0 antall prosjekter

FMEINFRA-FME - utstyr/infrastruktur

CenSES-Forskningsinfrastruktur 2011

...

Tildelt: kr 3,0 mill.

Prosjektperiode: 2011-2013

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

NOWITECH-Infrastruktur 2011-Research Centre for Offshore Wind Technology- (FLEXWT/NOWERI/NORCOWE)

This application considers infrastructure for research on offshore wind turbines. It constitutes a platform for open research addressing grid connection of offshore wind turbines, including impact of grid faults on wind turbine stability, structural loads and lifetime, and development of new con...

Tildelt: kr 5,5 mill.

Prosjektperiode: 2011-2014

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

The Research Centre on Zero Emission Buildings (ZEB)- forsknigsinfrastruktur 2011

...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2011-2015

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

BIGCCS. Forskningsinfrastruktur 2011

...

Tildelt: kr 7,0 mill.

Prosjektperiode: 2011-2013

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

CenBio. FME-forskningsinfrastruktur- 2011

...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2011-2015

Sted: Akershus

FMEINFRA-FME - utstyr/infrastruktur

Solar United FME forskningsinfrastruktur 2011

Det ble søkt om 8.0 MNOK og gitt et tilsagn på 6.5 MNOK. Av denne grunn blir det ikke nok midler til å kjøpe inn enheten med lavest prioritet, en XRD-enhet for avbildning, innenfor dette prosjektet. Vi ønsker i stedet å benytte de resterende midlene i til sagnet (0.25 MNOK) til å finansiere slutt...

Tildelt: kr 6,5 mill.

Prosjektperiode: 2011-2015

Sted: Akershus

FMEINFRA-FME - utstyr/infrastruktur

CEDREN. FME forskningsinfrastruktur 2011

In order to in detail be able to investigate and assess the implications of hydropower development in an environmental context, equipment/infrastructure for measuring and analysing in situ/changing/post-change situations is of vital importance. In detail, there is a need for acquiring and updati...

Tildelt: kr 2,4 mill.

Prosjektperiode: 2011-2013

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

SUCCESS. FME infrastruktur 2011

The application from FME-SUCCESS consists of 4 parts in prioritized sequence. A whole range of activities in the SUCCESS centre has been addressed in this application, with particular focus on equipment that will strengthen the cooperation within the cent re. The proposed infrastructure will expa...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2011-2014

Sted: Vestland

FMEINFRA-FME - utstyr/infrastruktur

NORCOWE- Infrastruktur 2011

Priority list: 1. Motion simulation laboratory 2. A 3D fast scanning lidar (WindCube by Leosphere) More specifically, the scientific goals of the proposed infrastructure are as follows: a) Simulation of wave-induced motions in a controlled and repeatable environment without the need for a wave ...

Tildelt: kr 4,3 mill.

Prosjektperiode: 2011-2013

Sted: Vestland

FMEINFRA-FME - utstyr/infrastruktur

CEDREN. FME forskningsinfrastruktur

Birds being electrocuted may e.g. result in power outages and thus have an economic impact, and birds colliding with wind turbines or power lines may negatively affect the societal perception of and acceptance for renewable energy. The development of on- and offshore wind energy and associated p...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2010-2012

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

SUCCESS. FME infrastruktur 2010

The infrastructure to be implemented in this project will expand and strengthen the analytical capability in the centre as well as the ability of the centre to visualize and communicate the scientific results. Particular focus is on equipment that will st rengthen the cooperation within the centr...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2010-2012

Sted: Vestland

FMEINFRA-FME - utstyr/infrastruktur

CEER Solar. FME forskningsinfrastruktur.

The present project represents a significant upgrade of the solar cell research infrastructure at CEER laboratories at IFE, NTNU, SINTEF and UiO. Equipment for processing and characterizing a next generation of solar cells is purchased. Concretely, a phot oluminescence excitation spectroscopy uni...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2010-2013

Sted: Akershus

FMEINFRA-FME - utstyr/infrastruktur

ZEB. FME Forskningsinfrastruktur. Full Scale Test Cell Field Station Laboratory 2010

The ZEB Research Centre is dependent on having laboratory facilities to carry out its R&D activities. All the five Work Packages will do analysis and testing of the materials, components, structures and solutions they develop in the laboratories, in-situ at a field station, and in pilot building...

Tildelt: kr 6,0 mill.

Prosjektperiode: 2010-2015

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

CenBio. FME-forskningsinfrastruktur

FME-CenBio will invest in a range of equipment covering key biological and technical steps in the conversion of biomass to energy. All components are essential for achieving CenBio objectives. Most of the equipment consists of commercially available assem blies. The proposed equipment covers a ma...

Tildelt: kr 4,0 mill.

Prosjektperiode: 2010-2013

Sted: Akershus

FMEINFRA-FME - utstyr/infrastruktur

BIGCCS. Forskningsinfrastruktur.

De omsøkte midler skal gå til aktiviteter under FME BIGCCS - International CCS Research Centre. Utstyr og infrastruktur er rettet inn mot CO2 fangst og -lagring. Utstyret er i det store og hele tiltenkt grunnleggende aktiviteter som støtter opp under mål om kunnskapsutvikling i BIGCCS. Beskrivel...

Tildelt: kr 3,5 mill.

Prosjektperiode: 2010-2012

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

CEDREN-Centre for Environmental design of renewable energy- Infrastructure

The project will finance three items of research infrastructure, instruments for laboratory and field experiments for the hydraulic research facilities of the Hydraulic Laboratory (Vassdragslaboratoriet (VL)), Department of Hydraulic and Environmental Eng ineering (IVM) at NTNU, for research in t...

Tildelt: kr 8,3 mill.

Prosjektperiode: 2009-2012

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

The Research Centre on Zero Emission Buildings (ZEB)- forsknigsinfrastruktur

The ZEB Research Centre is dependent on having laboratory facilities to carry out its R&D activities. All the five Work Packages will do analysis and testing of the materials, components, structures and solutions they develop in the laboratories, in-situ at a field station, and in pilot building...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2009-2012

Sted: Trøndelag - Trööndelage

FMEINFRA-FME - utstyr/infrastruktur

EFOWI-Norcowe & Nowitech

...

Tildelt: kr 17,0 mill.

Prosjektperiode: 2009-2012

Sted: Vestland

FMEINFRA-FME - utstyr/infrastruktur

SolarCell-The Norwegian Research Centre for Solar Cell Technology

...

Tildelt: kr 5,0 mill.

Prosjektperiode: 2009-2011

Sted: Akershus