0 antall prosjekter

PES2020-Prosj.etabl.støtte H2020

High performance data reconstruction equipment for longterm archived digital content from film

Long term archiving of digital data on film as storage medium is becoming an established technology. It is well understood that the amount of data for longterm archiving is growing exponentially and at the same time the market is demanding desperately for such kind of services. Enhancing data de...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Multimodality in Service for Disabled Citizens

* First of all, if the goal of our proposal will be "to develop novel multi-modal adaptive Interfaces" we have to be sure what "novel" involves. An eye-tracking alternative channel for easing the interaction between the user and a certain application, or a tool allowing speech recognition for bl...

Tildelt: kr 61 667

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

PersonalHealth - Self Management of Health in the Whole Value Chain

The project challenges are to provide personalized assistant services for lifestyle management and disease prevention. The project will create a health ecosystem to take part in their health status monitoring, management and risks prevention. The project deals with the H2020 call "Societal Chall...

Tildelt: kr 64 466

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

FireDetect

The overall objective of the project is to develop and test a novel and reliable fire detection system based on a new and advanced Acousto-optic technology. The aim is to develop a system that is able to identify very small temperature rises at a very ear ly stage of a fire, thus providing an ear...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Certified maritime battery pack

Project work description A battery system contains several parts: Cell: Smallest electrochemical unit Module: Assembly of cells including some level of electronic control Sub-Pack: Assembly of 1 or more modules. The smallest unit that can be electrically insulated String: Smallest unit in a bat...

Tildelt: kr 29 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Etablering av utviklingsprosjekt Intelligent Coring System ICS

Formålet er å videreføre arbeid som har vært gjort i detaljert konseptstudie fram til en endelig design som kan danne grunnlag for å starte utviklingen av prototype Intelligent Coring System. CoreAll har patentert et nytt konsept for kjerneboring som in kluderer boring og kjerneboring med samme...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Etablering av EUROSTARS-prosjekt innen avansert industrirobotteknologi

PPM AS utvikler internasjonal høy-teknologi innen industrirobotteknikk. Vi har både nasjonale og internasjonale partnere innen FoU og universitetsmiljøet for å kontinuerlig ha tilgang på kunnskap om ny teknologi. Det skal nå søkes om et EUROSTARS-prosjek t sammen med en europeisk partner for å u...

Tildelt: kr 66 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Coordination among European health sector,R&D community and game industry to promote clinical adoption of game based health application

One of the most promising use of serious gaming/gamification is within health care applications. Most of serious gaming research to date has been in other sectors as in flight simulators, oil&gas operations and in fire&rescue simulation for planning and training where European researchers have...

Tildelt: kr 24 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Forskning og utvikling av HydroCascade, som er et integrert styrings- og reguleringssystem for elvekraftverk i kaskade.

HydroCascade er et nytt konsept for styring og regulering av elvekraftverk i kaskade. HC består i hovedsak av to integrerte deler, der den ene delen utgjøres av konvensjonell kontroll- og instrumenteringsutrustning, mens den andre delen består av teknisk kybernetikk, dvs regulator med proporsjo...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Prosjektetablering søknad til Eurostars 2020 med leveringsfrist 11.09.2014. Utarbeidelse av tilbakemeldingsmodell til monitorerte sjåfører

HipDriver sitt prosjekt om å utvikle solide, pedagogiske, vitenskapelig baserte og opplysende tilbakemeldingsmodeller til monitorerte sjåfører tilfredstiller de krav utlysningen EUROSTARS 2020 med innleveringsfrist 13.03.2014 har (Call 11). Prosjektet v i søker støtte til vil sikre en solid og ...

