0 antall prosjekter

PES-INST-Prosjektetablererstøtte EU (FoU)

Research Aided Intermodal Logistics Rail Integration Demo

...

Tildelt: kr 0,35 mill.

Prosjektperiode: 2008-2008

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

whole journey Mobility concept ensuring Accessibility for all

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2008-2008

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Optimal Policies for Transport in Combination

...

Tildelt: kr 99 999

Prosjektperiode: 2008-2008

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

CO2 Footprint Application for the Evaluation of Concepts for Transport Sustainability

...

Tildelt: kr 35 515

Prosjektperiode: 2008-2008

Sted: Oslo

REISEPOL-Reiselivspolitikk

Knowledge on economic impacts of tourism on regional and local levels as platform for tourism policy strategies

This project aims at meeting the call for knowledge related to economic impacts of tourism as a basis for adequate tourism policy making. The basis of our proposal is the wide experience from tourism impact assessment at the Institute of Transport Economi cs (TØI), combined with the economic mode...

Tildelt: kr 5,6 mill.

Prosjektperiode: 2008-2011

Sted: Oslo

RISIT-Transportsikkerhet

Gransking av ulykker og farlige hendelser i transport: Metodeutvikling og analyse av forutsetninger for læring.

Prosjektet består av to hoveddeler. Del 1 er en undersøkelse av metodologiske forutsetninger for at gransking av ulykker skal gi valid kunnskap om årsakssammenhenger. Det vil bli fokusert på betydningen av å bruke en strukturert og standardisert analyseme tode samt aggregering av resultater fra f...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2008-2010

Sted: Oslo

RISIT-Transportsikkerhet

Risikodiskrepans: Sikkerhet og risikopersepsjon i ulike transportformer

Prosjektet består av 3 delprosjekter (redusert fra 4 i den opprinnelige søknaden) og hvert delprosjekt omhandler og sammenligner et bredt utvalg transportformer. Prosjektet bygger på et pågående prosjekt i regi av TØI om opplevd utrygghet innen RISIT. Før ste del er en metodeutvikling knyttet til...

Tildelt: kr 3,5 mill.

Prosjektperiode: 2008-2009

Sted: Oslo

RISIT-Transportsikkerhet

Coping with the new risks: Understanding, Organization and Economics

The new risks imposed by terrorist threats challenge our normal way of dealing with risk. They both challenge the way we perceive risk, they challenge the way we organise and coordinate safety work and they challenge our normal thinking of how to choose e ffective and efficient counter measures. ...

Tildelt: kr 4,5 mill.

Prosjektperiode: 2008-2009

Sted: Oslo

NATURNAER-Natur og næring

Sustainable tourism development in mountain park areas

A) Development scenarios for the parks will mainly be specified in meetings/interviews with local stakeholder representatives. The current situation will be described and applied as Scenario I. The meetings will also help specifying a Scenario II - a rela tively 'low impact' type of increased fac...

Tildelt: kr 4,6 mill.

Prosjektperiode: 2008-2011

Sted: Oslo

NORKLIMA-Klimaendringer og konsekvenser for Norge

ACTOR: Arctic Climate Change, Tourism, and Outdoor Recreation

Northern Norway and Svalbard are experiencing rapid changes in the climate and these changes have environmental, societal, and economic consequences. Hence, climate change will most likely have considerable impact on the regions' tourists and tourism indu stry. The main objective of this project...

Tildelt: kr 12,3 mill.

Prosjektperiode: 2008-2012

Sted: Oslo

SIP-Strategiske instituttprogram

Samspill mellom transport, mobilitet og informasjons- og kommunikasjonsteknologi

Utviklingen og spredningen av informasjons- og kommunikasjonsteknologi (IKT) har endret betingelsene for vareproduksjon, tjenesteyting, arbeids- og hverdagsliv i dagens samfunn. Denne utviklingen har stor betydning for transportsektoren, både fordi spredn ingen av teknologi påvirker organisering ...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2008-2010

Sted: Oslo

SIP-Strategiske instituttprogram

Samordningens muligheter og begrensninger - utfordringer i og omkring transportsektoren

SIPets overordnede formål er at TØI bygger opp en kunnskapsbase som gjør det mulig å sette samordning på den forskningsmessige dagsorden. Gjennom det vil vi bidra til at politikk og forvaltning får et bedre kunnskapsgrunnlag for å vurdere samordningens mu ligheter og begrensninger i samferdsels-,...

Tildelt: kr 3,1 mill.

