0 antall prosjekter

DIP-Design Pilot

Float Comfort - DP086

...

Tildelt: kr 0,27 mill.

Prosjektperiode: 2010-2011

Sted: Møre og Romsdal

DIP-Design Pilot

Utvikling av "Intelligent Energy Monitoring System" - DP052

...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2011

Sted: Oslo

DIP-Design Pilot

Kvalitetskontroll i medisinske laboratorier - fra pliktøvelse til verdiskapende merkevare - DP011

...

Tildelt: kr 0,35 mill.

Prosjektperiode: 2010-2012

Sted: Akershus

DIP-Design Pilot

Smått er smart - DP042

...

Tildelt: kr 0,27 mill.

Prosjektperiode: 2010-2011

Sted: Trøndelag - Trööndelage

DIP-Design Pilot

UTURN - DP016

...

Tildelt: kr 0,45 mill.

Prosjektperiode: 2010-2011

Sted: Vestfold

DIP-Design Pilot

Arbeidslivsformer i endring: Scenarier og konsepter for framtida - DP030

...

Tildelt: kr 0,31 mill.

Prosjektperiode: 2010-2012

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

MAKS: maritimt kontrollsystem for framtiden

Skipstekniske systemer blir mer og mer komplekse. Og kontroll og styring av maskiner og teknisk utrustning blir mer og mer problematisk for operatørene etter som systemer med ulike brukergrensesnitt adderes - også innen Green shipping utvikling. Utvikling en på området har vært teknologisk og har...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2011

Sted: Vestfold

DIP-Design Pilot

Resirkulering av porselen - fra problem til verdi - DP054

...

Tildelt: kr 87 097

Prosjektperiode: 2010-2012

Sted: Rogaland

MAROFF-2-Maritim virksomhet og offsh-2

Utvikling av Elektrisk Motorstyring for 3kV Undervanns intervensjon

Prosjektet tar sikte på å klargjøre tekniske og operasjonelle aspekter ved bruk av distribuert (subsea) kraft-distribusjon til elektriske motorer basert på inverterdrift med 3kV driftsspenning. Det søkes en løsning med elektronikk montert i trykkompensert dielektrisk medium. Teknologiske utford...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2011

Sted: Rogaland

FORNY20-FORNY2020

ScaleM - SCALable and rEliable fabric Manager

...

Tildelt: kr 0,20 mill.

Prosjektperiode: 2010-2011

Sted: Oslo

DIP-Design Pilot

Nigth Care - DP079

...

Tildelt: kr 0,22 mill.

Prosjektperiode: 2010-2012

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Integrated Decission support approach for ship, fleet, and maritime supply chain design

The maritime industry constantly faces a number of commercial and technological challenges. Many current challenges are closely linked to the globalization of world trade which has led to greater value chain complexity. New and demanding maritime operati ons in harsh environments like in the Arc...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2011

Sted: Trøndelag - Trööndelage

FORNY20-FORNY2020

Composite Buoyancy

...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2010-2012

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Elektrisk drevet utenbordsmotor

Det skal utvikles konsept for elektrisk drevet utenbordsmotor basert på direkte propelldrift av en avansert vannkjølt elmotor og kraftelektronikenhet plassert i undervannshuset. Det må utvikles en ny el-motor med et forholdsvis lavt turtall og høyt dreie moment tilpasset en optimal utformet unde...

Tildelt: kr 2,5 mill.

Prosjektperiode: 2010-2012

Sted: Agder

DIP-Design Pilot

Stativ til Less båresystem - DP033

...

Tildelt: kr 0,23 mill.

Prosjektperiode: 2010-2011

Sted: Innlandet

MAROFF-2-Maritim virksomhet og offsh-2

Onboard VOC, Cargo and Energy Recovery System

Hamworthy Gas Systems has devised and applied for patents for a system whose aim is to reduce and recover VOC emissions in conjunction with loading and transport of partially volatile cargo by tanker vessels. The system consists of several components, b oth active and passive giving the ability...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2010

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Forprosjekt for fremtidens utslippsfrie skip

Norge har satt som mål at den globale middeltemperatur ikke skal øke mer enn 2 °C fra førindustriell tid. Forskere har identifisert dette som en avgjørende terskel for å unngå de mest dramatiske konsekvensene av global oppvarming. En norsk studie publiser t i tidsskriftet Climatic Change i juni 2...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2011

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Reduksjon av NOx i avgasser fra marine forbrennningsmotorer

For at Norge skal kunne oppfylle sine forpliktelser i henhold til Gøteborgprotokollen må NOx-utslipp ytterligere reduseres. Det er stort fokus på innenriksflåten som stå for 38 prosent av Norges samlede utslipp av NOx i 2007. SINTEF MK sammen med MATINTE K og Yarwil ønsker å avklare muligheter f...

Tildelt: kr 61 012

Prosjektperiode: 2010-2011

Sted: Oslo

BIONÆR-Bionæringsprogram

Valuing Norwegian wool

The project responds to the programme main goal; to increase sustainable value creation from value chains based on natural resources through knowledge production enhancing innovation, profitability and market sensitivity. Contrary to other rural industr ies such as food production and tourism, ...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2010-2013

Sted: Oslo

JTI-Joint Technology Initiatives

ARTEMIS Call 2 Prosjekt iFEST

iFEST will specify and develop an integration framework for establishing and maintaining tool chains for engineering of complex industrial embedded systems; a significant technical contribution in the field of embedded systems technology. Central to iFES T are open tool chains targeting HW/SW co...

Tildelt: kr 5,8 mill.

Prosjektperiode: 2010-2013

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

LNG Fuel Tank for ships and other marine applications, developed on the NLI TS X system.

Goal The TS-X LNG Fuel Tank project has the overall objective of researching and thus verifying the TS-X concept for LNG Fuel Tank systems for marine applications. Main challenges Low/cryogenic temperatures: LNG is cryogenic at -162 degrees centigrade. T his sets high demands on the choice of ma...

Tildelt: kr 3,2 mill.

Prosjektperiode: 2010-2011

Sted: Vestfold

MAROFF-2-Maritim virksomhet og offsh-2

Forprosjekt for uttesting av ny teknologi for energigjenvinning i marine gassmotorer

RR ønsker å utvikle enda renere lean burn gass motorer spesielt med tanke på metanslipp og reduserte CO2 utslipp. For å kunne realisere etterbehandling og varmegjenvinning må motoren tilpasses dette. RR må gjennomføre målinger for å dokumentere CO2 ekviva lente gevinster av etterbehandling av eks...

Tildelt: kr 1,4 mill.

Prosjektperiode: 2010-2010

Sted: Møre og Romsdal

IT-FUNK-IT for funksjonshemmede

Innovation for all - European Business Conference on Inclusive Design

...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2010-2010

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Mekanisert retting og skifting av defekte linekroker

Initiativ: På oppdrag fra Teknologiforum/FHF har Sintef Fiskeri og havbruk AS og et brukerkonsortium fra autolineflåten utført et forprosjekt for å identifisere FoU-prosjekter for autolinefartøy. I forprosjektet ble det identifisert 4 prosjekt, og ett av disse er "Mekanisert retting og skifting...

Tildelt: kr 1,3 mill.

Prosjektperiode: 2010-2012

Sted: Innlandet

MAROFF-2-Maritim virksomhet og offsh-2

FlexShuttle - Direct Shuttle and Loading

The project goals are to develop and verify Direct Shuttle Loading with the FlexShuttle subject to the following Key Performance Indicators (KPI): - Safety should be equal to or better than existing state of the art Dynamic Positioning (DP) offloading ope rations with reduced risk for collision b...

Tildelt: kr 3,1 mill.

Prosjektperiode: 2010-2012

Sted: Rogaland

MAROFF-2-Maritim virksomhet og offsh-2

Sikrere skipsoperasjoner for ankerhånderingsfartøy

-

Tildelt: kr 5,1 mill.

Prosjektperiode: 2010-2015

Sted: Møre og Romsdal

MAROFF-2-Maritim virksomhet og offsh-2

Utvikling av en teknologi basert på avansert oksidasjon og UV-bestråling for rensing av ballastvann

Ved ratifisering av IMOs regelverk knyttet til rensing av ballastvann på skip skapes et enormt marked for gode rensesystemer. På verdensbasis er det anslått at mint 80.000 skip skal ha rensesystem for ballastvann på plass innen 2016. Redox AS har tatt må l av seg å utvikle en teknologi for rensi...

Tildelt: kr 1,6 mill.

Prosjektperiode: 2010-2011

Sted: Møre og Romsdal

MAROFF-2-Maritim virksomhet og offsh-2

Simulering av Krevende Maritime Operasjoner (SIMAR)

Prosjektets hovedmål er å fremskaffe tilstrekkelig kunnskap om menneskelige faktorer i simulering av krevende maritime operasjoner til å kunne utvikle en ny generasjon simulatorer. Kjennetegnet ved den fremtidige simulatoren er at effekter av simulatortre ningen kan måles direkte, både i simulato...

Tildelt: kr 5,1 mill.

Prosjektperiode: 2010-2013

Sted: Buskerud

MAROFF-2-Maritim virksomhet og offsh-2

Advanced environmental design optimalisation & control

The program will demonstrate technologies within simulation and control technologies that will give substantial better vessel efficiency, reduced emissions and increased safety. This is not available in the market today. A complete understanding of the use of energy during the ship design phas...

Tildelt: kr 15,0 mill.

Prosjektperiode: 2010-2012

Sted: Vestland

MAROFF-2-Maritim virksomhet og offsh-2

Low Carbon Shipping

Previous studies have indicated that shipping has a potential to reduce GHG emissions in a cost-effective manner (i.e. emissions can be cut with net cost savings) . These options often increase the price of new ships (or upgrading of existing), but provid es substantial cost saving in a life-time...

Tildelt: kr 5,2 mill.

Prosjektperiode: 2010-2012

Sted: Akershus