Real-Time in Situ Detection of Strontium-90 Radioactivity in Water: Ultra-Sensitive Detector System for Continuous Monitoring

Tildelt: kr 0,15 mill.

The project was accepted by EU in 2000 and has the EU Contract No. ICA2-CT-2000-10013. Due to contractual and non-delivery problems with eastern partners, the EU contract has, with the consent of EU, been amended twice, and an application of a third amend ment has recently been accepted for consideration by EU. It is reason to believe that EU will accept it. IFE will immediately inform the Research Council of the result. If it is not accepted, the project will probably not continue, and our application for the years 2005 and 2006 will then not be relevant. The project will be finalised first quarter 2007, but IFE's final reporting work has been included in the 2006 grant. IFE's original role in the project was i) to develop and produce an automatic sampli ng device for feeding the detector vessel with the relevant liquid, ii) to calibrate and test the detector system under Arctic conditions, and iii) to perform laboratory analyses of the same liquid to confirm the results of the new detector. Due to non-de liverables from eastern partners, IFE has now also taken over the responsibility of iv) the detailed drawings and production of two detector compartments in titanium and v) to assist one partner with the communication system. The very important detector s ystem itself is developed by the Moscow group and will be very well taken care of by them. The development of both i) and v) has for most parts been done. Final development and production of three units of both systems and testing them will be done in 20 05. The detailed drawings of iv) has been made, and the production of the vessels will be done in the second quarter 2005. The Moscow group will then install the detector parts, and the total systems will be ready for testing by the partners last quarter 2005 or first quarter 2006. Field testing and lab. analyses will be performed by IFE and partners in 2006. The final report will be delivered by the end of first quarter 2007.

Budsjettformål:

DIV-INT-Annet internasjonalt samarbeid

Temaer og emner

Ingen temaer knyttet til prosjektet