0 antall prosjekter

DIV-INT-Annet internasjonalt samarbeid

Diversitas Open Science Conference Biodiversity and society - understanding, connections, adapting to change 13-16-october 2009 Cape Town

...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2009-2009

Sted: Ukjent Fylke

RBGRUNSAMF-Resultatbasert grunnbevilgning - Samf.vitensk.institutter

Grunnbevilgning - NUPI

...

Tildelt: kr 230,0 mill.

Prosjektperiode: 2009-2022

Sted: Oslo

MILJØ2015-Norsk miljøforskning mot 2015

BiodivERsA: EcoCycles: Interacting impacts of land use and climate change on ecosystem processes: From cyclic herbivores to predators of con

...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2009-2013

Sted: Troms - Romsa - Tromssa

RENERGI-Fremtidens rene energisystemer

Fremtidens offshore vindtubiner.

...

Tildelt: kr 7,0 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

CLIMIT-Program for CO2-håndtering

Zero Emission Gas Power Long Term System and Material Test

Previous projects have identified the ZEG process as an especially promising method for producing hydrogen and electricity from natural gas with CO2 capture (CCS) in an efficient and cost-effective way. The process combines sorption enhanced (SE) reformi ng and high temperature solid oxide fuel ...

Tildelt: kr 1,5 mill.

Prosjektperiode: 2009-2011

Sted: Akershus

ENERGIX-Stort program energi

Markedsnært prosjekt - Hydrogenveien i Norge, Knutepunkt Oslo

Hydrogenbussprosjektet - HyNor Dette prosjektet har vært et demonstrasjonsprosjekt for hydrogenbusser med brenselcelle i Oslo og Akershus. Prosjektet har vært en del av EU-prosjektet CHIC (www.chic-project.eu) som testet ut 26 ikke-kommersielle busser i rutekjøring i en rekke Europeiske byer. ...

Tildelt: kr 13,8 mill.

Prosjektperiode: 2009-2017

Sted: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Norwegian-Russian collaboration on deep seismic studies of the crust and upper mantle in the Barents Sea

We will establish a closer collaboration between Norwegian and Russian scientists in relation to one of the key research tasks focusing on the crust and upper mantle structure within the ongoing PETROMAKS project 'Petroleum-related regional studies of the Barents Sea region' (PETROBAR). The main...

Tildelt: kr 0,79 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

RENERGI-Fremtidens rene energisystemer

Konseptuell analyse av FO3 punktabsorbator

FOBOX AS har i mange år arbeidet med utvikling av teknologi for bølgekraft. Under navnet FO3 er det tidligere demonstrert et konsept for energiproduksjon fra bølger basert på bruk av en flytende plattform påmontert punktabsorbatorer. Prosjektet SEEWEC med deltakere fra seks ulike europeiske land...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2009-2010

Sted: Oslo

DIV-INT-Annet internasjonalt samarbeid

Samarbeid mellom norske og nordamerikanske forskningsinstitusjoner - nettverksmidler

Videreutvikle et nettverk mellom norske og nordamerikanske forskningsmiljøer for å realisere samarbeidsprosjekter på menneskelig tilpasning til klimaeffekter: Samarbeidet vil både dra nytte av eksisterende kompetanse og prosjekter, og ha som mål å utvikle komparativ forskning mellom Nord-Amerika...

Tildelt: kr 99 999

Prosjektperiode: 2009-2010

Sted: Innlandet

PUBL-Publisering/prosjektinform

Yearbook of International Environmental Law (YBIEL)

Yearbook of International Environmental Law er den fremste internasjonale publikasjon til dokumentasjon av den miljørettslige utviklingen slik den skjer i internasjonale organisasjoner og konferanser, samt i de enkelte land. I tillegg inneholder årboka ar tikler om miljørett av de internasjonalt ...

Tildelt: kr 0,36 mill.

