Tilbake til søkeresultatene

EUROSTARS-EUROSTARS

E!114180 IESS - Integrated Electric Sealing System for well intervention.

Alternativ tittel: E!114180 IESS - Integrated Electric Sealing System for well intervention.

Tildelt: kr 4,0 mill.

Forsknings- og utviklingsprosjektets hovedmål er å utvikle et nytt Integrated Electric Sealing System (IESS) for å øke driftssikkerheten under brønnintervensjon, og for å øke utvinningsgraden på eksisterende oljebrønner. IESS skal også kunne brukes i «deep sea mining applications». IESS er basert på ny innovativ og patentert teknologi. Når det brukes til brønnintervensjon, blir IESS-systemet installert som en del av brønnkontrollsystemet for å gi tetting når man kjører forskjellige verktøy i brønnen. En egen energilagringsenhet, ePod, utformes som en integrert del av IESS som vil øke strømforsyningssikkerheten. Hovedprinsippet er at en elektrisk strøm føres gjennom væsken inne i tetningslegemet i nærvær av et intenst magnetfelt. En elektrolytt injiseres i væsken for å øke dens elektriske ledningsevne. Funksjonelt beveger væsken seg på samme måte som den ledende delen av en elektrisk motor, og skyver væsken nedover for å kontrollere trykket i brønnen. Prosjektledelsen er satt opp slik at Enhanced Recovery Technologies AS som hovedpartner har den overordnede prosjektledelsen, assistert av prosjektleder hos vår partner HUGG MultiControl Sp z oo i Krakow, som har teknisk ekspertise og ledelseserfaring fra olje- og gassektoren og FoU-sektoren. I prosjektet har vi utført følgende aktiviteter: 1) Prosjektledelse 2) Elektrokjemisk studie, analyse og design av elektrolytt i tetningsgapet 3) Mekanisk design elektrolyttinjeksjon 4) Elektromekanisk design 5) Mekanisk utforming av tetning og tilbehør 6) Design av strømforsyningssystem I prosjektet har vi utført hydrauliske, mekaniske, kjemiske og elektriske analyser og beregninger. Detaljert teknisk design er under utførelse.

The Integrated Electric Sealing System (IESS), which shall be used in well Intervention, aims to increase the safety during operations, and the recovery rate on existing oil wells and for future deep-sea mining applications. The functionality is to control the well pressure and seal around intervention and drilling tools while performing well operations. The marked is continuously requesting for cost-effective and environmental technology to enable increased oil recovery from oil wells. IESS will make it possible for intervention tool and drill strings to be installed without stop in the operation to load tool into a well. IESS technology is attractive because it is based on magneto hydro dynamic principles and has no moving mechanical parts.

The project aims to establish cooperation with the identified companies (SMEs) to conduct research and development of the Integrated Electric Sealing System (IESS) which shall be used in well intervention to increase the safety during operations, and the recovery rate on existing oil Well’s and for deep-sea mining applications. IESS is based on new innovative technology. When used for Well Intervention the IESS System will be installed as part of the Well Control System to provide sealing when running different tools into the Well. A separate Energy Storage unit, ePod, will be designed as a integral part as IESS. The ePod will increase safety regarding power supply during operations. The IESS technology will also be used for deep sea mining applications. An electric current is passed through the fluid inside the seal body in the presence of an intense magnetic field, which interacts with the magnetic field of the current through the fluid. An electrolyte (if required) is inserted into the fluid in order to increase its electrical conductivity. Functionally, the fluid is then the moving similarly to the conductive part of an electric motor, pushing the fluid in the downward direction to control the pressure in the well. The project management is set up in a way where Enhanced Recovery Technologies AS as main partner holds the project manager for the whole project, assisted by project manager of our partner HUGG MultiControl Sp z o.o located in Krakow, Poland, who has technical and managerial experience in the oil and gas sector and in the R&D sector. The R&D project should be completed within 30 months.

Budsjettformål:

EUROSTARS-EUROSTARS