0 projects

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Conference on Future Perspectives on Carbon Capture and Storage

Entering into the final year and approaching the end of the FME SUCCESS Centre, the partners have started preparing for the important milestone of summing up the Centre results. In this context, the SUCCESS Board and partners see great value in presenting all the Centre findings, but also wish to...

Awarded: NOK 73,523

Project Period: 2017-2018

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

CMR PES-midler H2020 rammebevilgning 2017

CMR har deltatt eller planlegger å delta i minst 6 søknader mot EUs programmer i 2017: 3 i H2020, 3 i ERA-NET Cofund. I tillegg planlegges ulike posisjoneringsaktiviteter (bl.a. gjennom EERA Geothermal og EERA Wind Energy) inkludert reiseaktiviteter.

Awarded: NOK 9,999

Project Period: 2017-2017

Location: Vestland

INSTFUS-Instituttfusjon og -samarbeid

INSTFUS-midler til CMR AS

...

Awarded: NOK 1.8 mill.

Project Period: 2017-2019

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

CMR PES-midler H2020 rammebevilgning 2016

CMR har i 2016 deltatt / planlegger å delta i 5 søknader om RIA og IA med søknadsfrist i 2016. CMR planlegger også deltaking i initiativer mot hhv. ERA-NET Cofund og COST i 2016 og i tillegg posisjoneringsaktiviteter. Basert på utlysingstekst og dialog med NFR går CMR ut fra at også aktiviteter ...

Awarded: NOK 0.45 mill.

Project Period: 2016-2016

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

URban heating and cooling supply by Geothermal Energy

In order to favour the comprehensive understanding on how a sustainable, safe and efficient H&C supply can be realized with geothermal resources, URGE foresees activities related to: ? WP2 Detailed feasibility studies of three test sites, to retrieve reservoir performance, life time and economica...

Awarded: NOK 59,999

Project Period: 2015-2015

Location: Vestland

FME-Forskningssentre for miljøvenn

The Zero Emission Maritime Value Chain

Pollutants in the form of gases and particles from ocean-going ships are important contributors to global atmospheric emissions. CO2, NOX and SOX emissions due to shipping are estimated, respectively, to constitute about 3%, 10-15% and 4-9% of the global emissions arising from human activity. Sin...

Awarded: NOK 0.25 mill.

Project Period: 2015-2015

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

SeaSENSE ? Tools for changing practices of Northeast Atlantic fisheries for long-term sustainability

The main goal of the proposed project (SeaSENSE) is to combine the power of merging social and natural sciences to develop tools for evidence-based policy-making, to make a sustainable use of the Atlantic fisheries resources possible. SeaSENSE will provide: i) groundbreaking biosensor technolog...

Awarded: NOK 59,999

Project Period: 2015-2015

Location: Vestland

STIM-EU-Strat.Instituttsats.EU-prosj

STIM-EU CMR, NORCE

...

Awarded: NOK 0.72 mill.

Project Period: 2015-2019

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Integrating thermal energy storage at different scales into buildings performance

Termisk energilager (TES) vil være en sentralt komponent i framtidens "nesten null energi" og plusshus bygninger. Norge er blant Europas ledende land på bruk av berggrunnen som energilager (BTES). I prosjektgruppa vil det også være god kompetanse og erfaring på bruk av andre former for termisk e...

Awarded: NOK 0.20 mill.

Project Period: 2014-2015

Location: Vestland

ENERGIX-Stort program energi

Set 6 EERA JP Energy Storage - støtte til deltakelse som assosiert medlem for Christian Michelsen Research (CMR).

CMR jobber med forskjellige konsepter av energilagring. Vi tror vår konpetanse kan suppler og styrke EERA JP Energy Storage innen termisk lagring ved kjemiske og geotermiske metoder og elektrisk lagring ved bruk av høytemperatur brenselceller og elektroly seteknologi. Midlene vil bli brukt til ...

Awarded: NOK 0.10 mill.

Project Period: 2013-2015

Location: Vestland

ENERGIX-Stort program energi

Set 6: Deltakelse i JP Wind Energy i EERA

Christian Michelsen Research (CMR) har i løpet av de siste årene bygget opp en stor aktivitet innen offshore vindenergi. Det fokuseres spesielt på metodikk for hurtig beregning av energifangst i store havvindparker og på instrumentering og måleteknikker f or offshore vindenergi. CMR er vertsinst...

