0 projects

IS-JSPS-JSPSmobilitet fra Japan

Miyake, Shiho, JSPS-FY2008, short-term - Exploring ideas of evaluation scheme for Public Understanding of Science (PUS)

...

Awarded: NOK 64,540

Project Period: 2008-2008

Location: Oslo

IS-JSPS-JSPSmobilitet fra Japan

Hara, Masayuki, JSPS-FY2008, short-term - Studies on changes in properties of biological polymers by irradiation

...

Awarded: NOK 16,200

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

PRIO PES rammebevilgning

PRIOs long-term research and development strategy calls for a strong investment on international research collaboration and funding at a variety of levels. Central to this aim is the expansion and development of long-term, continuous participation in Euro pean Union funding and research arrangeme...

Awarded: NOK 2.4 mill.

Project Period: 2008-2013

Location: Oslo

MAROFF-Maritim virksomhet og offshore operasjoner

Sikker og Bærekraftig Sjøturisme (Forprosjekt)

Forprosjektets intensjon er å utarbeide en BIP søknad med fokus på følgende problemstillinger. Hvert år skjer det ulykker med turister i båt på grunn av feil vurdering av vær og sjø i forhold til fartøyets egenskaper. Dette er ofte et resultat av for li te erfaring, samt generell lav kompetanse...

Awarded: NOK 0.11 mill.

Project Period: 2008-2008

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

Prosjektetableringsstøtte EU, Eureka, EØS (PES). Rammebevilgning.

Veterinærinstituttets samfunnsoppdrag er kunnskapsproduksjon og beredskap på områdene fiskehelse, dyrehelse og mattrygghet. Veterinærinstituttet skal gi forsknigsbasert forvaltningstøtte til mattilsynet, departement (hovedsaklig FKD, LMD) og deres und erliggende etater på disse områdene. rele...

Awarded: NOK 1.8 mill.

Project Period: 2008-2013

Location: Akershus

MAROFF-Maritim virksomhet og offshore operasjoner

Dynamiske informasjonssystem for operativ beslutningsstøtte i kystsonen

Utviklingen av kystsonen vies stadig større oppmerksomhet i nasjonale og internasjonale strategier. Dette fører til at behovet for informasjon og integrerte løsninger vil øke p.g.a. økt aktivitet og større krav til optimal drift. Operasjonene vil bli mer kompliserte og representere stadig størr...

Awarded: NOK 0.15 mill.

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

PLAN-Planlegging

Administrativ støtte til prosess for sammenslåing av UMB og NVH, samt flytting av VI

...

Awarded: NOK 1.0 mill.

Project Period: 2008-2011

Location: Akershus

IS-NAD-Samarbeid med NORAD-land

Wang, Lu, Kina. statsstipend 2008/09

...

Awarded: NOK 0.13 mill.

Project Period: 2008-2009

Location: Oslo

MAROFF-Maritim virksomhet og offshore operasjoner

Design-stage Energy Optimisation and Air-Emission Reduction of Ships (DEO-AEROS) - pre-project

Issues concerning emission reduction of particular relevance in the design stage may be summarised in four key factors: 1. Increasing the logistics chain efficiency (kwh produced/work performed) 2. Increasing the efficiency of the ship(s) (kwh produced/w ork performed) 3. Increasing the specific...

Awarded: NOK 0.13 mill.

Project Period: 2008-2008

Location: Akershus

PES-EUR-Prosjektetablererstøtte Eureka

PES støtte til søknad innenfor Eurostars

...

Awarded: NOK 0.10 mill.

Project Period: 2008-2008

Location: Rogaland

PES-EUR-Prosjektetablererstøtte Eureka

PES støtte for CELTIC INGRID forslag - Interacting Wireless Grids: Cooperative Approaches for Mobile Users

...

Awarded: NOK 25,000

Project Period: 2008-2008

Location: Agder

PES-EU-Prosjektetablererstøtte EU (bedrift)

Security Upgrade for Ports

...

Awarded: NOK 0.51 mill.

Project Period: 2008-2009

Location: Akershus

IS-NAD-Samarbeid med NORAD-land

Song, Tao, Kina, statsstipend 2008/09

...

Awarded: NOK 0.13 mill.

Project Period: 2008-2009

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Efficient net-power from geothermal binary plants

...

Awarded: NOK 0.20 mill.

Project Period: 2008-2008

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Simulation of emergency situations for training and organizational learning

...

Awarded: NOK 52,952

Project Period: 2008-2008

Location: Nordland - Nordlánnda

SKOGFOND-Utviklingsfondet for skogbruket

Economic analyses of use of forest and forest products in Norway to reduce the atmospheric concentration of greenhouse gases, utenlandsstip.

Forest and forest products contribute today in two ways to the reduction of atmospheric content of greenhouse gases. First, while growing, forest absorbs CO2, which is stored in the wood. An old tree may be a pure storage of carbon. But later, the tree wi ll decompose and emit CO2 until most of t...

