0 antall prosjekter

IS-RUOK-EONR-økonomi

Information, rationing, and coordination in experimental posted offer markets

A standard result in economics, which also conforms to simple intuition, is that a higher number of informed buyers in a market lead to lower prices (see Varian 1980). Recent theoretical research by Ben Lester (2011) has suggested that this conclusion no longer holds true if sellers are constrai...

Tildelt: kr 15 000

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Jornalistm INspired by Creatvie Search Innovation Action

SME´s represent 85% of all actors in the creative industry sector. They coexist with global players and often face difficulties in adopting stat of the art ICT technologies and accessing finance. Moreover, they operate on fragmented and localised target m arkets and have to bear high market cost ...

Tildelt: kr 0,17 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Bridging intelligence towards LV Grids Et initiativ inn mot Call LCE7 2014 av Demo Norge i regi av smartgridsenteret

Prosjektet skal etablere samarbeid mellom nasjonale smartgrid-sentre i Finland, Norge, Østerrike og Irland. Prosjektet skal koble sammen nasjonale aktiviteter innenfor FoU og Demo i Smartgrid-sektoren, med det formål å undersøke tilpasningsbehov og replis erbarhet av utviklede konsepter når man f...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

BIONÆR-Bionæringsprogram

KONFERANSE: Den nasjonale konferansen for trearkitektur 2014

TreFokus og medarrangørene har tatt initiativet til at det etableres en årlig nasjonal konferanse om trearkitektur. Bakgrunnen for dette er at bruken av tre på nye måter i bygg og trearkitektur er voksende i Norge samt at standarden på norsk trearkitektur har fått en internasjonal høy kvalitet. ...

Tildelt: kr 49 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

U-Test: Scalable Modeling and Testing Uncertainties of Cyber-Physical Systems

The aim of current project is to develop consortium and proposal for Horizon 2020 LEIT-ICT-1 call Cyber Physical Systems. The summary proposed project is given below: The summary of EU project is provided in the attachment.

Tildelt: kr 0,27 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Initiation of the COST Action HypothermiaNet about survival for hypothermic patients and increased therapeutic use of hypotermia.

Research on rewarming of hypothermic patients has identified 3 significant challenges that threatens their survival: 1) Rewarming shock is a low output heart failure that occurs during rewarming and is characterized by a sudden drop in cardiac output and peripheral arterial pressure. Recent res...

Tildelt: kr 38 809

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

MARINFORSK-Marine ressurser og miljø

COEXIST - Condition and energy expenditure estimates from free-ranging marine mammals

Ny utvikling og miniatyrisering av instrumenter som kan festes på sjøpattedyr for å samle inn informasjon om deres bevegelser og dykkeatferd, har revolusjonert vår kunnskap om disse viktige predatorene i marine økosystemer. Sammen med estimater av bestand størrelse, fødeinntak og diett har slike ...

Tildelt: kr 3,2 mill.

Prosjektperiode: 2014-2017

Sted: Ukjent Fylke

DIV-INT-Annet internasjonalt samarbeid

ON WHOSE TERMS? Communication, Collaboration and Power in Development Research

A common issue related to collaboration with both the South and the North is the assumptions connoted to the knowledge production of the global West, through an implicit understanding of a global Western academic superiority over the global Rest. This ye ar's NFU conference asks questions as; Ho...

Tildelt: kr 0,31 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Public Engagement and Mobilization for Energy Changes: A consumer and stakeholder approach

This project will focus on the human factor in the energy system, and out answer to this specific call is to combine two bottom-up approaches: a deliberative consumer process and a stakeholder involvement. The background of this call is to improve our und erstanding of the human factor in the ene...

Tildelt: kr 61 523

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Technology development of a low cost small scale biogas reactor and CHP technology for decentralised use based on agricultural waste

There is a pressing need for the development of low-cost, highly efficient biogas reactor technology which can be used in decentralised/rural areas for the production of renewable energy. Waste-to-energy technologies such as anaerobic digestion and subseq uent production of biogas combined with c...

Tildelt: kr 29 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Software for profiling patient specific tumors for cancer immunotherapies

While scientists have struggled for over a century to harness the power of the immune system in their fight against cancer, it is only during the last couple of decades that the field has really come of age. Immunotherapy has now begun to consolidate its position as the fourth pillar of human ca...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Glycol-based ionic liquid catalytic process for production of chemicals from carbon dioxide

Det tas det sikte på å etablere prosjekt i utlysningen H2020 - Leadership in enabling and industrial technologies, ii. Nanotechnologies, Advanced Materials, Biotechnology and Advanced Manufacturing and Processing, Call for SPIRE - Sustainable Process Indu stries, SPIRE 2 - 2014: Adaptable industr...

Tildelt: kr 59 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Efficient district heating and cooling

Avklare sammensetning av konsortium og delta i å utarbeide prosjektbeskrivelse og søknad. (se vedlagte søknadsskjema)

Tildelt: kr 0,17 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Formålet med prosjektet er å evaluere samfunnsøkonomiske effekter av implementeringen av EUs strategi Innovation Union.

This INSO 3 call deals with the understanding and analysis of the economic impacts of the EU innovation policy, with a specific focus on the 34 IU commitments. To gain this insight, the call asks both for the a) impacts as well as b) "the routes" through which this impact is taking place. The la...

Tildelt: kr 49 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Technology and Innovation for Development of Modular Equipment in Scalable Advanced Life Support Systems for Space Exploration (TIME SCALE)

The TIME SCALE project will bring regenerative life support research to the next level by building on and further develop the modular philosophy introduced in the existing Columbus laboratory infrastructure. The European Modular Cultivation System (EMCS) has been successful and operational for s...