Prosjektperiode: 2009-2012

Sted: Oslo

DIV-INT-Annet internasjonalt samarbeid

Nordic Conference in Development Economics 2009

I 2001 ble det tatt initiativ til å opprette et uformelt nettverk (Nordic Network of Development Economics-NNDE) for å styrke og stimulere yngre forskere innen dette fagområdet. Dette la grunnlaget for at man fra 2002 arrangerte en høyt profilert årlig No rdic Conference in Development Economics ...

Tildelt: kr 0,10 mill.

Prosjektperiode: 2009-2009

Sted: Akershus

DEMO2000-Prosjektrettet teknologiutv. petroleumsvirksomhet

High Pressure Deep Water (HPDW) LiquidBooster Pump

...

Tildelt: kr 1,8 mill.

Prosjektperiode: 2009-2011

Sted: Akershus

HAVKYST-Havet og kysten

MarinEra - Marine phylogeographic structuring during climate change: the signature of leading and rear edge of range shifting populations.

...

Tildelt: kr 2,7 mill.

Prosjektperiode: 2009-2012

Sted: Vestland

SAMRISK-Samfunnssikkerhet og risiki

Understanding 'financial security' in an age of uncertain

Financial securitization was heralded by orthodox economists to reduce societal risk through novel forms and techniques of risk management. It is all the more perplexing then, how a celebrated model of risk optimization can itself pose an unexpected threa t to a few distant municipalities in the ...

Tildelt: kr 0,47 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

CLIMIT-Program for CO2-håndtering

CO2 Dynamics - Fundamental aspects of transport and injection of CO2 with impurities

This project will study some important aspects of the CO2 capture and storage process, namely the transport and injection. The captured CO2 will not be absolutely clean. The impurities present will affect the fluid properties, and must therefore be accoun ted for. To perform design and safety c...

Tildelt: kr 19,0 mill.

Prosjektperiode: 2009-2013

Sted: Trøndelag - Trööndelage

ENERGY-1.05 Energy

Nanostructured Photoelectrodes for Energy Conversion

Nanostructured Photoelectrodes for Energy Conversion

Tildelt: kr 1,8 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

SSH-1.08 Socio-economic Science and the Humanities

Impact of Networks, Globalisation, and their Interaction with EU Strategies

Impact of Networks, Globalisation, and their Interaction with EU Strategies

Tildelt: kr 1,6 mill.

Prosjektperiode: 2009-2011

Sted: Oslo

ENERGIX-Stort program energi

High Voltage AC and DC Subsea Cables for Offshore Wind Farms and Transmission Grids

Within Energi 21 (a unifying R&D strategy for the energy sector) five technology target areas are identified in order to respond to the key challenges and to the national objectives. In the strategy document for Energi 21, one of the target areas for more intensive basic research is an energy sy...

Tildelt: kr 12,8 mill.

Prosjektperiode: 2009-2013

Sted: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Optimal Short-Term Scheduling of Wind and Hydro Resources

The project aims at developing methods for short-term scheduling of combined hydro- and windpower systems, that take into account uncertainties in different components of the short-term scheduling. The scheduling problem is normally solved by deterministi c methods, assuming that these uncertaint...

Tildelt: kr 7,6 mill.

Prosjektperiode: 2009-2013

Sted: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Reduced energy consumption in buildings - impacts on indoor air quality and health

Prosjektet "Reduced energy consumption in buildings - impacts on indoor air quality and health" har produsert ny kunnskap som bidrar til å sikre at energieffektiviseringstiltak i bygninger ikke går ut over inneklima, luftkvalitet og helse. Bygninger står for 40 % av energibruken i fastlands-Norg...

Tildelt: kr 5,5 mill.

Prosjektperiode: 2009-2015

Sted: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Solid-state photoelectrochemical production of hydrogen

The project explores the viability of a novel way to use solar energy to split water, producing hydrogen. This involves the use of a semiconductor electrode on a solid-state high temperature proton conducting electrolyte so as to enable direct formation o f dry hydrogen on the cathode, utilising ...

