0 projects

PES-HORISONT-EU-PES Horisont Europa

Enhancing European Battery Chain Sustainability

The tasks mainly are office-based activities and meetings with the consortium coordinator, partners and consultancy company.

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Resource efficiency breakthroughs for industrial processes

Brief description of what will be done in the PES project (3–4 lines): In the PES project, we will develop a single stage EU project proposal for submission to the call Topic HORIZON-CL4-2024-TWIN-TRANSITION-01-41 Breakthroughs to improve process industry resource efficiency (Processes4Planet pa...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo

GRØNNPLATTFORM-Grønn plattform

GreenBox - a flagship project for the green transistion of the process industry

GreenBox skal digitalisere fremtidens grønne fabrikk, og skal gi grunnlaget for oppgraderinger og nyetableringer i prosessindustrien.? Prosessindustriens mål er å redusere CO2 utslippene med 35% innen 2030 og til null innen 2050. Samtidig skal verdiskapningen økes for å sikre fremtidig lønnsomme ...

Awarded: NOK 41.7 mill.

Project Period: 2024-2026

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

ValidAI Clinical VALIDation and implementation of the AI-based digital biomarker Histotype Px to personalize treatment in colorectal cancer

Kolorektal kreft er den tredje vanligste og den nest mest dødelige kreften globalt, med omtrent 2 millioner nye tilfeller og 0,9 millioner dødsfall hvert år. Det for øyeblikket ingen pålitelige verktøy for å veilede beslutningen om å gi kjemoterapi eller ikke etter operasjon i stadium 2 og stadiu...

Awarded: NOK 16.0 mill.

Project Period: 2024-2027

Location: Oslo

ENERGIX-Stort program energi

Avansert Silisium-Anode-Produkt med Resirkulering

ASAP-Resirkulering Bedre og billigere Li-ion-batterier gir stadig mindre utslipp i transportsektoren. En av de viktigste forbedringene bransjen venter på, er å erstatte grafitten i batteriet med silisium. Dette vil gi økt energitetthet, lavere pris, og redusert CO2-avtrykk. Cenate er en av få be...

Awarded: NOK 18.0 mill.

Project Period: 2024-2025

Location: Østfold

FINANSMARK-Finansmarkedet

Taxing the Rich: The Trade-offs of Redistribution.

Inntektsulikhet er en økende bekymring for økonomer, politikere og beslutningstakere. På den ene siden kan et progressivt skattesystem redusere inntekts- og formuesulikhet, noe som er velferdsforbedrende. På den andre siden påvirker det også arbeids- og investeringsbeslutninger og skaper sosiale ...

Awarded: NOK 2.0 mill.

Project Period: 2024-2027

Location: Oslo

FORNY20-FORNY2020

A novel treatment of glioblastoma

Vi skal i dette prosjektet utvikle en ny form for nanoterapi til behandling av hjernekreft. Glioblastoma multiforme er en av de vanligste hjernekreftformene hos barn og voksne, og den dødeligste av alle kreftformer. Det eksisterer svært få behandlingsalternativer, og ingen er kurative. Immunterap...

Awarded: NOK 0.50 mill.

Project Period: 2024-2024

Location: Oslo

JPIURBAN-Urban Europe

Just in a Minute

Dette prosjektet er ett av flere finansiert under Driving Urban Transitions-programmet til Urban Europe-samarbeidet som fokuserer på 15 Minute City (15mC). 15mC bygger på ideen om at burde og byene våre kan planlegges slik at en kan reise til aktiviteter innen 15 minutter ved å kunne velge å gå, ...

Awarded: NOK 2.5 mill.

Project Period: 2024-2026

Location: Møre og Romsdal

DEMO2000-Prosj.ret tekn.utv. petro.virk

Videreutvikling av teknologi for bedre undergrunnsforståelse og innsamling av data for mer effektive boreoperasjoner

Ved boring av brønner innen Petroleum er det viktig å forstå egenskapene til bergformasjonen slik at brønnens integritet kan vedlikeholdes. Slik undergrunns forståelse er også viktig for andre formål, som for eksempel når man skal avstenge brønner permanent. QWave har utviklet en ny teknologi f...

Awarded: NOK 5.3 mill.

Project Period: 2024-2026

Location: Rogaland

MAROFF-2-Maritim virksomhet og offsh-2

Pulse-jet propulsion for commercial ships

Et nytt fremdriftssystem inspirert av svømmeteknikken til blekkspruter og maneter kan føre til betydelig redusert drivstofforbruk og CO2 utslipp for moderne skip. Disse dyrene beveger seg fremover ved å først suge vann inn i et hulrom i kroppen for deretter presse det ut med høyere hastighet. Re...

Awarded: NOK 6.4 mill.

