0 projects

SSF-Svalbard Science Forum

Holocene environmental change of Svalbard

We will analyse the Holocene environmental history in Kongsfjorden since deglaciation. At least three Ny-Ålesund flagships have identified the need for long-term climate records. Up to date no integrated temperature, precipitation or glacial variability r ecord exists for the entire Holocene for ...

Awarded: NOK 0.40 mill.

Project Period: 2014-2015

Location: Svalbard

SSF-Svalbard Science Forum

Lunar Arctic-coordinated remote sensing of aerosols: LUNAR photometry close the gap in ARCTIC aerosol climatology and satellite validation

In the context of a rapidly changing environment, collaborative efforts are essential to understand and to mitigate agents that contribute to modifications in the polar regions. Arctic aerosols have been studied intensively since many year. Nevertheless, there remain recognized deficiencies in A...

Awarded: NOK 0.40 mill.

Project Period: 2014-2016

Location: Akershus

TRANSPORT-Transport 2025

Work-related accidents in road, sea and air transport: prevalence, causes and measures

Førere i arbeid er involvert i mange av transportulykkene i Norge. Transportorganisasjoner er ifølge Arbeidsmiljøloven forpliktet til å fremme transportsikkerhet for sine ansatte gjennom sitt arbeid med helse, miljø og sikkerhet (HMS). Vi har imidlertid hatt lite om sammenhengene mellom transport...

Awarded: NOK 3.7 mill.

Project Period: 2014-2017

Location: Oslo

SSF-Svalbard Science Forum

Reconstruction of past atmospheric circulation patterns along the coast of Norway and Svalbard during the last 2000 years

In order to distinguish the temporal-spatial effects of anthropologically induced changes on the climate system, there is an urgent need for better quantification of natural climate variability. This variability is controlled by the interaction between th e forcing and internal processes of the c...

Awarded: NOK 45,999

Project Period: 2014-2014

Location: Vestland

SSF-Svalbard Science Forum

Calving and Surging Glaciers: Observations, Modelling, Predictions

Calving and surging are both complex dynamic phenomena that exert strong controls of the flux of ice into the oceans. Calving - the breakaway of icebergs from glaciers into the sea - accounts for a large proportion of ice flux from Arctic glaciers and the Greenland and Antarctic ice sheets, and ...

Awarded: NOK 0.17 mill.

Project Period: 2014-2015

Location: Svalbard

SSF-Svalbard Science Forum

Snow Monitoring using Automatic Camera Systems at Svalbard Key Sites

On Svalbard, the long-lasting snow cover and the timing of the snowmelt is a crucial factor in the yearly cycle of all land ecosystems. SMACS will explore monitoring of the snow cover and snow melt from the point to a scale of several square kilometers at the Svalbard key research locations Ny-Å...

Awarded: NOK 0.32 mill.

Project Period: 2014-2015

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

PostMaster

The overall objective of the PostMaster project is to develop and test an innovative and durable electric three-wheeled scooter that will provide an effective solution for green urban transport in EU. The project is responding to a growing demand from cit ies across EU to replace heavy-duty vehic...

Awarded: NOK 59,999

Project Period: 2014-2015

Location: Trøndelag - Trööndelage

PES2020-Prosj.etabl.støtte H2020

High Throughput Estimation of DNA Repair Capability

Project to be established: Developing a novel diagnostic tool for assessing DNA repair capability. DNA repair is a crucially important player in preventing mutations and therefore cancer. It is also important as a factor in determining individual patients ' response to cancer therapy. We will dev...

Awarded: NOK 21,219

Project Period: 2014-2014

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Innovativ Kraft - konkurransekraft gjennom delte kapabiliteter

Innovativ Kraft har med utgangspunkt i den enkelte bedrifts innovasjonsprosesser og kapabiliteter, utviklet løsninger som gir økt tilgang til ressurser, competanse, utstyr etc, og kompetanse i disse prosessene. Dette inkluderer også løsninger for mer faktabaserte utviklingsprosesser. Dette ha...

Awarded: NOK 8.3 mill.

Project Period: 2014-2018

Location: Agder

PES2020-Prosj.etabl.støtte H2020

Incentivized Sustainable Mobility

ISUMO is a SaaS-Cloud-based platform which enhance Sustainable Mobility Soultions. It introduces an innovative incentive-based cooperative business model as a platform that builds on registering, evaluating and rewarding a set of topic-related Sustainable Mobility ITS involving 3 stakeholders: c...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Kjedet flytebru

I forbindelse med lansering av ferjefri E39 vil kryssing av brede fjorder med flytebru være et aktuelt alternativ til ferje. En flytebru skal stå i mot sidekrefter fra bølger, vind og strøm. For å håndtere påkjenninger fra disse miljølastene er tradisjonelle flytebruer utformet som stivekonstruks...

