0 antall prosjekter

BIA-Brukerstyrt innovasjonsarena

Development of new sustainable solutions for flexible packaging based on secondary stretching of blown polyolefin film with MDO technology

One of the drivers for innovation in the packaging industry has always been the search for cost efficient solutions that balance the best achievable performance with the best cost position. In recent years environmental concerns have also become of major importance, as awareness has increased th...

Tildelt: kr 5,9 mill.

Prosjektperiode: 2009-2012

Sted: Ukjent Fylke

MAROFF-Maritim virksomhet og offshore operasjoner

International Symposium on Marine Propulsors SMP09

Symposiet er det første i noe vi ønsker skal bli en serie av symposier med marine propellere og tilgrensende fagområder som tema. Eksempel på "tilgrensende fagområder" er fornybar havenergi der propell-liknende utstyr inngår. Symposiet holdes på Royal Gar den hotel i Trondheim 22-24 juni 2009. De...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2009-2009

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Development of methods and guidelines for safe design of moonpools

Based on earlier experiences with various moonpool designs on offshore operation vessels, more knowledge is wanted to improve future designs for better safety and operability. Large wave responses inside moonpools can cause hazards if water reaches deck l evel. Operability of a vessel is often li...

Tildelt: kr 7,0 mill.

Prosjektperiode: 2009-2011

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Design-stage Energy Optimisation / Air-Emission Reduction of Ships (DEO/AEROS)

Issues concerning emission reduction of particular relevance in the design stage may be summarised in four key factors, none of which may be neglected during the different design stages, but where DEO will focus on items 1 and 2: 1.Increasing the logistic s chain efficiency (kWh /work) 2.Increasi...

Tildelt: kr 4,8 mill.

Prosjektperiode: 2009-2010

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Utvikle skipsbasert LNG lagringstank med patentsøkt fundamentering og spesialutviklet isolering som kan utnytte hele skipsrom volumet

Prosjektet skal utvikle et konsept for trykksatt lagring av LNG drivstoff for skip der målet er å få så volumeffektiv lagring av LNG som mulig. Forskjellen mellom skipsvolumet som kreves for LNG i forhold til skipsvolumet som kreves for diesel skal gjøres så liten som mulig. For å oppnå dette sk...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2009-2011

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

Utvikling og evaluering av ulike barrieresystem for statiske og dynamiske sjøkabler

Tradisjonelt benyttes det blant annet en (relativt tykk) metallisk ytterkappe i høyspente sjøkabler, oftest av bly, for å hindre at fuktighet trenger inn i det elektriske isolasjonssystemet. Fuktighet kan redusere den elektriske levetiden betydelig for bå de masseimpregnerte og polymere isolasjon...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2009-2012

Sted: Ukjent Fylke

FORNY-3-Kommersialisering av FoUresultater

Verification of RF-choke free switching power amplifier circuit

...

Tildelt: kr 1,0 mill.

Prosjektperiode: 2009-2009

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Documented Emissions Reductions from Ships

WP1 Emission reduction measures: - in service performance: The revised Annex VI was adopted by IMO at MEPC 58 (10 October 2008). The revised annex introduces new NOx limits for new and existing ships. This work package is about evaluating solutions for N Ox reductions. WP2 Environmental report...

Tildelt: kr 5,4 mill.

Prosjektperiode: 2009-2011

Sted: Ukjent Fylke

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning Stiftelsen SINTEF (Tekn.-ind.)

...

Tildelt: kr 2,2 mrd.

Prosjektperiode: 2009-2022

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Competence project for Reduced Energy use through Advanced Technology InnoVations

-

Tildelt: kr 32,0 mill.

Prosjektperiode: 2009-2015

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Bruk av UAS (Unmanned Aircraft System) til overvåking og datainnsamling i nordområdene.

Prosjektet bygger på FOB prosjektet (NFR 180175/I40). Det vil utgjøre den norske delen av Eurekaprosjektet E!3967 MARIDRONE. der Simicon samarbeider med svenske CybAero AB. Prosjektet samler norske sluttbrukere, industribedrifter og FOU institutter i et felles drone / UAS (Unmanned Aircraft Sy...

