0 projects

PES2020-Prosj.etabl.støtte H2020

Closed Loop Process Control for Integrated Industrial Processes to create measuring of carbon footprint based on online measurement

Establish a Horizon 2020 project under the Call SPIRE-01-2014 - Sustainable process industries - Topic Integrated Process Control. The project will be established in cooperation with Ketek, Finland, Datarangers, Finland, North East of England Process In dustry Cluster, SIRRIS Belgium and selec...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Telemark

PES2020-Prosj.etabl.støtte H2020

Aluminium Components Design Loop Software

The highest level of accuracy in a finite element code is gained by using solid element technology. It is only this modelling condition that can account for multi-axial stress states and then fully take advantage of advanced material models at all scales. However, traditional solid element techn...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Agder

DEMO2000-Prosj.ret tekn.utv. petro.virk

System for plugging og sementering av gamle oljebrønner

I forbindelse med oljeutvinning er det mange oljefelt som er i ferd å bli gamle og som om få år ikke vil være økonomisk drivverdige. Når oljefeltene skal stenges ned og forlates må alle oljebrønner inn i reservoarene plugges forsvarlig. Det er et krav at alle oljebrønner som skal stenges og forl...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Vestfold

DEMO2000-Prosj.ret tekn.utv. petro.virk

Technology Demonstration and Verification for Removal of Sulphate and Salts: SWIT-SUL/SAL from Seawater at the Seabed

This "Forprosjekt" is to pave the way for a larger DEMO2000 project in April - described below: The ability to inject low salinity water into reservoirs has in some cases shown to significantly increase the recovery factor of the oil in place in a reservo ir. The removal of sulphate ions from inj...

Awarded: NOK 99,999

Project Period: 2014-2014

Location: Rogaland

PES2020-Prosj.etabl.støtte H2020

H2020-Smart Neighborhood Markets

Changes in the current retail market for electricity reflect a bottom-up paradigm and perspective change regarding electricity market concepts, placing energy consuming buildings and consumers/prosumers in the center. The project will investigate this par adigm shift and its impact on the future ...

Awarded: NOK 0.37 mill.

Project Period: 2014-2014

Location: Østfold

PES2020-Prosj.etabl.støtte H2020

Activity Based Monitoring of Agronomy with Earth Observation

Det tas det sikte på å etablere prosjekt i utlysningen H2020-EARTH OBSERVATION (EO)-1-2014: New ideas for Earth-relevant space applications. Dette er den første utlysningen i Leadership in enabling and industrial technologies (LEIT) - Space. Planlagt pr osjektform er Research and innovation act...

Awarded: NOK 59,999

Project Period: 2014-2014

Location: Vestland

DEMO2000-Prosj.ret tekn.utv. petro.virk

An advanced software tool for holistic environmental impact assessment that fulfills the needs of integrated management

Når nye områder skal åpnes for olje og gassutvinning er det viktig å kunne forutsi mulige samlede effekter og konsekvenser på marine økosystemer. Vi trenger derfor sofistikerte modeller for å simulere mulige utfall av eventuelle oljeutslipp. Det er spesie lt viktig å kunne si noe om effekter av o...

Awarded: NOK 1.9 mill.

Project Period: 2014-2016

Location: Troms - Romsa - Tromssa

DEMO2000-Prosj.ret tekn.utv. petro.virk

Dreamliner pilot well qualification for Smørbukk Sør application

Fishbones Dreamliner Hovedmålet med prosjektet er å kvalifisere Fishbones Dreamliner teknologien for bruk i Nordsjøen samt internasjonale applikasjoner. Fishbones Dreamliner prosjektet er en videreutvikling av den allerede kommersialiserte teknologien som baseres på jetting. Fishbones Dreamliner...

Awarded: NOK 2.5 mill.

Project Period: 2014-2015

Location: Rogaland

ENERGIX-Stort program energi

A NEW ANALYTIC APPROACH FOR THE GREEN CERTIFICATE MARKET

Det felles Svensk-Norske El-Sertifikatmarkedet trådte i kraft 1. Januar 2012. Dette markedet er Norge og Sveriges sentrale støttemekanisme for å nå de respektive fornybarmålene gitt av EU?s fornybarhetsdirektiv. Målet for markedet er at Norge og Sverige sammen skal øke produksjonen fra fornybar...

Awarded: NOK 1.1 mill.