Prosjektperiode: 2008-2010

Sted: Oslo

SIP-Strategiske instituttprogram

Tid og usikkerhet

Hovedproblemstillingen i programmet er å komme fram til mer realistisk verdsetting av tidsbesparelser og økt pålitelighet i transport og tilgrensende aktiviteter. Problemet har to sider: den fysiske og den økonomiske. Vi trenger å vite mer om verdsetting av tid og pålitelighet, både for gods og...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2008-2011

Sted: Oslo

SMARTRANS-Næringslivets transp. og ITS

GUNVOR - Godstransport og usikkerhet - Valuation of transport time and reliability in freight transport

Transport time variability and information are both related to the reliability of transport. None of them are standard components of cost benefit analysis, the well-established ex ante evaluation method in the transport sector. Recognising that transport policy measures for improved reliability (...

Tildelt: kr 1,1 mill.

Prosjektperiode: 2008-2010

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

ENACT Design Appropriate Contractual Relationsships

...

Tildelt: kr 0,72 mill.

Prosjektperiode: 2007-2010

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

REorganisation of Transport networks by advanced RAil freight Concepts

...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2007-2014

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

BIOfuels STRAtegies for a Secure and Sustainable Europe

...

Tildelt: kr 49 999

Prosjektperiode: 2007-2007

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Adolescence for Renewable Energies In Transport

...

Tildelt: kr 50 127

Prosjektperiode: 2007-2007

Sted: Oslo

SMARTRANS-Næringslivets transp. og ITS

LIN - Logistics in Norway

It is indicated that Norwegian transport and logistic costs are significant higher than average EU. In addition there is lack of knowledge about logistic efficiency and environmental issues compared to EU. To verify these indications and shortcomings on k nowledge of transport, logistic costs, ef...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2007-2012

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Tools for the assessment of level and quality of service across different transport markets segments

...

Tildelt: kr 3 999

Prosjektperiode: 2007-2007

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

TOLLQIT - Tools for the assessment of level and quality of service across different transport market segments

...

Tildelt: kr 0,58 mill.

Prosjektperiode: 2007-2012

Sted: Oslo

FOLKEHELSE-Folkehelse

Physical activity and car dependency in modern childhood. Are we socializing our children to car use and poor health?

For children the possibility to be physical active is very important for both physical health and well-being. Several studies claim that a reduction in physical activities (including daily travel) is an important reason for increased weight and obesity am ong children. When everyday life is organ...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2007-2010

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

7RP-PES-1Call

...

Tildelt: kr 0,49 mill.

Prosjektperiode: 2007-2007

Sted: Oslo

SMARTRANS-Næringslivets transp. og ITS

Virkninger for næringsliv og samfunn av ITS og reduserte transportkostnader

Prosjektet skal bidra til å dekke behovet for å identifisere kunnskapsmangler i programmets hovedtema 1) næringslivets avstands- og tidskostnader, 2) integrerte forsyningskjeder og 3) smartere transporter og ITS. I prosjektet legges det opp til følgende d eltema: i) Lavere transportkostnader og ø...

Tildelt: kr 0,60 mill.

Prosjektperiode: 2007-2007

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

DRUID Driving under the influence of drugs, alcohol and medicines

...

Tildelt: kr 0,29 mill.

Prosjektperiode: 2006-2014

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

Campaigns and Awareness- raising Strategies in Traffic safety

...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2006-2010

Sted: Oslo

SAM-EU-Samfinansiering EU-kontoret

Police Enforcement Policy and Programmes on European Roads

...

Tildelt: kr 0,78 mill.

Prosjektperiode: 2006-2010

Sted: Oslo

DEMOSREG-Demokrati, styring og regional

Impacts of NPM reforms in regional policy, hospital policy and infrastructure policy

Innenfor prosjektet analyseres hvilke effekter styringsreformer (såkalt "New Public Management" (NPM)) innenfor tre politikkområder har for regional utvikling, regional fordeling, ressursutnyttelse ("effektivitet") og demokrati. Det første området er dese ntralisering av ansvaret for den smale re...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2006-2010

Sted: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Prosjektetablering- FP6-2005-SSP-5-A (STREP og SSA)

...

Tildelt: kr 81 000

Prosjektperiode: 2006-2006

Sted: Oslo

DEMOSREG-Demokrati, styring og regional

Regional areal og -transportpolitikk: offentlig styring og tjenesteproduksjon i en fragmentert sektor

Transportsektoren er preget av en rekke ulike institusjoner, markedsaktører og forvaltningsnivåer. Dette påvirker mulighetene for å skape og implementere en samlet, helhetlig areal- og transportpolitikk. Flere norske studier beskriver et betydelig sprik m ellom nasjonale mål for en samordnet area...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2006-2008

Sted: Oslo