 mill.

Prosjektperiode: 2016-2019

Sted: Trøndelag - Trööndelage og 2 andre

H20-TPT-Smart, green and integrated transport

Master Plan Maintenance

Master Plan Maintenance

Tildelt: Skjult

Prosjektperiode: 2016-2019

Sted: Akershus

H20-TPT-Smart, green and integrated transport

PJ24 VLD Network Collaborative Management

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performa...

Tildelt: Skjult

Prosjektperiode: 2016-2019

Sted: Akershus

H20-TPT-Smart, green and integrated transport

Advanced DCB

Advanced DCB

Tildelt: kr 3,5 mill.

Prosjektperiode: 2016-2019

Sted: Trøndelag - Trööndelage og 2 andre

H20-TPT-Smart, green and integrated transport

Airport Safety Nets

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport...

Tildelt: Skjult

Prosjektperiode: 2016-2019

Sted: Akershus og 2 andre

H20-TPT-Smart, green and integrated transport

Remote Tower for Multiple Airports

Remote Tower for Multiple Airports

Tildelt: kr 2,9 mill.

Prosjektperiode: 2016-2019

Sted: Trøndelag - Trööndelage og 3 andre