Awarded: NOK 2.0 mill.

Project Period: 2014-2017

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Søker å etablere et prosjekt for tekstgjenkjenning (OCR) av historiske dokumenter med bruk av adaptiv gjenkjenning og datalingvistikk.

Lumex har gjennom mange år utviklet avansert OCR-teknologi med spesiell fokus på dokumenter som er vanskelige å gjenkjenne. Teknologien dekker alle ledd av gjenkjenningen fra preprosessering av bilder, adaptiv gjenkjenning og avansert bruk av ordboksoppsl ag for å bedre gjenkjenningen. Lumex har...

Awarded: NOK 0.14 mill.

Project Period: 2014-2014

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

High Accuracy Motion Reference Unit HA-MRU

Forprosjektet vil ta utgangspunkt i et eksisterende «motion reference» elektronisk kort som er utviklet av vår samarbeidspartner Egersund Maritime Electronics (EME). Se vedlegg 1. EME sin kompetanse innen fagområdet er et viktig bidrag. Det andre utgangs punktet er Action Technologies (AT) sin p...

Awarded: NOK 0.10 mill.

Project Period: 2014-2014

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Utvikle en ny generasjon passiv varmeveksler for oljeindubasert på naturlig konveksjon.

Subsea varmevekslere er viktige bestanddeler av subsea gasskompresjonsmoduler og andre prosessmoduler og produksjonssystemer subsea. Varmeveksler/kjøler brukes bl.a. for å kjøle olje, samt ifm. gasskompresjon for å kjøle ned utgående gass når designtemper atur overskrides. Det er stor etterspørse...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Vestfold

PES2020-Prosj.etabl.støtte H2020

Linking bioeconomy, biodiversity, ecosystem functions and ecosystem services by using ecological, social and economic Sciences

We are approaching the sixth mass extinction where we expect to lose more than 75% of all species, but within only a few hundred years. As a response to these threats there has been developed EU strategies to sustain biodiversity for future ecosystem serv ices and ecosystem functions. There is go...

Awarded: NOK 0.13 mill.

Project Period: 2014-2014

Location: Innlandet

PES2020-Prosj.etabl.støtte H2020

PES Eurostars for R&D of an insurance assessment solution securing cost efficient remote claims-, underwriting- and actuary estimates.

The Eurostars call will close March 13th. The main project (if successful application) is expected to run over 24 months and AnsuR's share is anticipated to be approximately 48 months of effort. This PES shall cover expenses for preparing the applicatio n and use of professional assistance from...

Awarded: NOK 0.15 mill.

Project Period: 2014-2014

Location: Akershus

NANO2021-Nanoteknologi og nye materiale

Forskningsseminar: Recent advances in cellulose nanotechnology research - Production, characterization and applications

Seminaret avholdes i regi av Papir- og fiberinstituttet AS (PFI) i Trondheim, og det er femte gang det arrangeres. Seminaret organiseres av seniorforsker Kristin Syverud (se vedlegg for CV), og omhandler nanocellulose, med fokus på produksjon, karakterise ring og anvendelse. Representanter fra bå...

Awarded: NOK 67,999

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

PES2020-Prosj.etabl.støtte H2020

eHR Patways - EPJ løsning for den kommunale helsetjenesten.

eHR Patways - EPJ løsning for den kommunale helsetjenesten for å sikre et helhetlig informasjonsgrunnlag for alle aktører innen helsetjenesten. Basert på predefinerte behandlingslinjer - Pathways.

Awarded: NOK 0.14 mill.

Project Period: 2014-2014

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Forprosjekt - Modellbasert Prediktiv Regulering av Satsvise Prosesser

Det søkes om prosjektetableringsstøtte. Prosjektets formål er å utarbeide og sende inn en søknad til EUs Horizon 2020, H2020?EeB?2014/2015, Call SPIRE1 ? 2014 Integrated Process Control. I konsortiet som søkes etablert, er BASF (D) koordinator. Cybernet ica AS deltar som eneste norske partner. ...

Awarded: NOK 79,999

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

IKTPLUSS-IKT og digital innovasjon

5G-Special Interest Group

The new ETP is the root for the proposed 5G Public-Private-Partnership (PPP) in Horizon 2020. It is important to fully understand the 5G-PPP objectives, structure and mechanisms. Norwegian actors (industrial, institutes, academia) need to account for the European industrial views on 5G technolog...

Awarded: NOK 0.50 mill.