Project Period: 2014-2015

Location: Oslo

KLIMAFORSK-Stort program klima

Coping with Climate: Assessing Policies for Climate Change Adoption and Transport Sector Mitigation in Indian Cities

CLIMATRANS-prosjektet er et multi-teoretisk og tverrfaglig prosjekt innen samfunnsvitenskap (økonomi, statsvitenskap, sosiologi og planlegging) og naturvitenskap (meteorologi og ingeniørfag). Prosjektets utforming har vært å svare på prosjektets mål; å vurdere klimaendringer og miljøpåvirkning kn...

Awarded: NOK 6.9 mill.

Project Period: 2014-2019

Location: Oslo

TRANSPORT-Transport 2025

Unregistered Transport - Mobility, Safety and new Technologies

Det er lite kunnskap om trafikkomfang og ulykker når det gjelder fritidsaktiviteter i Norge. Hvor mye folk går, sykler, kjører båt, snøscooter osv. vet vi lite om. Grunnen er at mye av denne aktiviteten ikke trenger formell godkjenning gjennom førerkort osv. Det er dermed lite systematisk registr...

Awarded: NOK 3.7 mill.

Project Period: 2014-2017

Location: Oslo

ENERGIX-Stort program energi

FCH JU High temperature electrolyser with novel proton ceramic tubular modules of superior efficiency, robustness, and lifetime economy

High temperature electrolysers produce H2 efficiently utilising electricity from renewable sources and steam from solar, geothermal, or nuclear plants. CO2 can be co-electrolysed to produce syngas and fuels. The traditional solid oxide electrolyser cell (SOEC) produces wet H2 at the steam side. E...

Awarded: NOK 2.8 mill.

Project Period: 2014-2018

Location: Oslo

ENERGIX-Stort program energi

FCH JU High temperature electrolyser with novel proton ceramic tubular modules of superior efficiency, robustness, and lifetime economy

High temperature electrolysers produce H2 efficiently utilising electricity from renewable sources and steam from solar, geothermal, or nuclear plants. CO2 can be co-electrolysed to produce syngas and fuels. The traditional solid oxide electrolyser cell (SOEC) produces wet H2 at the steam side. E...

Awarded: NOK 2.7 mill.

Project Period: 2014-2017

Location: Trøndelag - Trööndelage

PES2020-Prosj.etabl.støtte H2020

PES GEO GNSS driven EO and Verifiable Image and Sensor Integration for mission-critical Operational Networks

The project submission deadline is 2014-04-03. The main type of call is Innvation Action (IA). This PES shall cover expenses of submitting the application. Most costs will be hours, but travel may also be required to align the partners/application. In t he event of successful application, AnsuR...

Awarded: NOK 0.30 mill.

Project Period: 2014-2015

Location: Akershus

SSF-Svalbard Science Forum

Diving ecology and migration of a capital breeder, the common eider

The aim of this project is to investigate how migration and seasonal conditions affect the diving and foraging ecology of the common eider. Especially, it will focus on how day-length and temperature affects the diving frequency and the diving depth at di fferent times of the year, while being lo...

Awarded: NOK 79,999

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

SSF-Svalbard Science Forum

WINter Benthic Activities

The goal of the present study is to characterize benthic communities' structure and activities during the polar night in Kongsfjorden, a fjord highly influenced by warm Atlantic water inputs, and to contrast them with the results observed for other season s in the same fjord.

Awarded: NOK 69,999

Project Period: 2014-2015

Location: Troms - Romsa - Tromssa

SSF-Svalbard Science Forum

Hydrological and speleological investigations on Austre Brøggerbreen, RiS ID 6570

Speleological mapping (winter) and dGPS mapping and dye tracing (summer) to investigate differences in morphology and velocity of a supraglacial and englacial drainage system. The data will be compared with previous mappings and dye tracings to see how th e channels have evolved the last decade.

Awarded: NOK 60,999

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

SSF-Svalbard Science Forum

Jan Mayen - A multi approach study on Holocene environmental and climatic changes

Based on field work (Quaternary geology) in Jan Mayen, the project will provide new knowledge on climate and environmental changes in a terrestrial key area in between two main ocean current systems; cold Arctic water from the East Greenland Current/Jan M ayen Current and warm Atlantic water from...

Awarded: NOK 31,474

Project Period: 2014-2015

Location: Trøndelag - Trööndelage

SSF-Svalbard Science Forum

Levels and effects of POPs on thyroid hormone levels in glaucous gull (Larus hyperboreus) breeding in Kongsfjorden, Svalbard, RiS-ID: 6672

The aim of the study is to detect levels of selected POPs in glaucous gull breeding in Kongsfjorden, Svalbard, and investigated how this may affect the thyroid hormone levels.Its hypothesized that high levels of contaminants will be detected and that ther e will be an inverse correlation between ...

