0 antall prosjekter

PES-HORISONT-EU-PES Horisont Europa

Advanced Remote Infrastructure System Evaluation

The ARISE platform will continually update and digitally record the maintenance and repair status of infrastructure assets. It will adopt an interoperable data-sharing approach, adhering to existing standards and contributing to standardization. Moreover, ARISE will bolster skills development, of...

Tildelt: kr 69 999

Prosjektperiode: 2024-2024

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

MAIRROR

The objective of the MAIRROR proposal is to develop tools to help define design and process guidelines from any level of the characterisation pyramid. Currently, there is only interactions between the adjacent levels, but our project wants to break these barriers and generate new connections than...

Tildelt: kr 69 999

Prosjektperiode: 2024-2024

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

Smart Green Machining

In the manufacturing sector in the last century and especially last decades, the emphasis was placed on productivity, efficiency and economic return to the detriment of an efficient ecological model. Today climate change and the resulting ecological awareness add a new card that must be ( played)...

Tildelt: kr 69 999

Prosjektperiode: 2023-2024

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

Model based systems engineering integration in digital twin for defence projects.

In the defence sector, the design and development of projects traditionally rely on standard Systems Engineering (SE) methodologies, which are often characterized by extensive documentation and inherent error proneness To addressing this issue this project proposes an innovative approach by intro...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2023-2024

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

XARMONY - Human Augmented Reality: Museum, educatiON & industrY. HORIZON-CL4-2023-HUMAN-01-21: Next Generation eXtended Reality (RIA)

Production lines and machines are getting more and more complex. Information is spread out over a physical and a digital world and is difficult to combine. To access that information, operators need to continuously switch context. The need of data visualization tools is identified, data should be...

Tildelt: kr 99 999

Prosjektperiode: 2023-2023

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

Hydropower Plants Operations’ Monitoring & Maintenance Recommendations through Digital Twins, empowered with eXt. Reality and eXplainable AI

Hydropower is one of the renewable energy sources that have the highest conversion efficiency , contributing approximately 16%–17% of the total world electricity generation. Operations’ Monitoring and Maintenance Recommendations (M&M) are an important aspect for their efficient working and life e...

Tildelt: kr 49 999

Prosjektperiode: 2022-2023

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

“PRELITHIATION IN AN INDUSTRIAL MANUFACTURING ECOSYSTEM” HORIZON-CL5-2022-D2-01-04

Please see attached PDF for details. Jotne focus will be in the WP4: Digital Factory. O1: Development of digital factory Identification and Development of Use-Cases for digital value-adding services, Development of detail concept for digital factory and the integration strategy and interfaces to...

Tildelt: kr 69 999

Prosjektperiode: 2022-2022

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

MATISSE - Model-based engineering of Digital Twins for early verification and validation of Industrial Systems HORIZON-KDT-JU2022-2-RIA

Thanks to the advances in information technology, modern industrial systems are becoming increasingly intelligent and autonomous; thus, their requirements for, e.g., correctness, availability, reliability, are also increasing. Monitoring, analysis and diagnosis of such industrial systems became p...

Tildelt: kr 0,17 mill.

Prosjektperiode: 2022-2022

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

Aggregated XR multiuser space for future work places

Production lines and machines are getting more and more complex. Information is spread out over a physical and a digital world and is difficult to combine. To access that information, operators need to continuously switch context. The need of data visualization tools is identified, data should be...

Tildelt: kr 49 999

Prosjektperiode: 2022-2022

Sted: Oslo

PES-HORISONT-EU-PES Horisont Europa

“Matching Assets with manufacturing Tasks for Changeable & Efficient Reconfiguration”

(SO1): Establishing product-process-production system of systems model Enabling companies to efficiently determine relations between products, processes and production systems, thereby enabling to determine impact of market and supply changes on production systems, and identifying opportunities t...

Tildelt: kr 69 999

Prosjektperiode: 2022-2022

Sted: Oslo