Awarded: NOK 0.30 mill.

Project Period: 2013-2016

Location: Vestland

MAROFF-2-Maritim virksomhet og offsh-2

Decision support for offshore wind turbine installation

Offshore operations like the installation of equipment, maintenance and repairs are complex and to a high degree weather sensitive. The operations are often carried out by specialized ships which are hired for a given time period. The cost of such operati ons is to a large extent driven by waitin...

Awarded: NOK 6.7 mill.

Project Period: 2013-2015

Location: Vestland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Virtual CO2 Laboratory

Geologisk lagring av CO2 krever god forståelse av reservoarene, av injeksjon og flyt av CO2, og av skjebnen for injisert CO2 på lengre sikt. Utvikling av slik kunnskap fordrer tverrfaglig forskning. Visjonen bak VIRCOLA-prosjektet (Virtual CO2 Laboratory) har vært å utvikle en visualiseringsplatt...

Awarded: NOK 2.6 mill.

Project Period: 2012-2015

Location: Vestland

RENERGI-Fremtidens rene energisystemer

SET4: IEA Energy Storage Annex: Borehole Systems - Quality Management in Design Construction and Operation

Bruken av geoenergi med energibrønner er i eksponentiell vekst i flere land i Asia og Europa. Utnyttelse av lokal miljøvennlig varme og kulde fra energibrønner og med bruk av varmepumpe har et enormt potensiale, og det forventes at mange nye land tar i br uk denne energiteknologien. Teknologien e...

Awarded: NOK 69,999

Project Period: 2012-2012

Location: Vestland

FMEINFRA-FME - utstyr/infrastruktur

SUCCESS. FME infrastruktur 2011

The application from FME-SUCCESS consists of 4 parts in prioritized sequence. A whole range of activities in the SUCCESS centre has been addressed in this application, with particular focus on equipment that will strengthen the cooperation within the cent re. The proposed infrastructure will expa...

Awarded: NOK 6.0 mill.

Project Period: 2011-2014

Location: Vestland

FMEINFRA-FME - utstyr/infrastruktur

NORCOWE- Infrastruktur 2011

Priority list: 1. Motion simulation laboratory 2. A 3D fast scanning lidar (WindCube by Leosphere) More specifically, the scientific goals of the proposed infrastructure are as follows: a) Simulation of wave-induced motions in a controlled and repeatable environment without the need for a wave ...

Awarded: NOK 4.3 mill.

Project Period: 2011-2013

Location: Vestland

PES-INST-Prosjektetablererstøtte EU (FoU)

CFD based design tool for Offshore Wind farm clusters

...

Awarded: NOK 0.20 mill.

Project Period: 2011-2011

Location: Vestland

ENERGIX-Stort program energi

SET2: Integration of Norwegian Geothermal Research into European Union Research Programs

The Norwegian Center of Geothermal Energy Research was established February 2 2009. The center's goal is to plan and coordinate research and development on geothermal energy in Norway, as well as positioning Norwegian expertise internationally. The partne rs have agreed to work through the center...

Awarded: NOK 0.69 mill.

Project Period: 2011-2013

Location: Vestland

FMEINFRA-FME - utstyr/infrastruktur

SUCCESS. FME infrastruktur 2010

The infrastructure to be implemented in this project will expand and strengthen the analytical capability in the centre as well as the ability of the centre to visualize and communicate the scientific results. Particular focus is on equipment that will st rengthen the cooperation within the centr...

Awarded: NOK 5.0 mill.

Project Period: 2010-2012

Location: Vestland

FORINFRA-Nasj.sats. forskn.infrastrukt

Norwegian Offshore Wind Energy Research Infrastructure

The infrastructure includes an OBLO (Offshore Boundary Layer Observatory), a measurement facility for observation of environment, atmospheric and oceanic boundary layer conditions, and a FLEXWT (Floating Experimental Wind Turbine), a fully instrumented mo derate sized (~225 kW) floating offshore ...

Awarded: NOK 2.9 mill.