Tildelt: kr 11,4 mill.

Prosjektperiode: 2009-2011

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Propulsion in seaways

Current practice for design of propulsion systems is based mainly on analysis of calm water performance. The effects of seaways & motions of the ships & floating offshore structures are supposed to be taken into account by using high safety factors. Howev er the problems are not necessarily solve...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2009-2012

Sted: Ukjent Fylke

ENERGIX-Stort program energi

'High Frequency Wind Power'.

Prosjektet omhandler løsninger for vindparker basert på likespenning. Ny omformerteknologi og transformering med høy frekvens gir systemer med lavere vekt og volum. Nøkkelteknologi er bruk av nanokrystallinske materialer i transformatorkjerner samt matriseomformere. Prosjektet omhandler særlig hv...

Tildelt: kr 7,4 mill.

Prosjektperiode: 2009-2014

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

New fuel and catch efficient active fishing gear concepts based on trawl and seine (Finansieringsbidrag fra FHF prosjekt 201988)

Marine vessels, incl. fishing vessels, are substantial contributors to total NOx emissions in all major maritime nations. In addition, the recent dramatic increase in fuel costs has put large parts of the international fishing fleet in an acute situation. Increased flexibility wrt. fishing gear ...

Tildelt: kr 12,0 mill.

Prosjektperiode: 2009-2013

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Air Insulated Switchgear Technology

-

Tildelt: kr 11,0 mill.

Prosjektperiode: 2009-2014

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

A local cluster going international: balancing local and non-local networking?

The KMB project aims to investigate how location in a cluster influences the internationalisation of firms, and analyse how increased internationalisation affect local cluster dynamics and cluster competitiveness.The project will develop novel insight to the research on clusters since limited res...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2009-2012

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Construction and intervention vessels for Arctic oil and gas operations

The expected increased oil and gas activities in cold climate regions will require dedicated designs for future Arctic offshore vessels. Specification, design and development of dedicated vessels should be of major interest for oil and gas companies posit ioning themselves for safe and cost effic...

Tildelt: kr 6,9 mill.

Prosjektperiode: 2008-2011

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Maritime Safety Management in the High North

The High North represents new environmental conditions setting new safety design requirements where statistics and experience are limited, and where known solutions accordingly can not be applied without thorough evaluations and research activities. In th is complex environment R&D programs need ...

Tildelt: kr 9,2 mill.

Prosjektperiode: 2008-2011

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Metoder for design av akterskip,propulsjon og styresystemer for offshorefartøy.

Utvikling og operasjon av større offshore fartøy setter større krav til dokumentasjon av både skrog og propulsjonssystemer mht effektivitet, sikkerhet og pålitelighet. Per i dag mangler både kunnskaper og metodikk for å kunne foreta optimale valg av løsni nger. Modellforsøk har store begrensninge...

Tildelt: kr 9,0 mill.

Prosjektperiode: 2008-2010

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Reducing Impact from Shipping on the Environment

The project will encompass three activities Ship emission indicator Today's serious concern is on global climate and local air pollution in densely populated areas. This proposal will concentrate on ship emissions to the air. Special focus is on following items: - Decision on emission components...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2008-2010

Sted: Ukjent Fylke

BIA-Brukerstyrt innovasjonsarena

Textiles and clothing for improved safety, performance, and comfort in the High North

The harsh environment in the High North is a threat to work performance, comfort and health. Reduced work performance and comfort represents an increased risk of human errors that may have fatal environmental and health impacts. Today, the latest developm ent in nanotechnology, information techno...

Tildelt: kr 14,0 mill.

Prosjektperiode: 2008-2012

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Study of the Effects of NOx Emissions Reductions from Ships on Fuel Consumption and other Emissions with Emphasis Particulates

Survey of Literature and other existing knowledge The literature study concentrates on particle formation from internal combustion engines especially after the combustion process. Emphasis will be put on how NOx and their reduction measures influence part icle formation. Investigation of growth...

Tildelt: kr 8,0 mill.

