0 projects

IS-RUST-EONR-statsvitenskap

Reiche, Danyel, eon ruhrgas stip statsv kat 3

...

Awarded: NOK 40,000

Project Period: 2008-2008

Location: Ukjent Fylke

IS-BILAT-Mobilitet Norge-USA /Canada

Aerodynamics of bridge cables

This project focuses on bridge cable vibrations due to wind loads, more precisely on dry cable aerodynamics in critical Reynolds number range. The topic is highly relevant for major forthcoming bridges in Norway. The main body of the project consists of an extensive experimental campaign, to b...

Awarded: NOK 0.10 mill.

Project Period: 2008-2008

Location: Rogaland

HAVKYST-Havet og kysten

7 - PhD-exchange for Hilde Cecilie Trannum

At Laboratoire d'Océanologie Biologique de Banyuls there has been developed a new experimental approach to measure sediment reworking rates in two dimensions with a high degree of time resolution. The technique is based on thin aquaria, luminophores, time lapse photography and image analysis. We...

Awarded: NOK 0.11 mill.

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Biopolymer based functional materials for enhanced absorption and barrier properties

...

Awarded: NOK 34,999

Project Period: 2008-2008

Location: Oslo

HAVBRUKS-Havbruk - en næring i vekst

Sjømatkonferansen 2008 21. oktober 2008. Bergen Scandic city

Sjømatkonferansen er en del av formidlingsprosjektet Sjømat for alle som består forskningsformidling ut mot publikum og opplæring av barn og ungdom. Sjømatkonferansen har blitt opparbeidet gjennom syv år og har et vellykket samarbeid med kompetansemiljø ene i regionen. Programkomiteen ledes av ...

Awarded: NOK 59,999

Project Period: 2008-2008

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Novel catalytic nano-materials for the anode of the direct formic acid fuel cell

...

Awarded: NOK 15,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

MINimising the Impacts of Manufacturing And Logistics regarding CO2

...

Awarded: NOK 0.17 mill.

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

NATURNAER-Natur og næring

Økonomisk støtte til gjennomføring av en europeisk skog og helsekonferanse i perioden 27.-29.8.2008 - COST E39

...

Awarded: NOK 79,999

Project Period: 2008-2008

Location: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

IMPLEMENTATION OF 'GREEN TECHNOLOGIES' FOR WASTEWATER TREATMENT IN SMALL COMMUNITIES IN BULGARIA

...

Awarded: NOK 33,000

Project Period: 2008-2008

Location: Akershus

BIA-Brukerstyrt innovasjonsarena

Reduksjon av effektforbruk og øket brukervennliget for chiper brukt i medisinsk ultralyd

Målet med prosjektet er å utvikle en ny generasjon chiper for bruk i mottakerkjeden i utstyr for medisinsk ultralyd. Kritiske faktorer i disse systemene er effektforbruk og kompleksitet. Dette har blitt vesentlig viktigere de siste årene ettersom disse sy stemene har blitt gjort mindre i fysisk s...

Awarded: NOK 8.9 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

PES-EØS-Prosjektetablererstøtte EØS-området

Conserving and enhancing Cultural Heritage of the Island of Naxos

...

Awarded: NOK 50,000

Project Period: 2008-2008

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Nettverk for bedre samspill og dataflyt mellom ulike aktører i bygg og anleggsbransjen. Fokus på felles digitale datamodeller 3d,4d,BIM,GIS

BA-Nettverket ledes av Inger Hokstad AS (siden 2003). Vi har hovedfokus på samferdsel- og infrastruktur-prosjekter, og barriærer som har vært til hinder for å kunne jobbe tidsriktig med 3D-informasjonsmmodeller/BIM. Vi har satt oss grundig inn i sta tus, muligheter og hindere hos ulike aktører...

Awarded: NOK 1.2 mill.

Project Period: 2008-2013

Location: Akershus

PES-EØS-Prosjektetablererstøtte EØS-området

Improvement of the structures and efficiency of small horizontal axis wind generation with non-regulated blades

...

Awarded: NOK 95,000

Project Period: 2008-2008

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Synergy of networks along Pan European Corridors 4,7,8,9b : towards breakethrough in EurAsian landbridge deployment.

...

Awarded: NOK 49,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Development of a novel technology for performing efficient Ecological cleaning of running conveyors, with minimized belt cross-contamination

...

Awarded: NOK 19,999

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Development of ecological friendly coating and finishing formulations.

...

Awarded: NOK 29,999

Project Period: 2008-2008

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

The ART of mass production of high quality COPepod eggs for juvenile production

...

Awarded: NOK 89,999

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Handheld Information SPaces

...

Awarded: NOK 29,999

Project Period: 2008-2008

Location: Vestland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Efficient SUBSEA deployment and recovery of smaller objects, dataloggers in particular

...

Awarded: NOK 0.20 mill.

