0 antall prosjekter

GAVEFORST-Gaveforsterkningsordningen

Kreftforskning UITØ

...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

GAVEFORST-Gaveforsterkningsordningen

Medisin, spatal orienteringsevne

...

Tildelt: kr 0,91 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

NOS-HS-Sekr. nord. sam.nemd. HumSam

NOP Nordic Studies in Education

...

Tildelt: kr 78 030

Prosjektperiode: 2011-2011

Sted: Ukjent Fylke

NOS-HS-Sekr. nord. sam.nemd. HumSam

NOP Arkiv för nordisk filologi

...

Tildelt: kr 87 560

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

EUROSTARS-EUROSTARS

E!6155 Multi purpose human finder

The main goal is to develop a device, called the HumanFinder, as an aid to rescue teams trying to locate trapped victims in urban search and rescue operations. The HumanFinder is a sensor, incorporating the Novelda Nanoscale Impulse Radar chip, capable of detecting and determine the positioning ...

Tildelt: kr 3,8 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

IS-RUOK-EONR-økonomi

see project description

see project description

Tildelt: kr 35 000

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

GAVEFORST-Gaveforsterkningsordningen

Langsiktige, grunnleggende forskning

...

Tildelt: kr 0,75 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

GAVEFORST-Gaveforsterkningsordningen

Forskning innen medisin og jus

...

Tildelt: kr 0,42 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

POLRES-Polarforskning POLRES

Kartlegging av norsk polarforskning 2011

...

Tildelt: kr 1,1 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

FORNY20-FORNY2020

MOSE: Mechanical Oil spill Sanitation Equipment

...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

FORNY20-FORNY2020

New drugs for cancer treatment restoring wild type activity of mutant proteins

...

Tildelt: kr 1,5 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Load cycling and radial flow in mass impregnated HVDC subsea cables

For transmission of large amounts of electric energy across long sea crossings so called mass impregnated HVDC subsea cables remain the state-of-the-art technology. The cooling period after a power reduction or turn-off is the most critical part of the op eration of such a cable. It turns out tha...

Tildelt: kr 3,3 mill.

Prosjektperiode: 2011-2016

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Norsk deltagelse i IEA Ocean Energy Systems (OES)

Prosjektets hovedmål er å delta i IEA OES med sikte på å bidra til at det i et globalt perspektiv legges til rette for bedre rammebetingelser for norsk forskning, utvikling og kommersiell utnyttelse av fornybar havenergi. Prosjektets delmålsetninger me d deltagelse i IEA OES er at Norge samt nor...

Tildelt: kr 0,40 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Solar Energy in Living Environments

Forskningsprosjektet "SILVER - Solar Energy in Living Environments (2011-2014)" har behandlet en rekke problemstillinger og utfordringer vedrørende bruk av solenergi til oppvarming innenfor bygningssektoren. Prosjektet er et IPN prosjekt og har blitt støttet av programområdet ENERGIX I Norges Fo...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2011-2014

Sted: Ukjent Fylke

ENERGIX-Stort program energi

IEA Energy Storage IA

Energy Conservation through Energy Storage (ECES) Implementing Agreement (IA) was established in 1978. The strategic objectives for the IA are as follows: 1.Technology: Maintain and develop international technical R&D collaborations that further the envir onmental and market objectives. 2.Environ...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

FORNY20-FORNY2020

Miniaturized multi-gas sensor

...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

PETROMAKS2-Stort program petroleum

Separation friendly produced water pump.

This project shall have main experimental focus on oil in water droplet break up in pumps, and the resulting effect on downstream oil/water separation. Next, it shall be focused on how pumps impact produced water injection chemicals, which are used to imp rove reservoir flooding operations. The p...