Tildelt: kr 5,5 mill.

Prosjektperiode: 2009-2013

Sted: Oslo

ENVIRONMENT-1.06 Environment (including Climate Change)

Low Resource consumption buildings and constructions by use of LCA in design and decision making

Low Resource consumption buildings and constructions by use of LCA in design and decision making

Tildelt: kr 2,3 mill.

Prosjektperiode: 2009-2011

Sted: Sør-Trøndelag

TRANSPORT-1.07 Transport (including Aeronautics)

Power Optimised Ship for Environment with Electric Innovative Designs ON board

Power Optimised Ship for Environment with Electric Innovative Designs ON board

Tildelt: kr 1,9 mill.

Prosjektperiode: 2009-2012

Sted: Akershus

ENERGIX-Stort program energi

Utvikling av modeller for offshore vind- og turbulensforhold og beregning av laster på bunnfaste og flytende offshore vindturbiner.

Vindforholdene i det marine grenselaget nær havoverflaten, der offshore vindturbiner befinner seg, er i liten grad kartlagt i de norske havområdene. Vinddata fra landbaserte målinger vil ikke kunne karakterisere forholdene offshore og det er derfor nødven dig med offshore vindmålinger av høy kval...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2009-2013

Sted: Akershus

RENERGI-Fremtidens rene energisystemer

Oppdateringsmetodikk i operasjonelle tilsigsmodellar

Ei av dei store svakheitene med den implementasjonen av HBV modellene ein finn i modellsystemet som i dag er brukt hos majoriteten av norske vasskraft produsentar er metodikken for å oppdatere status i modellen med observerte tilstandar. Kvaliteten på ti lsigsprognoser både på kort og lang sikt ...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2009-2012

Sted: Oslo

PETROMAKS2-Stort program petroleum

Deep water repair welding and hot tapping

Steel pipelines represent today the most important infrastructure for transport of oil and gas to onshore facilities in Norway and Europe. Up to now, subsea pipeline tie-ins and repair have been carried out with the assistance of divers. The recent trend is that oil and gas are explored at deepe...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2009-2014

Sted: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Distribution of oil and bioavailability

When oil is released in an area with ice we will face a complex interaction between oil, water and ice. The oil will be absorbed by snow on the ice edges, it may be trapped in the ice in brine channels and it may be moved underneath the ice. The ice field as such will also be under constant tran...

Tildelt: kr 2,3 mill.

Prosjektperiode: 2009-2011

Sted: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

Samfunnsøkonomiske kostnader ved at sluttbrukere opplever avbrudd, spenningsforstyrrelser og rasjonering

Overordnet mål for prosjektet er å framskaffe ny kunnskap om og bedre metoder for å kartlegge kostnadene for samfunnet ved avbrudd, spenningsforstyrrelser og rasjonering, som grunnlag for regulering av leveringskvalitet. Tidligere forskning, basert på re presentative spørreundersøkelser og betin...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2009-2012

Sted: Oslo

RENERGI-Fremtidens rene energisystemer

Terminert. Very efficient solar cells made from float zone silicon

...

Tildelt: kr 0,70 mill.

Prosjektperiode: 2009-2010

Sted: Akershus

RENERGI-Fremtidens rene energisystemer

Utvikling og evaluering av ulike barrieresystem for statiske og dynamiske sjøkabler

Tradisjonelt benyttes det blant annet en (relativt tykk) metallisk ytterkappe i høyspente sjøkabler, oftest av bly, for å hindre at fuktighet trenger inn i det elektriske isolasjonssystemet. Fuktighet kan redusere den elektriske levetiden betydelig for bå de masseimpregnerte og polymere isolasjon...

Tildelt: kr 3,6 mill.

Prosjektperiode: 2009-2012

Sted: Østfold