Project Period: 2008-2011

Location: Akershus

MILPAAHEL-Miljøpåvirkning og helse

Type 1 Diabetes and the Hygiene Hypothesis (helminths and parasites, and symptomatic virus infections)

Type 1 Diabetes (T1D) is one of the most prevalent chronic diseases with childhood onset. The incidence of T1D has increased with 25% during the last three years, and threefold during the last generation. The disease has a multifactorial aetiology and app ears after a long period where the immune...

Awarded: NOK 3.0 mill.

Project Period: 2008-2011

Location: Oslo

MILPAAHEL-Miljøpåvirkning og helse

Toxicological characterization of selected secondary fungal metabolites in Norwegian grain

Grains are commonly infected with toxigenic fungi, particularly with species of the Fusarium and Alternaria genera. Fusarium fungi are producers of a range of well known mycotoxins as well as less known bioactive metabolites for which little toxicological information exists. Food and feed contai...

Awarded: NOK 3.1 mill.

Project Period: 2008-2012

Location: Akershus

MILPAAHEL-Miljøpåvirkning og helse

Environmental exposure to phthalates and Bisphenol A and the development of diabetes and asthma - an in vivo and in vitro study

Asthma, allergy and diabetes increased during the last decades. These diseases are caused by dysfunction of the immune system. Diabetes and allergic diseases could share common underlying immunological mechanisms and environmental causes. Our hypothesis i s that the two groups of chemicals, phtha...

Awarded: NOK 4.7 mill.

Project Period: 2008-2013

Location: Oslo

BIONÆR-Bionæringsprogram

Improved potato quality by reduced skin blemish diseases (scab and scurf) in Norwegian potato production

The project aims to improve the control of skin blemish diseases on potato in Norway. Potato has approx annually a wholesale value of NOK 500,000,000. Skin blemish diseases (scurf and scab) have become an increasing problem in Norway, mainly for the fre sh marked potato. The quality problem is ...

Awarded: NOK 8.3 mill.

Project Period: 2008-2013

Location: Akershus

ENERGIX-Stort program energi

End Use of Photovoltaic Technology in Norway

The overall objective of this project is to investigate the hypothesis that "solar electricity is a viable alternative even in Norway". Because of the project, we will know more about under what assumptions this is true, or - conversely - why the hypothes is is false. This will be achieved throug...

Awarded: NOK 6.2 mill.

Project Period: 2008-2013

Location: Agder

FRIMEDBIO-Fri prosj.st. med.,helse,biol

Receptors controlling the innate immune system

Myeloid cells are activated quickly at the start of an immune response and play a central role in the orchestration of the secondary, adaptive immune response. The adaptive response is influenced both indirectly, through the secretion of cytokines that re gulate the type of immune response genera...

Awarded: NOK 3.2 mill.

Project Period: 2008-2012

Location: Oslo

FRINAT-Matematikk og naturvitenskap

Precise analysis of mass movements through correlation of repeat images (CORRIA)

Slow mass movements such as ice flow, landslides, rock mass instabilities, rockglacier creep, or solifluction are fundamental earth surface processes. Quantification and monitoring of surface velocity fields on these features is a crucial prerequisite for process understanding, numerical modelli...

Awarded: NOK 4.4 mill.

Project Period: 2008-2011

Location: Oslo

FRIMEDBIO-Fri prosj.st. med.,helse,biol

Molecular characterization of breast cancer: Combined genomics, metabolomics and MR imaging

Breast cancer has the highest incidence and mortality of all malignant diseases among women globally. The heterogeneous nature of breast cancer results in different clinical presentations and outcomes, and patients show a diverse range of responses to a g iven treatment. Processes leading to more...

Awarded: NOK 4.9 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

PSYKISK-Psykisk helse

Long term effects of early intervention in psychosis: Ten year follow-up of the TIPS study.

Mental illness is now the largest cause of disability in the developed countries, and schizophrenia is ranked among the leading causes of the total burden of disease worldwide. In addition to personal suffering, the disorder also represents a major proble m to society In spite of more than 75 000...

Awarded: NOK 1.9 mill.

Project Period: 2008-2011

Location: Oslo

FRIMEDBIO-Fri prosj.st. med.,helse,biol

Measuring Genetic Mating Systems and Sexual Selection Using a Sex-Role Reversed Pipefish.

Summary The interaction between molecular biology and animal behaviour has sparked a new understanding of mating systems and sexual selection. However, controversies remain, and at least ten different mating system metrics have been advocated to best meas ure patterns of mating. One aim of this p...

Awarded: NOK 4.0 mill.

Project Period: 2008-2012

Location: Trøndelag - Trööndelage

IS-RUOK-EONR-økonomi

Groh, Andreas Lind eon ruhrgas øk 08 kat 1

...

Awarded: NOK 35,000

Project Period: 2008-2008

Location: Ukjent Fylke