Tildelt: kr 0,12 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

NOS-HS-Sekr. nord. sam.nemd. HumSam

EWS Security in an Age of Cyber War - Nordic Answers to Global Challenges

Over the last couple of decades, a new man-made domain of war has materialized. Alongside war in the domains of land, sea, air, and space, hostilities between different types of political actors are now destined to take place in cyberspace. Most analysts agree that a few state actors have actual...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Self sealing of leaks in subsea CO2 reservoirs

The overall purpose of the project is to increase the confidence in long term storage of CO2 in offshore reservoirs. In the project, the problems associated with the reservoir integrity with respect to leakage back to the seawater and ultimately the atmo sphere, are to be investigated. In severa...

Tildelt: kr 99 999

Prosjektperiode: 2014-2017

Sted: Ukjent Fylke

IS-NAD-Samarbeid med NORAD-land

REISESTØTTE: Strengthen collaboration in Water, Environment and Hydropower. Norsk spesialist til Kina

...

Tildelt: kr 9 890

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Etablering av Eurostars-prosjekt: Ballast water photocatalyst

Etableringsprosjektet vil inneholde: 1) arbeidstimer for skriving av søknad 2) reiser til forberedende arbeidsmøter 3) utarbeide en Consortium Agreement.

Tildelt: kr 0,12 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

IS-RUOK-EONR-økonomi

NHH-Mannheim exchange program for the spring semester 2014

I am applying for the Ruhrgas as a Master student enrolled in the exchange program at NHH-Norwegian School of Economics and the University of Mannheim. I am applying for the spring semester of 2014. Upon completion of this program I will receive one mast er degree: NHH MSc. in Economics and Busi...

Tildelt: kr 35 000

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

ENERGIX-Stort program energi

High productivity Czochralski silicon ingot casting

Norwegian Crystals AS er en nyetablert produsent av monokrystallinske silisiumskiver som ligger i Glomfjord , Nordland. Waferbaserte solceller er i dag den dominerende teknologien for energiproduksjon fra sollys, og utgjør ca 90 % av årlig installert kapa sitet. Etter en bratt læringskurve i løpe...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

IS-RUST-EONR-statsvitenskap

The European Union's Arctic Policy Process from a Critical Geopolitical Perspective

Over the last decade the Arctic has been increasingly highlighted as an emerging space of and for geopolitics with both "insiders" and "outsiders" determining regional development. In that regard the term "Arctic geopolitics" has become something of a buz zword with respect to the Arctic region, ...

Tildelt: kr 49 000

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

ENERGIX-Stort program energi

Novel environmentally friendly production methods for improved Li-ion batteries

Utviklingen innen Li-ionebatteri har kommet langt allerede og er per i dag den ledende teknologien innen batterier til bærbart elektronisk utstyr. Men det er fremdeles forbedringspotensialer både innen egenskaper til materialene som brukes til elektrodene og i forhold til produksjonsprosessene. ...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

MILJØFORSK-Miljøforskning for en grønn samfunnsomstilling

LAND: Pollination; an ecosystem service affected by climate change

I 2016 publiserte vi en vitenskapelig artikkel (Reitan & Nielsen 2016; open access i PlosOne) hvor vi viser hvor viktig det er å bruke riktig fordeling i statistiske tester. Videre har Andreas Rinvoll levert og forsvart sin masteroppgave. I denne så han på hvordan temperatur påvirker pollinerings...

Tildelt: kr 4,4 mill.

Prosjektperiode: 2014-2017

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Forprosjekt system for deteksjon av maritim oljeforurensning

ISPAS AS har testet muligheten om en spesialutviklet radar kan detektere oljesøl på stille hav. Forsøkene ble gjennomført september 2013 med godt resultat og viser således at det er mulig å oppfylle § 57 Fjernmåling av akutt forurensning, i Forskrift om utføring av aktiviteter i petroleumsvirks...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Energiproduksjon med TideTec turbiner- dannelse av konsortium og forberedelse av søknad til Eurostar 2014

