0 projects

Selections based on text queries do not reflect the Research Council's published statistics. Read more...


Text queries provide an overview of all projects containing the specified text in either its title or summary. This may result in a different selection of projects than that used by the Research Council as presented in its various publications. The Research Council's statistics are normally based on selections in set categories. You will find these in the left menu, in the diagrams themselves or when selecting from the left column of autocomplete suggestions via the search field.

Les mer...

IS-NORDIC-Nordic Pilot Programme for NSF

Genome-wide characterization of Dnase-hypersensitive regions across cell types and differentiation stages

...

Awarded: NOK 52,000

Project Period: 2011-2011

Location: Vestland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Security Personal Helper based on Enhanced Reputation, Identity management and Cryptographic data Storage

...

Awarded: NOK 43,450

Project Period: 2011-2012

Location: Oslo

FORNY20-FORNY2020

Development, qualification and commercialization of floating Vertical Axis Wind Turbine-Proof of concept

...

Awarded: NOK 2.6 mill.

Project Period: 2012-2013

Location: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Collective Awareness Platform to enhance social media education in parents, children and teenagers - CAPCHILD

...

Awarded: NOK 98,563

Project Period: 2012-2013

Location: Innlandet

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of a Unified, Secure and Efficient Metering System for Real Time Monitoring of Distribution Networks

...

Awarded: NOK 60,000

Project Period: 2012-2012

Location: Oslo

PES-EUR-Prosjektetablererstøtte Eureka

New innovative hull design for large commercial vessels reducing fuel consumption and improved carbon footprint.

...

Awarded: NOK 0.10 mill.

Project Period: 2012-2012

Location: Vestfold

DEMO2000-Prosj.ret tekn.utv. petro.virk

Permanently Installed Downhole 3-Phase Flowmeter: Field Qualification and Performance Evaluation

...

Awarded: NOK 2.2 mill.

Project Period: 2007-2015

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

AQUatic INdicators for Ecological Status assessment - responses to degradation, restoration and global change

...

Awarded: NOK 0.37 mill.

Project Period: 2007-2007

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Novel nanobiosensors composed of nanostructured carbon materials and molecularly imprinted polymers

...

Awarded: NOK 0.20 mill.

Project Period: 2008-2008

Location: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Reliable portable seizures alarm increasing independency and quality of life for people suffering from Epilepsy

...

Awarded: NOK 0.20 mill.

Project Period: 2007-2007

Location: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

R&D on water quality mgmt leading to harmonisation of analysis and assessment procedures in Romanian Water Directorates

...

Awarded: NOK 50,000

Project Period: 2008-2008

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

BioGuard - a real-time environmental monitoring system for offshore drilling and production operations

...

Awarded: NOK 3.3 mill.

Project Period: 2006-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

WIRESCAN Sub-Sea Development Project Real-Time Condition Monitoring and Analysis for Sub-Sea Wire Systems

...

Awarded: NOK 3.0 mill.

Project Period: 2006-2009

Location: Akershus

MATPROG-Matprogrammet: Norsk mat fra sjø og land

NKJ 126 Genomic analyses and modelling of plant secondary metabolism for development of oilseed rape with improved pest resistance

...

Awarded: NOK 3.8 mill.

Project Period: 2006-2011

Location: Trøndelag - Trööndelage

SAM-EU-Samfinansiering EU-kontoret

HEATOX - Heat-generated food toxicants, identification, characterisation and risk minimisation (STREP)

...

Awarded: NOK 0.75 mill.

Project Period: 2004-2011

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Definition and Early Prototyping for High Performance Detectors for Next Generation of Full-Body PET Scanners

...

Awarded: NOK 74,999

Project Period: 2004-2004

Location: Oslo

MAROFF-Maritim virksomhet og offshore operasjoner

Samfinansiering av prosjekt 168165 i PULS-programmet: VITSAR - Virtual Integration of Terminal Services and Resources

...

Awarded: NOK 1.4 mill.

Project Period: 2005-2008

Location: Trøndelag - Trööndelage

PES-EU-Prosjektetablererstøtte EU (bedrift)

Satellite-based Independent Grid for Resilient and Instantaneous Distributed communications

...

Awarded: NOK 0.17 mill.

Project Period: 2007-2007

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

An integrated toolkit for analysing sustainability of societal and ecosystem metabolism in a rapidly growing city

...

Awarded: NOK 87,499

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Multidisciplinary Approach to Engineered Nanoparticles Toxicology, Exposure and Risk Assessment

...

Awarded: NOK 29,999

Project Period: 2007-2007

Location: Akershus

VRI-Virkemidler for regional innovasjon

PermaBar Laser based permeablilty sensor for testing and quality assurance of high performance barrier materials

...

Awarded: NOK 0.56 mill.

Project Period: 2007-2010

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Enabling European SMEs to remediate wastes, reduce GHG emissions and produce biofuels via microalgae cultivation

...

Awarded: NOK 0.12 mill.

Project Period: 2008-2010

Location: Oslo

PES-EUR-Prosjektetablererstøtte Eureka

ESTAR Rapid and accurate audio signal searches

...

Awarded: NOK 87,465

Project Period: 2008-2008

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Holistic Environment for Fire-fighting: Addressing Emergency Service Training, Utilisation and Support

...

Awarded: NOK 50,000

Project Period: 2012-2012

Location: Akershus

FORNY20-FORNY2020

Preparation technology and application of polymer monolithic columns for nanoscale peptide separations

...

Awarded: NOK 3.3 mill.

Project Period: 2013-2014

Location: Rogaland

IS-NAD-Samarbeid med NORAD-land

Interaction of multifactor climate change and soil pollution in forest management: Testing a model plant species, European aspen

...

Awarded: NOK 10,000

Project Period: 2013-2013

Location: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

Demonstration of mussel harvesting combined with product control and processing for fish feed applications

...

Awarded: NOK 0.15 mill.

Project Period: 2013-2013

Location: Nordland - Nordlánnda

S-AFRIKA-Program for forskningsamarbeid med Sør- Afrika

Applied Geodynamics: Understanding earth processes using combined physics, chemistry & geology in South Africa and Norway

...

Awarded: NOK 0.42 mill.

Project Period: 2002-2005

Location: Trøndelag - Trööndelage

CGIAR-Internasj. landbruksforskning

Effects of fruit orchards, pesticide use, and landscape structure on disease among disease transmitting mosquitos in Thailand

...

Awarded: NOK 1.4 mill.

Project Period: 2003-2005

Location: Akershus

SIP-NHD-Strategiske instituttprogram finansiert av NHD

Multivariable Process Control in High Temperature and High Pressure Environments using Multi Sensor Data Fusion

...

Awarded: NOK 9.6 mill.

Project Period: 2003-2011

Location: Telemark