Prosjektperiode: 2008-2012

Sted: Ukjent Fylke

BIA-Brukerstyrt innovasjonsarena

Utvikling av helautomatisk linje for fjerning av tykkfiskbein i torsk og andre hvitfiskarter

Prosjektet er et forprosjekt som skal etableres et grunnlag for å starte opp et hovedprosjekt som skal utvikle og implementere ny teknologi for produksjon av beinfrie filetprodukter av hvitfisk. Teknologien skal innebære høy automasjonsgrad. Dette skal ku nne gi produkter med betydelig forbedret ...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2008-2009

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Mikroorganismers nedbryting a hydrokarboner i olje og dettes påvirkning på drift, smørefilm og sikkerhet i marine innstallasjoner

Mikroorganismer som gjær, sopp og bakterier finnes over alt. De er naturlig til stede i alle miljøer, de fleste innenfor et temperaturområde mellom -20 - +80'C. Mikrobiell vekst i hydraulikkolje ombord på marine installasjoner er erkjent som et betydelig problem innefor den maritime næringen, båd...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2008-2012

Sted: Ukjent Fylke

VRI-Virkemidler for regional innovasjon

Innovasjon i regionale verdikjeder - Forskningsaktiviteter i VRI Buskerud

Gjennom tre satningsområder vil FoU-miljøene bidra til utvikling basert på de behov og problemstillinger som fremkommer 1)for å forbedre eksisterende verdikjeder i etablerte bedriftsnettverk - teknologibedrifter 2)for å utvikle og etablere nye verdikjede r på tvers av bransjer i et gryende bedri...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2008-2010

Sted: Ukjent Fylke

VRI-Virkemidler for regional innovasjon

Innovasjon i regionale verdikjeder. VRI Buskerud 2008 - 2009

I VRI Buskerud er det definert tre satsingsområder: Industri, Reiseliv og Helse. De tre satsningsområdene med definerte delprosjektene representerer tre ulike faser i utviklingen av både nettverk og verdikjeder. Dermed har VRI Buskerud anledning til å få fram og anvende ny kunnskap om hvordan org...

Tildelt: kr 6,7 mill.

Prosjektperiode: 2008-2010

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Optifoul Project

The roughness of the surface of the hull is one of the major factors that contribute to the overall fuel consumption of the vessel. Measurements of the hydrodynamic drag of different commercially available antifouling coatings have shown that surface roug hness between different antifouling syste...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2008-2012

Sted: Ukjent Fylke

BIA-Brukerstyrt innovasjonsarena

Gjenvinning av komposittmaterial fra fritidsbåter

Det finnes per dags dato ingen system for retur av fritidsbåter i Norge. Samtidig er antall gamle kasserte båter økende, enten at de ligger på land eller i vann, og dette vil kunne skape et miljøproblem de kommende årene. Det vil på et eller annet tidspun kt enten fra myndighetene eller forbruker...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2008-2011

Sted: Ukjent Fylke

BIA-Brukerstyrt innovasjonsarena

IDEELL FABRIKK - Konsept for dynamisk produksjon av høyteknologiske produkter

Kunnskapsbasert og skreddersydd produksjon, basert på medvirkning og samarbeid, fremheves gjerne som et område der Norge har betydelig konkurransekraft og vekstpotensial. Mens tradisjonell masseproduksjon utkonkurreres av lavkostland, har Norge store muli gheter innenfor denne typen produksjon, g...

Tildelt: kr 10,5 mill.

Prosjektperiode: 2008-2011

Sted: Ukjent Fylke

BIA-Brukerstyrt innovasjonsarena

Multifunksjonelt ventil- og regulatorsystem for høytrykks hydrogenanvendelse i bil

Mange anerkjente forskningsmiljøer, blant annet IEA (The International Energy Agency), tror at hydrogen i løpet av dette hundreåret vil komme til å spille rollen som en av grunnpilarene i et bærekraftig energisystem. Hydrogen som energibærer gir store tek nologiske utfordringer i form av både pro...

Tildelt: kr 7,9 mill.

Prosjektperiode: 2008-2014

Sted: Ukjent Fylke