Bevise lønnsomhet i å produsere elektrisitet i kombinasjon med flomvern ved hjelp av TideTecs patenterte dreibare turbin og "energiproduserende bro" konsept. Flere potensielle lokaliteter i Europa og Norge vil bli undersøkt, og det beste stedet valgt for pilotering/prosjektering. Optimalisere o...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Innovative and Sustainable Entrepreneurship of Biological Resources: Merging Ecological, Social and Economic Sciences

EU has to improve green economies, and has therefore promoted strategies to increase bioeconomies. Hence, we have to establish enterprises related to biological renewable resources such as fish, wildlife, plants and their derivatives, as well as products from forestry, crops and livestock. At th...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Advancing tools to address impacts of CO2 and non-CO2 emissions and related uncertainties (ADVANCE)

Development of proposal for Horizon 2010. Summary of proposal (at this stage): We will focus on short lived species in order to distinguish from "classical" climate change studies, but also consider long lived species, accounting for interaction between climate and atmospheric composition. Emph...

Tildelt: kr 50 999

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

SpinChip - PES 2020

SpinChip Diagnostics AS utvikler en rask, enkel og pålitelig multianalyseteknologi i et portabelt instrument. Plattformen skal flytte kritiske bioanalyser fra laboratorier til akuttmottak, sykeseng, legekontor - også kalt "Point-of-Care in vitro diagnost ikk" (PoC IVD). Den patentsøkte teknologi...

Tildelt: kr 52 441

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Finding the Fun Code: Designing a Platform for Making Digital Inclusion Fun for everybody

Our overall ambition is to establish an international multi-stakeholder platform that promotes national and international cooperation and exchange on issues of digital inclusion and competence development towards innovation in education and lifelong learn ing. Our actions will be coordinated and ...

Tildelt: kr 59 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Non-Literal communication and the role of shared knowledge: From cognitive theory to real-world applications and back again

Much of language is used non-literally and its interpretation involves metaphor and metonymy. The comprehension of non-literal language requires a considerable amount of shared knowledge on the part of the interlocutors and many theories of metaphor and m etonymy are based on studies where this s...

Tildelt: kr 24 923

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Forprosjekt for etablering av konsortium for hovedprosjekt Fullskala-testing av ny teknologi for tilstandsovervåkning av brønnhode rør

Det skal utarbeides skisser for å presentere / formidle mulige design konsept for anvendelse av FEMM måle system for overvåkning av tilstanden i casing-rør i brønnhodet. Dette materialet skal være basis for diskusjon om mulige tekniske utfordringer og des ign løsninger for slik anvendelse og for ...

Tildelt: kr 99 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Integrert multimedial løsning for dokumentasjon, opplæring og kvalitetssikring på sykehus.

Den årlige erstatningen for pasientskader i Norge nærmer seg 1 milliard kr. I følge Norsk Pasientskadeerstatning skyldes ca 80% svikt som kunne ha vært avverget. Vi antar at man finner tilsvarende forhold i mange land. Potensialet er derfor stort om vi ka n dokumentere at våre løsninger bidrar ti...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2014-2015

Sted: Ukjent Fylke

BIONÆR-Bionæringsprogram

Konferanse: Genetic Resources for Food and Agriculture in a Changing Climate

The main aims of the conference are to: - Contribute to an understanding of climate change and its predicted impact on agriculture and forestry - increase our understanding of adaptive genetic diversity and adaptation assess how genetic resources for foo d and agriculture are affected by the cha...

Tildelt: kr 74 999

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke

PES2020-Prosj.etabl.støtte H2020

Advancing gamification technologies: Paths to an integrative framework with tool support for creating digital games in non-leisure contexts

The aim of current project is to develop consortium and proposal for Horizon 2020 LEIT-ICT-21 call Advanced digital gaming/gamification technologies. The summary proposed project is given below: This project aims to develop new methodologies and tools t o produce and apply digital games and gam...

Tildelt: kr 0,25 mill.

Prosjektperiode: 2014-2014

Sted: Ukjent Fylke