0 projects

MAROFF-2-Maritim virksomhet og offsh-2

FlexShuttle - Direct Shuttle and Loading

The project goals are to develop and verify Direct Shuttle Loading with the FlexShuttle subject to the following Key Performance Indicators (KPI): - Safety should be equal to or better than existing state of the art Dynamic Positioning (DP) offloading ope rations with reduced risk for collision b...

Awarded: NOK 3.1 mill.

Project Period: 2010-2012

Location: Rogaland

MAROFF-Maritim virksomhet og offshore operasjoner

Concepts for Loading of Oil in Arctic Shallow Waters

...

Awarded: NOK 0.50 mill.

Project Period: 2001-2004

Location: Rogaland