Project Period: 2024-2027

Location: Buskerud

KLIMAFORSK-Stort program klima

Democratic Innovations for the Age of Climate Change

The 2024 Arne Næss symposium features David Van Reybrouck, one of the most exciting Belgian historians, writers and climate activists. Van Reybrouck is an internationally acclaimed author of Congo: The Epic History of a People, which won 19 prizes and has been translated into a dozen languages. ...

Awarded: NOK 0.15 mill.

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Contera - EU prosjektforslag til Widera-2024-ERA-01-08

The project activities include planning, coordination, drafting, validating, and submitting a highly qualified application within the deadline of 12.3.2024. Correlate NO Digital collaboration Ponteditora Publishing House PT Publishing University of Madeira PT Management; Entreprene...

Awarded: NOK 0.20 mill.

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

SHARE - Strategic Funding Assistance and Resource Engine

The SHARE project aims to revolutionize the grant application process for startups and growth companies. It involves the development of an AI-enhanced, user-friendly system that will streamline the entire process of scouting for grants, creating projects, forming consortia, and writing applicatio...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Oslo

BIONÆR-Bionæringsprogram

HESTEFORSK Improving technical riding skills through unmounted training – an unexplored opportunity for better performance and horse welfare

Horseback riding presents a significant neuromotor control challenge, requiring postural stability, balance and precise communication with the horse. Postural asymmetries are common in riders. While balance is extremely trainable if using frequent repetition with high precision, unmounted trainin...

Awarded: NOK 1.8 mill.

Project Period: 2024-2026

Location: Akershus

BIONÆR-Bionæringsprogram

HESTEFORSK EHV-1 in Sweden and Norway

Several outbreaks of the neurological form of EHV-1 (equine herpesvirus type 1) infection have gained attention in Europe and North America. EHV-1 is a serious threat to horse health and the horse industry. It causes disease, suffering and economic losses through respiratory signs, abortions, foa...

Awarded: NOK 1.8 mill.

Project Period: 2024-2026

Location: Akershus

BIONÆR-Bionæringsprogram

HESTEORSK Inbreeding depression in Coldblooded trotters – cold truths on a hot topic

Norwegian-Swedish Coldblooded trotters are successfully bred for trotting performance. Intense use of popular stallions has led to a rapid increase in relatedness and inbreeding, and an effective population size of around 50. This implies a risk of inbreeding depression and previous studies showe...

Awarded: NOK 1.2 mill.

Project Period: 2024-2026

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

GrønnPuls: Digitalt visualiseringsverktøy for måling og rapportering av bærekraft i verdikjeden

Prosjektet GrønnPuls har som mål å utvikle en effektiv metode og et digitalt verktøy for å innhente, analysere og dele bærekraftsinformasjon i energisektoren. Prosjektpartnerne inkluderer entreprenørselskapet Compera, Equinor og Interwells leverandørkjeder, revisjonsselskapene Zirkel og Ecoxy, sa...

Awarded: NOK 2.9 mill.

Project Period: 2024-2026

Location: Rogaland

MARINFORSKFISK-Marine ressurser og miljø - fiskeri

Utvikling av havteine for konkurransedyktig og miljøvennlig fangst av reker

Prosjektets overordnede ide er å utvikle en teine for bærekraftig og miljøeffektiv havfiske etter dyphavsreker (Pandalus borealis). Dyphavsreker er den viktigste skalldyrressursen i Nord-Atlanteren med landinger på cirka 200 000 tonn per år og en av de kommersielt viktigste krepsdyrartene i Norge...

Awarded: NOK 4.4 mill.

Project Period: 2024-2026

Location: Møre og Romsdal

ENERGIX-Stort program energi

From Wafer to Module: Cost-Effective High-Efficiency Silicon Technologies

In the WaMTec project, an ingot/wafer and a module manufacturer, as well as equipment manufacturers and research institutes are joining forces to reduce the manufacturing costs of solar cells with Tunnel Oxide Passivating Contact (TOPCon). The goal is to increase the technology maturity of TOPCon...

Awarded: NOK 2.6 mill.

Project Period: 2024-2026

Location: Oslo

STIPINST-Stipendiatstillinger i instituttsektoren

Predicting intense marine heatwaves in northern seas (PRIMA)

...

Awarded: NOK 4.5 mill.

Project Period: 2024-2026

Location: Vestland

FINANSMARK-Finansmarkedet

Gender Gaps in Credit Access and Womens Entrepreneurial Choices

Gründervirksomhet er en nøkkelfaktor for økonomisk vekst. Gründere i etableringsfasen opplever ofte manglende tilgang til finansiering som gjør det utfordrende å realisere potensialet og skape økonomisk vekst. En faktor som i denne sammenhengen har fått stor oppmerksomhet er kjønnsspesifikke økon...