Project Period: 2014-2017

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Concept development and verification of aerated ship hull (ASH) technology for commercial ships

Den maritime sektor søker mer effektive og miljøvennlige skipstyper / konsepter. Det er stor aktivitet i markedet for å komme opp med forbedrede løsninger; og det er store globale økonomi og miljø-effekter forbundet med pågående utvikling. Søker tar denn e utfordringen og vil gjennom Eurostars-p...

Awarded: NOK 69,999

Project Period: 2014-2014

Location: Vestfold

PES2020-Prosj.etabl.støtte H2020

PES - ERC Starting Grant 2014 - Landslide Induced Tsunami HAzard and Loss

Prosjektet forventes å innholde følgende komponenter: Etablering av datagrunnlag for skredgenererte flodbølger fra eksisterende databaser. Denne aktiviteten vil ta for seg innsamling, bearbeiding og statistikk på relevante data fra flodbølgedatabaser, pa leotsunamidatabaser, og skreddatabaser. B...

Awarded: NOK 39,893

Project Period: 2014-2014

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Global Maritime Knowledge Hub seminar in Bergen, 2. April 2014

The Global Maritime Knowledge Hub initiative represents Norway's largest ever private investment in maritime knowledge development, comprising 20 sponsored professorships from 22 different sponsors at seven different Norwegian educational institutions. T he background for the initiative is the o...

Awarded: NOK 50,193

Project Period: 2014-2015

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

H2020-MASC-ITN-ETN ParEssi: Partnership for Enhanced Subsurface Structural Interpretation.

ParESSI is an interdisciplinary network integrating young scientists (Early Stage Researchers) from different disciplines with the ultimate scientific goal to establish a system-wide understanding of subsurface imaging of faults and fractures within a var iety of geological, energy and exploratio...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Akershus

PES2020-Prosj.etabl.støtte H2020

Development of LNG fuel systems for ships using atmospheric LNG fuel tanks integrated in ship hull

Prosjektet vil utvikle en fullt funksjonell LNG drivstoffbasert løsning for skip i kyst og innlandstrafikk. Partnerne i prosjektet vil bli valgt slik at de dekker forsknings og innovasjons utfordringer i prosjektet. De vil tilsammen danne en verdikjede av bedrifter og FoU institusjoner som kan u...

Awarded: NOK 0.20 mill.

Project Period: 2014-2015

Location: Vestfold

SMARTRANS-Næringslivets transp. og ITS

Innovation in Urban Freight International Workshop

The ability to efficiently move freight is critical to the healthy economy of any country. In urban areas in particular, freight mobility faces numerous challenges due to increasing delays because of congestion on roadways, growing concerns about trucks' environmental impacts, conflicts between ...

Awarded: NOK 50,000

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

NAERINGSPH-Nærings-phd

Measurable Security for Sensors in the Internet of People, Things and Services (IoPTS)

Internett og informasjonsteknologi har forandret vår liv i en stor grad. Informasjonstilgang og informasjonshåndtering er kjennetegn til dagens suksessrike bedrifter. Utviklingen som har begynt er at ting eller dingser, dvs. sensorer, mobiler, biler, vaske maskin, varmepumpe, lys og alarm leverer...

Awarded: NOK 1.4 mill.

Project Period: 2014-2018

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Subsea Detection of Corrosion

The principle of operation is based on the fact that modern pipe in pipe oil transport systems, with alternating concentric layers of pipes, insulation and armour are, in electronic terms, co-axial conductors capable of carrying high-frequency electromagn eti signals. The SEADEC apparatus inject...

Awarded: NOK 0.12 mill.

Project Period: 2014-2014

Location: Møre og Romsdal

DEMO2000-Prosj.ret tekn.utv. petro.virk

Testing og industriens vurderinger av ny GeoPlayGround teknologi - Ny teknologi innen leting og produksjon

GeoPlayGround er i en oppbyggingsfase der de initielle aktiviteter gikk ut på å utvikle selve "skjelettet" av systemet med tilhørende nye teknologier. Selskapet startet denne utviklingen i 2010 med å gå fra konsept og ide til en tidlig prototype høsten 20 12. Utviklingen «skjøt fart» med industri...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Rogaland

NAERINGSPH-Nærings-phd

Pre-clinical evaluation of novel product candidates as targeted cancer therapeutics. Specificity, bio-distribution and therapeutic efficacy

Målet med studiene utført i dette Ph.D.-prosjektet har vært å utvikle og teste Oncoinvents nye produktkandidater for behandling av kreft. Den viktigste teknologiske plattformen for utvikling av disse er bruk av radionuklider som kan bestråle kreftceller slik at de enten dør eller slutter å dele s...

Awarded: NOK 2.1 mill.

Project Period: 2014-2019

Location: Oslo