Project Period: 2010-2012

Location: Vestland

FMETEKN-FME - teknologi

Subsurface CO2 storage - Critical Elements and Superior Strategy

NORSK SAMMENDRAG SUCCESS-senteret for CO2 lagring offshore ble tildelt FME-status i 2009 og ble formelt innviet 1. januar 2010. En sentralt del av arbeid med CO2 lagring er den offentlig aksepten av CCS. FME SUCCESS har derfor hatt som mål og h\jobbe med oppgaver og aktiviteter som kan oppnå eff...

Awarded: NOK 80.0 mill.

Project Period: 2010-2018

Location: Vestland

PETROMAKS2-Stort program petroleum

Geoillustrator - Sketch-based illustrative earth models visualization

I tidlige faser av utforskning av olje og gassfelt er det vanlig at ekspertene lager flere alternative tolkninger av hvordan geologien kan se ut i og rundt reservoaret. Et problem da er at disse tolkningene i stor grad befinner seg som mentale modeller i hodene til ekspertene. Kommunikasjon og f...

Awarded: NOK 10.2 mill.

Project Period: 2010-2014

Location: Vestland

FMEINFRA-FME - utstyr/infrastruktur

EFOWI-Norcowe & Nowitech

...

Awarded: NOK 17.0 mill.

Project Period: 2009-2012

Location: Vestland

FMEINFRA-FME - utstyr/infrastruktur

DIRECT-Success & Norcowe

...

Awarded: NOK 2.7 mill.

Project Period: 2009-2011

Location: Vestland

FMETEKN-FME - teknologi

FME- NORCOWE- Norwegian Centre for Offshore Wind Energy

Noen høydepunkter fra NORCOWE NORCOWE har hatt 27 PhD-studenter siden starten i 2009. Senteret har arrangert sommerskole hvert år fra og med sommeren 2010 til og med sommeren 2015. Hovedformålet har vært å gi PhD-studentene en overordnet forståelse av offshore vindenergi og hjelpe dem til å sett...

Awarded: NOK 120.0 mill.

Project Period: 2009-2017

Location: Vestland

HAVKYST-Havet og kysten

Bilat - An International Echogram Library

Monitoring the marine ecosystem through acoustic surveys is an established methodology used by IMR and similar institutions in other countries, for instance USA and Canada. This generates large amounts of data. There is a need for a system for storing and making available data in a consistent ma...

Awarded: NOK 0.30 mill.

Project Period: 2009-2009

Location: Vestland

FME-Forskningssentre for miljøvenn

FME Marin fornybar

Utvikle søknadsinnhold og avklare partnerskap gjennom kontinuerlig prosess med forskningspartnere og industrielle aktører og interessenter. Tett dialog med NFR er lagt til grunn.

Awarded: NOK 0.20 mill.

Project Period: 2008-2008

Location: Vestland

TU-Tungt utstyr

Ny fleirfaserigg for CMR Instrumentation

CMR Instrumentation har lenge drive forsking og utvikling retta mot måling på fleirfasestrømming i petroleumsindustrien. Eit viktig verktøy i dette forskingsarbeidet har vore ein fleirfase strømmingsrigg som har vorte brukt i mange stadie i ulike prosjekt ; initielle forsøk, testing av prototypar...

Awarded: NOK 2.5 mill.

Project Period: 2007-2007

Location: Vestland

SFI-Sentre for forskningsdrevet innovasjon

The Michelsen Centre for Industrial Measurement Science and Technology

Michelsensenteret for Industriell Målevitenskap og Teknologi (MIMT)er et tverrdisiplinært ressurssenter i instrumentering og måleteknikk innen petroleum, miljøovervåking samt fiskeri og havbruk. Sensorteknologiene som blir utvikla i prosjektene, er basert på akustikk, elektromagnetisme, optikk el...

Awarded: NOK 80.0 mill.

Project Period: 2007-2015

Location: Vestland

SIPOPETR-SIP-OED Petroleumssektoren

Multimodal flow assurance metering station (MuFAMES).

Subsea processing and transportation of multiphase fluids over long distances is becoming a viable solution for several subsea fields. Flow assurance is becoming an increasing challenge as depth and step out length are increasing. The processes conditions with low temperatures have the potential...

Awarded: NOK 12.0 mill.

Project Period: 2007-2010

Location: Vestland