Awarded: NOK 90,000

Project Period: 2008-2009

Location: Akershus

PES-EU-Prosjektetablererstøtte EU (bedrift)

GMES and Earth Observation with Position-based Image and sensor Communications Technology for Universal Rescue, Emergency and Surveillance m

...

Awarded: NOK 0.60 mill.

Project Period: 2008-2010

Location: Akershus

PES-EUR-Prosjektetablererstøtte Eureka

Innovative and unique solutions to achieve GREEN MARINE transport

...

Awarded: NOK 0.10 mill.

Project Period: 2008-2008

Location: Vestfold

PES-EU-Prosjektetablererstøtte EU (bedrift)

Wind turbine Offshore in deep water by 2010

...

Awarded: NOK 0.50 mill.

Project Period: 2008-2008

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

UTVIDELSE av prosjektet (187960) Robust Envelope Construction Details for Buildings of the 21. Century

1. Emissivitet - varmestråling. Emissiviteten til et materiale sier noe om hvor godt materialet stråler ut energi. Er emissiviteten lik 1 er materialet en god varmestråler. Hvis emissiviteten er nær null stråler materialet ut lite varmestråling. Desto lav ere emissivitet et bygningsmateriale har,...

Awarded: NOK 2.1 mill.

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

BIA-Brukerstyrt innovasjonsarena

Utvidelse KMB ROMA (182617/I40)

The project will focus on industrial measurements and pilot tests as a basis for understanding the production processes and the energy recovery processes that are studied. The application consists of the following parts: 1.Investment in new Portable gas measurement equipment 2.Investment in up...

Awarded: NOK 8.4 mill.

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

IS-NAD-Samarbeid med NORAD-land

Xie, Yuan Yuan

...

Awarded: NOK 0.13 mill.

Project Period: 2008-2009

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Rammebevilgningssøknad for prosjektetablering - TØI

Dagens portefølje av prosjekter med EU-finansiering består av 11 prosjekter. I tillegg var det tre prosjekter som ble avsluttet i 2007. TØIs portefølje av EU-prosjekter i 2007 og 2008 innebærer en totalaktivitet på 53,525 mill NOK fordelt over prosjektene s levetid. I 2008 innbærer porteføljen en...

Awarded: NOK 3.6 mill.

Project Period: 2008-2013

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Prosjektetableringsstøtte(PES) - søknad om rammebevilgning for Nofima konsernet

Pr. 11.9.2008 er det registrert 32 EU FP6 prosjekter for NOFIMA konsernet som helhet i E-Corda( (Kilde: Forskningsrådets EU-kontor). Det er Nofima Mat /Matforsk AS som har størst andel prosjekter i konsernet og har store ambisjoner om å holde aktiviteten høy i årene fremover. De andre forretning...

Awarded: NOK 7.6 mill.

Project Period: 2008-2013

Location: Troms - Romsa - Tromssa

PES-INST-Prosjektetablererstøtte EU (FoU)

PES NOVA - Support for international applications

NOVAs fields of work are of high relevance for international socio-economic research. The research sections at NOVA include child, youth and the family; living conditions and ageing; welfare policies and migration. All sections participate in internationa l projects and networks and have internat...

Awarded: NOK 1.8 mill.

Project Period: 2008-2013

Location: Oslo

PES-EUR-Prosjektetablererstøtte Eureka

Light weight body system for low volume production

...

Awarded: NOK 0.10 mill.

Project Period: 2008-2009

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Ramme-NILU-PES-ordning

NILU har i nesten 20 år deltatt i EUs rammeprogram for forskning, (Framework programmes, FP) med betydelig suksess. Dette er bygget på deltagelse i internasjonalt forskningssamarbeid som går mye lenger tilbake i tid. Instituttet har ambisjon om å oppretth olde et høyt antall EU-prosjekter og anne...

Awarded: NOK 8.0 mill.

Project Period: 2008-2013

Location: Akershus

PES-INST-Prosjektetablererstøtte EU (FoU)

Prosjektetableringsstøtte til arbeid med EU søknader ved NVH

...

Awarded: NOK 0.55 mill.

Project Period: 2008-2013

Location: Oslo

PES-INST-Prosjektetablererstøtte EU (FoU)

Søknad om støtte for NIVAs aktive søknadsarbeid mot deltagelse i EUs forskningsprogrammer

Søknaden er en søknad om en rammebevilgning for aktiviteter under PES ordningen. Søknaden sannsynliggjør et betydelig omfang av søknader for perioden fra 3. september 2008 til 31. desember 2009. søknadsbeløpet fremkommer på to måter. Den ene er en fremsk riving av det omfanget PES prosjektene ha...

Awarded: NOK 3.5 mill.

Project Period: 2008-2013

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

System Level Modeling Environment for SMEs

...

Awarded: NOK 19,583

Project Period: 2008-2008

Location: Oslo