Tildelt: kr 0,30 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

VAM-Velferd, arbeid og migrasjon

The Spring School in Behavioral Economics

The Choice Lab ved Norges Handelshøyskole organiserer i midten av mars 2014 The Spring School in Behavioral Economics i samarbeid med Rady School of Management ved UC San Diego. Målet med arrangementet er å introdusere doktorgradsstudenter til et nytt og spennende forskningsfelt som gir viktige ...

Tildelt: kr 99 999

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

IS-RURE-EONR-rettsvitenskap

A wider understanding of EU-law and its effect on EEA law + International Business Law with special focus on private equity

See motivational letter. - Study EU-law / EEA-law - Learn german as a language as well as a comparative study between the German and the Norwegian legal system. - Study International Business Law, hereunder specifically private equity

Tildelt: kr 35 000

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Closed Loop Process Control for Integrated Industrial Processes to create measuring of carbon footprint based on online measurement

Establish a Horizon 2020 project under the Call SPIRE-01-2014 - Sustainable process industries - Topic Integrated Process Control. The project will be established in cooperation with Ketek, Finland, Datarangers, Finland, North East of England Process In dustry Cluster, SIRRIS Belgium and selec...

Tildelt: kr 39 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Aluminium Components Design Loop Software

The highest level of accuracy in a finite element code is gained by using solid element technology. It is only this modelling condition that can account for multi-axial stress states and then fully take advantage of advanced material models at all scales. However, traditional solid element techn...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

IS-RUOK-EONR-økonomi

Application for Personal Mobility Grant Summer Semester 2014 at Humboldt University of Berlin

Application For E.ON Ruhrgas Scholarship (Personal Mobility Grant) I, Anders Skjærholt, has been nominated and accepted as an exchange student to Humboldt Universität zu Berlin through the ERASMUS network. I intend on further my competencies within the f ields of finance, labour economics and ap...

Tildelt: kr 35 000

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Weste reduction and Waste management in a urban metabolistic perspective. A top-Down and bottom-up approach

This project will focus on waste reduction and waste management within a urban metabolism perspective. The project will be developed in two phases, where the first stage is in October 16, 2014. Hopefully we will be invited to participate in the second rou nd, with deadline March 3, 2015 At the pr...

Tildelt: kr 39 999

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

System for plugging og sementering av gamle oljebrønner

I forbindelse med oljeutvinning er det mange oljefelt som er i ferd å bli gamle og som om få år ikke vil være økonomisk drivverdige. Når oljefeltene skal stenges ned og forlates må alle oljebrønner inn i reservoarene plugges forsvarlig. Det er et krav at alle oljebrønner som skal stenges og forl...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

DIV-INT-Annet internasjonalt samarbeid

Challenges for the Ecology Movement: An Exchange in Between Academics and Activists

The ecology movement deals with the biggest social and political threat of our time. Some of the most central challenges it faces are questions of ?green growth? and alternatives to the market, the possibilities and limitations of urbanization, the ethics of an ecological society and the link in...

Tildelt: kr 0,29 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Technology Demonstration and Verification for Removal of Sulphate and Salts: SWIT-SUL/SAL from Seawater at the Seabed

This "Forprosjekt" is to pave the way for a larger DEMO2000 project in April - described below: The ability to inject low salinity water into reservoirs has in some cases shown to significantly increase the recovery factor of the oil in place in a reservo ir. The removal of sulphate ions from inj...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

H2020-Smart Neighborhood Markets

Changes in the current retail market for electricity reflect a bottom-up paradigm and perspective change regarding electricity market concepts, placing energy consuming buildings and consumers/prosumers in the center. The project will investigate this par adigm shift and its impact on the future ...

Tildelt: kr 0,37 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

BLUE HARVEST

Subsea operations have increased in size, volume, complexity and technology so that output can be increased in previously impossible areas as reserves in deeper depths are utilized. Every subsea ?factory? on the ocean floor is custom made due to the diff erent needs and requirements at each site...

Tildelt: kr 22 499

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Activity Based Monitoring of Agronomy with Earth Observation

Det tas det sikte på å etablere prosjekt i utlysningen H2020-EARTH OBSERVATION (EO)-1-2014: New ideas for Earth-relevant space applications. Dette er den første utlysningen i Leadership in enabling and industrial technologies (LEIT) - Space. Planlagt pr osjektform er Research and innovation act...

Tildelt: kr 59 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

ENERGIX-Stort program energi

A NEW ANALYTIC APPROACH FOR THE GREEN CERTIFICATE MARKET

Det felles Svensk-Norske El-Sertifikatmarkedet trådte i kraft 1. Januar 2012. Dette markedet er Norge og Sveriges sentrale støttemekanisme for å nå de respektive fornybarmålene gitt av EU?s fornybarhetsdirektiv. Målet for markedet er at Norge og Sverige sammen skal øke produksjonen fra fornybar...

Tildelt: kr 1,1 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

TRANSPORT-Transport 2025

Unregistered Transport - Mobility, Safety and new Technologies

Det er lite kunnskap om trafikkomfang og ulykker når det gjelder fritidsaktiviteter i Norge. Hvor mye folk går, sykler, kjører båt, snøscooter osv. vet vi lite om. Grunnen er at mye av denne aktiviteten ikke trenger formell godkjenning gjennom førerkort osv. Det er dermed lite systematisk registr...

Tildelt: kr 3,7 mill.

Prosjektperiode: 2014-2017

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Dreamliner pilot well qualification for Smørbukk Sør application

Fishbones Dreamliner Hovedmålet med prosjektet er å kvalifisere Fishbones Dreamliner teknologien for bruk i Nordsjøen samt internasjonale applikasjoner. Fishbones Dreamliner prosjektet er en videreutvikling av den allerede kommersialiserte teknologien som baseres på jetting. Fishbones Dreamliner...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke