0 antall prosjekter

MAROFF-2-Maritim virksomhet og offsh-2

Integrated Marine Electrical Power and Control Systems

During the last decade there has been a technology shift in marine power and propulsion systems from mechanical solutions to diesel-electric propulsion involving advanced computer-based control systems partly or fully integrated with each others. The ba sis for the application of the project is...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2007-2013

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Investigating hydrodynamic aspects and control strategies for ship-to-ship operations

Applications of ship-to-ship operations for cargo transfer are expected to be increasing in the future. Export of Russian crude oil from Murmansk is based on ship-to-ship transfer from floating storage vessels. It is assumed that future development of Nor thwest Russian onshore and offshore field...

Tildelt: kr 13,0 mill.

Prosjektperiode: 2007-2012

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Synkronisert og kostnadseffektiv utnyttelse av skip og havn, gjennom anvendelse av maritime overvåkningsdata og moderne maritim IKT

I dag fører ofte mangelfull kommunikasjon mellom skip og havn til unødvendig ventetid før skip får legge til kai. Dagens teknologi åpner imidlertid for nye løsninger som kan forbedre skipets lønnsomhet via optimaliserte operasjoner. Ved bedre samhandling og planlegging kan skip vite hva som vente...

Tildelt: kr 2,1 mill.

Prosjektperiode: 2007-2009

Sted: Akershus

IS-DAAD-Forskerutveksl. Norge-Tyskland

Durand, Dominique daadppp(07)80

...

Tildelt: kr 30 000

Prosjektperiode: 2007-2009

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Competence Project for Conceptual Design Methods for Complex, Customized Ship

One of the main competitive advantages of the Norwegian maritime industry today is our ability to develop and deliver complex, customized ships with high quality and short lead times to the global market. To maintain and further strengthen this position, we need to be best-in-class to develop and...

Tildelt: kr 16,0 mill.

Prosjektperiode: 2007-2013

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Modellbasert system for sikker og effektiv overvåking og kontroll av undervannsoperasjoner.

Mange marine operasjoner er hemmet av mangel på informasjon om deler av systemet, spesielt i tilfeller der overflatefartøy er koblet til undervannskomponenter. Dette prosjektet vil vise hvordan tilstandsestimering kan benyttes for å øke den tilgjengelige informasjonen om systemet. Problemstillin...

Tildelt: kr 4,6 mill.

Prosjektperiode: 2007-2010

Sted: Møre og Romsdal

MAROFF-Maritim virksomhet og offshore operasjoner

Respons prediksjon og operasjons optimalisering for brønnintervensjonsfartøy

SeaFlex og Kongsberg Seatex samarbeider om utvikling av et ekspertsystem for høyere effektivtet ved vedlikehold av undervannsbrønner, TexFlex. Et forprosjekt som nærmer seg avslutning inneholder en evaluering av teknologien, samt målinger offshore med bø lgeradar og bevegelsesmåling. Følgende ko...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2007-2008

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

FellowSHIP - Fuel Cells for Low Emission Ships

FellowShip is a joint industry R&D project to develop and demonstrate hybrid fuel cell power packs suitable for landbased, marine and offshore use. The power packs build on fuel cell technology in hybrid configurations with conventional engines, in combin ation with new electrical-, power electro...

Tildelt: kr 32,5 mill.

Prosjektperiode: 2007-2010

Sted: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

Safe and cost effective ship-to-ship operations in Arctic waters

The project aims at developing a set of common Russian - Norwegian guidelines for STS operations. This will enable Norwegian interests to have a commanding role in such a development, and to become competitive and attractive partners for later projects in the Arctic area. The project will also p...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2007-2011

Sted: Oslo

MAROFF-Maritim virksomhet og offshore operasjoner

Fremtidens tråler

Prosjektet retter seg mot fagområdene hydrodynamikk og maskineri med fokus på energisparing og miljø, samt fagområdet redskapshåndtering med fokus på fiskekvalitet og sikre arbeidsoperasjoner ombord i trålere. En dobling av drivstoffpriser på få år, samt tyngre trålsystem har ført til svært høy...

Tildelt: kr 6,7 mill.

Prosjektperiode: 2007-2008

Sted: Møre og Romsdal

MAROFF-2-Maritim virksomhet og offsh-2

Ship Propulsion in Extreme Seas

Design of ships and propulsion systems are currently based on analyses of the performance in calm water. The effects of waves and ship motions are mainly taken into account using crude safety factors. Increasing fuel costs, introduction of novel ship desi gns and propulsion systems, together with...

Tildelt: kr 12,1 mill.

Prosjektperiode: 2007-2012

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Use of adhesive polymer film as replacement for anti corrosion and anti fouling coating in a maritime environment

The idea behind the MARFILM project is to verify that adhesive polymer film can be used for corrosion protection purposes and replacement for antifouling coatings. This verification process is an essential part of the R&D project as there are no independ ent investigations of the corrosion prote...

Tildelt: kr 2,0 mill.

Prosjektperiode: 2006-2010

Sted: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Utvikling og implementering av prosess-styringssystem (operasjonssentral) for fiskeoppdrettsnæringen (PISCADA)

Sammenkopling mellom teknologi og menneske ved hjelp av IKT-baserte trådløse nettverk har ikke vært gjort før innafor havbruksnæringa. En har operert med frittstående system som ikke har kommunisert med verken menneske eller med instrumentering på intelli gent vis. Heller ikke har en tenkt på opp...

Tildelt: kr 6,6 mill.

Prosjektperiode: 2006-2009

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Reporting evolution - from "Nice to know" to "Need to know"

Modern shipping companies relay more and more on large (and costly) information and communication technology (ICT) systems to operate their fleets. In this respect shipping companies does not differ from any other large international organisations. Howeve r, we know from research on such systems ...

Tildelt: kr 5,4 mill.

Prosjektperiode: 2006-2009

Sted: Vestland

MAROFF-Maritim virksomhet og offshore operasjoner

Biodiesel i maritim og offshore sektor. Forprosjekt.

Forprosjektet skal lede fram til et hovedprosjektet som vil etablere ny kunnskap om anvendelse av biodiesel i offshore og marint miljø. Driftserfaringer fra en slik faktisk bruk av dette drivstoffet vil bli systematisert og analysert. Grunnlaget for dette vil i første rekke være gjennom utprøvin...

Tildelt: kr 0,13 mill.

Prosjektperiode: 2006-2006

Sted: Vestland

MAROFF-Maritim virksomhet og offshore operasjoner

VOC Emissions Reduction from Transport of Petroleum

Recovery of VOC emissions from the cargo tanks of a ship requires an active recovery system that is large, complicated and expensive. On the other hand, reducing the release of VOC from the cargo can be achieved by passive design features and optimised lo ading procedures. The use of passive desi...

Tildelt: kr 0,77 mill.

Prosjektperiode: 2006-2008

Sted: Rogaland

IS-BILAT-Mobilitet Norge-USA /Canada

Scientist exchange between SINTEF Fisheries and Aquaculture and The University of New Hampshire (USA).

SINTEF Fisheries and Aquaculture (SFH) have had contact with the University of New Hampshire (UNH) since the Open Ocean Aquaculture conference in 2001, where scientist from the two institutions first met. Despite maintaining contact over several years the scientific cooperation has so far been l...

Tildelt: kr 0,24 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

Skip-til-skip operasjoner i nord

Presently there is no direct export corridor for wet gas from Northwest Russia. Existing pipe line capacities are fully used and there is a need to develop a new waterborne export chain for different types of wet gas and condensate produced from gas field s on the Yamal Peninsula. Some projects a...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2010

Sted: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Optimization of bottom trawl gear with respect to energy consumption.

The increasing oil prices and the minimal pricing on catch are making energy optimization a topic of current interest for the bottom trawling industry. Experiments with different trawl configurations in order to optimize the gear are both costly and time consuming. The consequence is that in orde...

Tildelt: kr 8,3 mill.

Prosjektperiode: 2006-2011

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Utvikling av modulært stålanlegg

Gjennom prosjektet har prosjektdeltakerne som ambisjon å utvikle ett nytt oppdrettsanlegg av typen hengslet stålanlegg som er mer egnet til bruk på værutsatte lokaliteter ved å redusere effekten av bølgeindusert belastning på anlegget. Anlegget skal være enklere å forankre og det skal bygges in...

Tildelt: kr 2,2 mill.

Prosjektperiode: 2006-2008

Sted: Vestland

MAROFF-Maritim virksomhet og offshore operasjoner

Fremtidens tråler

Siktemålet for det påtenkte hovedprosjektet er å utvikle et nytt trålerkonsept med redusert energiforbruk og lavere utslipp av CO2, NOX og SOX til luft, samt å videreutvikle systemer for redskapshåndtering med tanke på sikre arbeidsdekkoperasjoner og skån som råstoffbehandling. I forprosjektet v...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2006

Sted: Møre og Romsdal

IS-BILAT-Mobilitet Norge-USA /Canada

Research leave at MIT LFEE for Asgeir Tomasgard

Infrastructure for natural gas production and processing often has a lifetime of 30 years and more. This means that the operational use of the infrastructure and the requirements for its design typically change over its lifetime. Strategic decision suppor t models for investment analysis need to ...

Tildelt: kr 0,24 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

IS-BILAT-Mobilitet Norge-USA /Canada

A Liquefied Energy Chain for Exploitation of Natural Gas, Capture and Injection of CO2 for EOR - Optimisation, Pinch and Exergy Analysis

The objective is to create an energy and cost effective transport chain for stranded natural gas for power production with CO2 capture including liquefaction and transport of CO2 to be injected in an oil field for EOR or an another suitable storage. The integrated liquefied energy chain consis...

Tildelt: kr 0,22 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

New International Training and Pre-simulation Concept for Arctic Marine Operations - Phase 1

Prosjektet er en videreføring av et forprosjekt som ble gjennomført med Statoil ASA som oppdragsgiver. Hovedrosjektet deles i fase 1 og 2. Videre beskrives fase 1 som det i denne omgang søkes støtte for fra Norges Forskningsråd. Fase 1 vil gå fra 3. kvart al 2006 til 4. kvartal 2007. Delprosjekte...

Tildelt: kr 1,9 mill.

Prosjektperiode: 2006-2007

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Safe Maritime ICT

Software as an integrated part of components onboard vessels, as well as a component in its own right controlling essential systems of physical components (machines) is increasingly being used in vessels, because it promises more functionality, better cre w guidance, lower vessel building costs, ...

Tildelt: kr 2,8 mill.

Prosjektperiode: 2006-2008

Sted: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

USV - Unmanned Surface Vehicle

Peregrine Dynamics (PD) er initiativtaker, adminstrator og eier av prosjekt som har til hensikt å realisere forskningstung teknologi for å demonstrere ubemannet autonom operasjon av maritim overflatefarkost. Utviklingskonsortiet består av aktører fra: Fo rskning: - Institute for Systems and Robo...

Tildelt: kr 4,8 mill.

Prosjektperiode: 2006-2008

Sted: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

ShipCom - Ship Communication - Forprosjekt

Den teknologiske nyvinningen innen kommunikasjon og de nye anvendelsesområdene denne teknologien bringer med seg er med på å styrke eller eventuelt svekke den maritime bransjen ut fra omfang av innført teknologi. Norge som nasjon er langt fremme men for a t vi fortsatt skal være blant de ledende ...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2006

Sted: Møre og Romsdal

MAROFF-Maritim virksomhet og offshore operasjoner

SeaLion maritime wireless systems and services - Forprosjekt

SeaLion prosjektet er et initiativ mellom en rekke norske firmaer og forskningsinstitusjoner med mål om å forske på nye innovative tjenester og produkter innen maritim logistikk, skipsoperasjoner og koblinger mellom landbaserte og skipsbaserte systemer. U tnyttelse av ny trådløs teknologi for bru...

Tildelt: kr 0,15 mill.

Prosjektperiode: 2006-2006

Sted: Agder

MAROFF-Maritim virksomhet og offshore operasjoner

Neste generasjons skips- og utstyrsproduksjon - Erfaringer, vitenskapelig bearbeidet til ny metodikk .

Det er vanlig å ta utgangspunkt i tidligere løsninger når en utvikler et nytt produkt, men løsningene blir som regel hentet sporadisk og eldre løsninger er ikke dokumentert med hensyn på fremtidig gjenbruk. Samtidig har enkeltprosjektene begrensende ressu rser, knappe tidsfrister, tøffe resultatm...

Tildelt: kr 4,8 mill.

Prosjektperiode: 2006-2008

Sted: Møre og Romsdal

MAROFF-Maritim virksomhet og offshore operasjoner

TBT-free Anti Fouling Paint Test Programme

Background: On 5 October 2001, a diplomatic conference adopted the IMO convention on the control of harmful anti-fouling systems on ships by consensus, the convention states a global prohibition on the application of organotin compounds which act as bioci des in anti-fouling systems on ships. Man...

Tildelt: kr 0,48 mill.

Prosjektperiode: 2006-2008

Sted: Oslo