Awarded: NOK 20,697

Project Period: 2014-2015

Location: Trøndelag - Trööndelage

BIONÆR-Bionæringsprogram

Silent Timber Buildings for the European market

*

Awarded: NOK 2.3 mill.

Project Period: 2014-2017

Location: Oslo

IS-RUOK-EONR-økonomi

Ownership type, performance and the context: the study of institutional and industrial owners

In the joint research project we try to answer the question, which was in the loop of academic research during the last 50 years both in finance and strategic management literature: how ownership type influences the performance of the organization. The pr evious empirical evidence provided inconc...

Awarded: NOK 61,000

Project Period: 2014-2014

Location: Ukjent Fylke

IS-RUOK-EONR-økonomi

E.ON Ruhrgas personal mobility grant

Please find my motivation letter attached

Awarded: NOK 35,000

Project Period: 2014-2014

Location: Ukjent Fylke

SSF-Svalbard Science Forum

Nest microclimate variation and reproductive success in Common Eider (Somateria mollissima), RiS ID 361

A good understanding of the consequences of climate change on Arctic species demography and populations dynamics is of paramount importance and urgently needed. Climatic conditions during breeding may affect reproductive output and/or breeder condition wi th potential long term consequences on th...

Awarded: NOK 58,986

Project Period: 2014-2015

Location: Trøndelag - Trööndelage

SSF-Svalbard Science Forum

Spatial variability of snow and avalanche conditions along a climatic gradient in Central Spitsbergen

This project will study the regional variability of snow conditions around Longyearbyen and how the regional conditions influence snow avalanche potentials. The fieldwork will run over one winter season (January to May, 2014) and will be the basis for an MSc thesis in Physical Geography. System...

Awarded: NOK 12,999

Project Period: 2014-2015

Location: Svalbard

SSF-Svalbard Science Forum

Estimating uncertainties and sources of error in population monitoring of the Svalbard reindeer (Rangifer tarandus platyrhynchus)RiS : 6188

Monitoring population dynamics of wild ungulates relies on accurate estimates of population size and vital rates. However, errors in population monitoring methods can be numerous (e.g. lack of repeated measurement, sampling time period, observer bias etc. ) and in most studies they are not invest...

Awarded: NOK 20,999

Project Period: 2014-2014

Location: Troms - Romsa - Tromssa

SSF-Svalbard Science Forum

Layer parallel shortening and cataclastic flow by fractures in the Permian Kapp Starostin Formation, Mediumfjellet, Spitsbergen

The thesis addresses three fundamental questions related to fold-thrust belts of relevance to reservoir and cap rock studies; i. Can a link between LPS and small-scale fracture systems reflecting folding of layers by cataclastic flow (in line with Ismat and Mitra, 2005) within a pseudo-mechani...

Awarded: NOK 31,600

Project Period: 2014-2015

Location: Svalbard

ENERGIX-Stort program energi

Kongsberg on-line Wake model

Kongsberg Digital, Renewables & Utilities, utvikler nå et nytt system for styring og overvåkning av vindparker. Systemet inneholder moduler for tilstandsovervåkning, produksjons-planlegging, overordnet styring av parken og annen driftsstøtte-funksjonalitet. Kongsbergs mål er å komme inn på det...

Awarded: NOK 4.9 mill.

Project Period: 2014-2017

Location: Akershus

SSF-Svalbard Science Forum

Effects of pollution on metabolic rate and blood parameters in arctic kittiwake. RiS ID: 6617

The current proposal aims to study the physiological effects (both in terms of metabolic rate, endocrine and clinical parameters) of emerging flame retardants, traditional persistent organic pollutants and toxic metals in the light of ecological character istics (diet, habitat) and environmental ...

Awarded: NOK 71,999

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

VAM-Velferd, arbeid og migrasjon

Nordic Migration Research - nordisk forskernettverk

Forskningsområdet som omfatter internasjonal migrasjon, etniske relasjoner, transnasjonale nettverk, diskriminering, deltakelse i utdannings- og arbeidsmarkedet, medborgerskap, kultur, religion og menneskerettigheter har i de senere årene fått økt oppmerk somhet og betydning i Europa. Dette er et...

Awarded: NOK 41,999

Project Period: 2014-2014

Location: Oslo

SSF-Svalbard Science Forum

Unraveling Holocene Arctic climate dynamics using sediments from Hajeren, a glacier-fed lake on Mitrahalvøya (RiS ID 6663)

The Arctic shows an amplified response to current warming and is rapidly changing. Data on past polar climate variability is scarce and hampered by a low resolution. My PhD research aims to provide high-resolution data for the Holocene to put current warm ing into perspective. To this end, I anal...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Vestland