Improved modelling of near well multiphase flow for optimised planning of ICD/AICD valves in production wells

Alternativ tittel: Forbedring av modellering av nærbrønn-strømning for optimalisert planlegging av ICD/AICD ventiler i produksjonsbrønner

Tildelt: kr 1,2 mill.

Prosjektnummer:

262483

Prosjektperiode:

2016 - 2020

Midlene er mottatt fra:

ICD/AICD (Inflow control device/Autonomous ICD) teknologi har vist sin gjennomførbarhet og stort IOR potensiale for oljeproduksjon fra tynne oljelag hvor gass og vanninntrengning til produserende brønner ofte oppstår. Når ICD/AICD er installert, for eksempel en ventil i hver rørlengde i perforerte sone, kan gass eller vanninntrengning reduseres ved selv-kontrollerte ICD/AICD ventilen når deres innstrengningsrate overstiger en forhåndsinnstilt verdi, for derved å stoppe gass- eller vann- inntrenging i brønnsegmentet. Dette prosjektet tar sikte på å identifisere dagens teknologi gap i modellverktøy, spesielt for nær-brønnstrømmen rundt ICD/AICD ventiler for å forbedre nødvendige verktøy og metodikk for optimalisert planlegging av ICD/AICD installasjon. I 2018, var hoved prosjekt aktivitet på å modellere strømning rundt ICD/AICD ventiler for et felt ved bruk av kommersielle modelleringsverktøy med forfinet grid og med CFD modelling. Detaljer forstrømningsegenskaper ble studert from simuleringer. Dette arbeidet skal fortsette i 2019 med målet for å kunne forbedre felt simuleringer og inngangsdata fra laboratoriet. I 2019, har prosjektet avsluttet med flere CFD modeller, både storskala og labskala og modellene hjelper oss for å forstå oppførsel av strømningsmønster og ytelse av AICD ventiler. En viktig oppklaring er den korte tiden fra vannet fra reservoar trenger seg inn i ventilen til den blir fullstendig oversvømt og avstengt. Dette fenomenet vil hjelpe med fremtidig optimalisering av AICD ventil plassering. Det avdekker også behov for forbedring av ytelses karakterisering (P-Q kurve) som tar hensyn til ventilenes plassering og innpakning rundt dem. Det blir derfor foreslått et lab oppsett for å måle P-Q kurven som også inkluderer AICD ventil innpakning og plassering. Lab oppsettet kan også brukes til å validere CFD modellering som kan i neste omgang brukes til å optimalisere design og beregning av AICD ventil oppførsel. Prosjektet er planlagt avsluttet i desember 2019 med sluttrapport. En konferense artikkel med tittel ?Near-wellbore simulation of AICD completion ? comparing CFD modelling with conventional reservoir simulation? var presentert på 10th International Conference on Multiphase Flow, ICMF 2019, May 19, 2019, De Janeiro, Brazil.

The objective is to establish the best practice for modelling of multi-phase near well flow for optimised planning of ICD/AICD valves in production well. Main achievement: - The methdology of CFD modelling for AICD flow near well has been established and validated using experimental data and fine-grid ECLIPSE simulations - CFD model of field scale reveals the detailed flow pattern near the AICD valves which may improve future AICD installation strategy - Near-well flow patterns around AICD (micro annulus, gravel pack, sand screen) from CFD modelling can form basis for field scale modelling improvement - AICD performance measurements are crucial and are non-linearly dependent on flow fluid properties such as viscosities. - A laboratory AICD test bench design is proposed and validated using a CFD model. In addition, the project partners have established good collaboration as basis for future collaboration between Norway and Brazil.

The anticipated method is to start with CFD modelling and combined with an existing modelling tool to identify the critical areas of technology gap. Once the gap is identified, new method and potentially new software modules will be developed to close the gap. We will target 3 main deliveries: 1)Best practice for ICD/AICD modelling using standard ad existing reservoir engineering software 2)New and standalone software tool which is compatible with existing commercial software and procedures for better estimation of ICD/AICD benefit during well planning; 3)Identify the way for validation of the new method and software, numerically, using field data, or if necessary propose experimental setup at lab scale for validation of the existing and new mathematical formulations. The main scope of work will be 1)Set up 1-2 real field cases and use CFD and field modelling tool to identify the gap between the field data and the results from the existing modelling tool. 2)Develop new method and mathematical formulations to close the identified gap 3)Recommend new procedures for well planning and better estimation of benefit of ICD/AICD implementation 4)Propose validation method to qualify the results from 3)

Publikasjoner hentet fra Cristin

Ingen publikasjoner funnet

Ingen publikasjoner funnet

Ingen publikasjoner funnet

Ingen publikasjoner funnet

Budsjettformål:

PETROMAKS2-Stort program petroleum