Tildelt: kr 4,6 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

PRO Membrane and Component Development

Dette prosjektet er en videreføring av BIP-prosjektet "Utvikling av membraner for kraftproduksjon ved trykkretardert osmose (TRO)", NFR p.nr 187483 som ble godkjent av NFR i 2007 og avsluttet i 2010. Sluttrapport ble innsendt 13.08.2010. Prosjektet har i hovedsak gått ut på å etablere et storska...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Norsk deltakelse i IEA HIA Task 19 - Hydrogen sikkerhet

The objective of the project is to contribute to the international work in IEA Hydrogen Implementing Agreement (HIA) Task 19 for safe introduction of hydrogen as an energy carrier. This was initiated in 2004 by a number of countries, among them Norway. Th e main focus is directed at improving our...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

China: Norwegian-Chinese battery network

With the increasing awareness of global warming issues, the renewable energy technologies, have received tremendous attention recently, and is identified as one of the prioritized areas for the infrastructure call. Various battery technologies are a consi dered crucial components in the future en...

Tildelt: kr 0,40 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

China: PEM durability - components and systems, Chinese-Norwegian bilateral cooperation in hydrogen technology

The main objective of this proposal is to establish a close collaboration between leading Chinese and Norwegian research institutions and industry within the field of hydrogen technology. Specifically, in this bilateral project, we aim to explore the pote ntial of bilateral research cooperation, ...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

China: SYN -A Norway-China Bilateral Research Collaboration Project

SYN -A Norway-China Bilateral Research Collaboration Project is a collaboration between the solar cell research groups at SINTEF, NTNU and Yingli State Key laboratory for photovoltaic material and technology. The aim of the project will be to identify w hich technological and scientific challen...

Tildelt: kr 0,40 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Simulation of CO2 behaviour in flow and depressurization

Treatment of CO2 in the oil & gas and process industry has become more focused over the last years. This concerns processing, transportation and storage. There is a safety aspect related to this that is not sufficiently covered by available technology and knowledge, i.e. the formation of solid C...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2011-2013

Sted: Ukjent Fylke

MAROFF-2-Maritim virksomhet og offsh-2

Maritimt potensiale i nordområdene

Ekstreme værforhold og atmosfæriske forhold, store avstander og mangel på infrastruktur stiller store krav til informasjon og tekniske løsninger som tas i bruk for å kunne drive sikkert og effektivt i nordområdene. Eksisterende systemer fungerer mindre go dt eller ikke i det hele tatt på høyere b...

Tildelt: kr 4,9 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

RENERGI-Fremtidens rene energisystemer

China: Monitoring, Optimization and Control for Green Smart Grid - MAXGREEN

The proposed project targets "Støtte til samarbeid med Kina" in the RENERGI programme for establishing a sustained collaboration in research and research oriented education between University of Oslo (Norway), Simula Research Laboratory (Norway), and Zhej iang University (China) in the area of IC...

Tildelt: kr 0,46 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

FORNY20-FORNY2020

Selective Ruthenium Olefin Metathesis Catalysts - Optimal deal extention

...

Tildelt: kr 0,42 mill.

Prosjektperiode: 2011-2012

Sted: Ukjent Fylke

NORRUSS-Nordområdene og Russland

Federal Russian Politics: Modernizing Northern Economies

Norsk: President Medvedevs (2008-12) prestisjonprosjekt var modernisering av russisk økonomi og samfunn. FEDRUP ser på modernisering av de tradisjonelle næringene i våre nordlige naboområder: fiskeri, skipsbygging og gruvedrift. Hovedfunnet er at moder nisering til en viss grad foregår, men ikke...

Tildelt: kr 4,4 mill.

Prosjektperiode: 2011-2017

Sted: Ukjent Fylke

EU-STRA-Strålevern

Epidemiological study to quantify risks for paediatric computerized tomography and to optimise doses

EPI-CT er et stort, internasjonalt samarbeidsprosjekt. Formålet med studien er å etablere en europeisk kohort av barn under 20 år som har gjennomgått en eller flere CT-undersøkelser, for i første omgang å estimere risiko for leukemi og hjernesvulst. Etter lenger oppfølging planlegges også analyse...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2011-2018

Sted: Ukjent Fylke

SIOS-PP-Svalbard Inte Artic Eart Ob Sy

Etabl.partn.6 - CNR

...

Tildelt: kr 2,9 mill.

Prosjektperiode: 2011-2015

Sted: Ukjent Fylke

SIOS-PP-Svalbard Inte Artic Eart Ob Sy

Etabl.partn.19 - UiB

...

Tildelt: kr 0,49 mill.

Prosjektperiode: 2011-2016

Sted: Ukjent Fylke