Awarded: NOK 2.4 mill.

Project Period: 2024-2027

Location: Oslo

MARINFORSKFISK-Marine ressurser og miljø - fiskeri

Norbait II

Teine- og linefiske er skånsomt mot havbunnen, målrettet i forhold til art/størrelse og er således både miljøvennlig og fremmer et bærekraftig fiskeri. Det er samtidig etisk betenkelig at konsumfisk som makrell, sild og akkar nærmest er enerådende som agn. Prosjektet vil derfor ta i bruk restråst...

Awarded: NOK 3.4 mill.

Project Period: 2024-2026

Location: Vestland

ENERGIX-Stort program energi

SnowInflow: Optimized inflow forecast for the snowmelt period

Norsk vannkraft spiller en avgjørende rolle i det nordiske energisystemet ved å balansere produksjonen av variabel fornybar energi i Nord-Europa. Omtrent halvparten av tilsig til norske vannkraftverk kommer fra snøsmelting. Imidlertid forblir optimal styring av reservoarene under den kritiske snø...

Awarded: NOK 12.6 mill.

Project Period: 2024-2027

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Devi8 - Virtual Production

Virtuell Produksjon (VP) smelter sammen fysiske og digitale verdener, slik at interaksjon med virtuelle miljøer kan skje i sanntid. Denne nyskapende teknologien har forandret filmproduksjon da det reduserer behovet for det tids- og kostnadskrevende etterarbeidet som er vanlig praksis med tradisjo...

Awarded: NOK 12.5 mill.

Project Period: 2024-2026

Location: Østfold

DEMO2000-Prosj.ret tekn.utv. petro.virk

T-3000 - Thru-tubing, riggløs plugging av brønner med Bismuth Alloy (M3)

Mer enn 2500 brønner bare på norsk kontinentalsokkel skal plugges i årene som kommer. Dagens metoder innebærer plugging fra rigg og svært høye kostnader. Prosjektet omhandler utvikling og demonstrasjon av en ny metode for permanent plugging av brønner fra rigg eller fartøy ved anvendelse av det k...

Awarded: NOK 12.0 mill.

Project Period: 2024-2026

Location: Rogaland

NAERINGSPH-Nærings-phd

FRAMO - Aquastream2

Norsk lakseoppdrett står overfor betydelige utfordringer, inkludert lakselus, infeksjoner, og forurensing i form av slam og fôr fra åpne sjømerder. Disse problemene har bremset markedets vekst. Utvikling av nye metoder for fiskeoppdrett er avgjørende, men potensialet i å forbedre eksisterende åpn...

Awarded: NOK 2.0 mill.

Project Period: 2024-2027

Location: Vestland

NAERINGSPH-Nærings-phd

Computational studies on the impact of electrochemical pre-lithiation process on cell production

Beyonder is developing energy storage devices for industrial applications which require higher power and high cycle life than what commercially available lithium-ion batteries (LiB) can supply. Beyonder has developed a novel, patented pre-lithiation processes that increase the energy and power de...

Awarded: NOK 2.0 mill.

Project Period: 2024-2026

Location: Rogaland

BIOTEK2021-Bioteknologi for verdiskaping

Development of an optimized microbial strain for direct conversion of CO2 into biomass for feed production

Produksjonen av laks i Norge er knyttet til bruk av soya som en viktig ingrediens. Dyrking av soya er i en del sammenhenger koplet avskoging i Brasils Amazonas-regnskog. Amazonas er avgjørende for jordas resirkulering av karbon som binder enorme mengder karbon og er derfor viktig for den totale k...

Awarded: NOK 3.5 mill.

Project Period: 2024-2026

Location: Rogaland

BIA-Brukerstyrt innovasjonsarena

AltGreen - Triggering green decision-making

Global oppvarming utgjør en betydelig trussel over hele verden, og Norge, med sine høye CO2-utslipp, er intet unntak. Den gjennomsnittlige nordmannens karbonavtrykk er 45% høyere enn det europeiske gjennomsnittet, og landet har bare klart en 1% reduksjon i utslipp siden 1990, sammenlignet med EUs...

Awarded: NOK 16.0 mill.

Project Period: 2024-2026

Location: Oslo

PETROMAKS2-Stort program petroleum

Teknologi-plattform for deteksjon av giftige gasser

Giftige gasser kan være dødelige selv i svært lave konsentrasjoner, og over tid kan de medføre livstruende sykdommer ved enda lavere konsentrasjoner. Det er derfor viktig å ha gode sensorer som kan detektere disse gassene. Optronics har sammen med SINTEF tatt fram to nye og unike konsepter for d...

Awarded: NOK 10.0 mill.

Project Period: 2024-2025

Location: Oslo