0 projects

DEMO2000-Prosj.ret tekn.utv. petro.virk

SILD Phase 2 - A new concept for Environmental Friendly Well Testing and Reservoir Fluid Sampling

...

Awarded: NOK 2.7 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reel-Well - Drilling and Well Concept

The concept is based on a new patented idea of well construction. The idea is to perform the drilling operation with a dual drill string and a downhole movable packer, which implies a re-arrangement of the drilling fluid hydraulics compared to conventiona l drilling. The method can utilise modern...

Awarded: NOK 1.2 mill.

Project Period: 2004-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sustainable produced water treatment by increasing the operational window of the Epcon CFU to include treatment of solids.

...

Awarded: NOK 2.1 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Cumulative light hydrocarbon parameters: Calibration of models for the process of cumulative filling and mixing of reserv

The processes of oil generation and entrapment are complex and dynamic, though at a slow rate. The composition of the oil expelled by the source rock changes throughout the generation period, giving different inputs into the reservoir over time. Incorp oration these aspects into quantitative b...

Awarded: NOK 0.60 mill.

Project Period: 2004-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. SWIT - Subsea water injection and treatment

The main objective of this R&D project is to develop a system for subsea water injection and treatment (SWIT). It will be designed to significantly reduce the cost of water injection into subsea reservoirs, thus contributing towards increased oil recovery (IOR). The project is a response to the...

Awarded: NOK 99,999

Project Period: 2004-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Formation of piercement structures in sedimentary basins

Piercement structures such as mud volcanoes, hydrothermal vent complexes, and breccia pipes are common in many sedimentary basins. The structures are commonly formed by vigorous eruptions transporting fluids and material from a deep source area to a vent at the surface. The high-permeability cyli...

Awarded: NOK 4.7 mill.

Project Period: 2004-2007

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

VISPO 3D

...

Awarded: NOK 0.60 mill.

Project Period: 2004-2005

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Molecular tools in oil and gas exploration

A principle objective in the Norwegian oil and gas policy is to achieve oil production for 50 years and gas output in a century-long perspective. The recoverable petroleum resources on the NCS were estimated to total 13.8 billion scm oe at 2001 and 28 % o ut of this remain to be discovered. There...

Awarded: NOK 3.1 mill.

Project Period: 2004-2008

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Waterflooding of carbonate reservoirs - Optimization and improved oil recovery

Oil recovery from carbonate reservoirs is more or less dictated by the wetting condition of the reservoir. Opposite to sandstone reservoirs, about 90% of the carbonate reservoirs are believed to be neutral to oil-wet. The oil properties described by the a cid and base number appeared to play an i...

Awarded: NOK 3.2 mill.

Project Period: 2004-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Continuous updating of reservoir simulation models and improved reservoir management

To fully exploit the increased use of permanent sensors for monitoring pressure, temperature and flow rates it is natural to consider methods for continuous updating of the reservoir simulation models from this information. The main task of this project i s to make the ensemble Kalman filter tech...

Awarded: NOK 4.1 mill.

Project Period: 2004-2007

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Subsea Condition Monitoring using detached acoustic sensors

...

Awarded: NOK 0.91 mill.

Project Period: 2004-2005

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Managed Pressure Drilling (MPD), incl Underbalanced Drilling (UBD); A new and safe workprocess by integrating software modelling

...

Awarded: NOK 1.7 mill.

Project Period: 2004-2006

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Smart shuttle

...

Awarded: NOK 2.1 mill.

Project Period: 2004-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Frontier Science and Exploration: The Atlantic - Arctic

We propose linking academic and industrial research and data exchange in order to refine plate reconstruction and basin evolution models, characterize continental-ocean boundaries (COBs) and investigate links between Large Igneous Provinces (LIPs) and Pla te Tectonics. State-of-the-art understand...

Awarded: NOK 3.3 mill.

Project Period: 2004-2007

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Downhole Production Monitoring System (DPMS)

...

Awarded: NOK 6.0 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Development of Dynamic Model for CMP - Controlled Mud Pressure System

...

Awarded: NOK 4.7 mill.

Project Period: 2004-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Physics of Oil Recovery

Under this very broad heading, we present in the following three projects where we propose to use our expertise in the physics of soft and complex matter on urgent problems faced by the oil industry in their efforts to increase the productivity of existin g and new reservoirs. The three principa...

Awarded: NOK 6.2 mill.

Project Period: 2004-2009

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Stretch-free high-order moveout correction, multiple attenuation and seismic imaging

The 1st part of the project is motivated by the wish to better exploit the information recorded in seismic data at large offsets. Generally, data at large offsets suffer from: • Residual moveout. • NMO stretch (usually treated by discarding long offsets). • Coherent noise (e.g. multiples and dif...

Awarded: NOK 3.4 mill.

Project Period: 2004-2008

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Badger Explorer Prototype

...

Awarded: NOK 7.0 mill.

Project Period: 2004-2008

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

MIOR (microbial improved oil recovery): predictive model of stimulated production and improved reservoir management by microorganisms

Microbial oil stimulation processes can be low-cost technologies with great potential for increased oil production if proven to be effective and manageable. There are several reports of MIOR field applications in the literature, and many more undocumented trials, but there is a striking lack of ...

Awarded: NOK 6.0 mill.

Project Period: 2004-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Processing and inversion of marine electromagnetic data

Marine electromagnetic (EM) exploration is a new geophysical tool for locating off-shore hydrocarbon reservoirs. The principle of electromagnetic seabed logging exploits the large resistivity contrast known to exist from standard borehole logging between oil or gas reservoirs and surrounding wate...

Awarded: NOK 2.1 mill.

Project Period: 2004-2008

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Trace component determination in fluid for environmentally friendly exploration and testing.

...

Awarded: NOK 1.4 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Treatment of Produced Water: Characterization and new treatment strategies.

The research tasks in this proposal will contribute to the development of new and improved technology for a more efficient and cost effective treatment of produced water from offshore oilfield installations. The primary research tasks are defined as follo ws: Sampling and characterization A fund...

Awarded: NOK 9.0 mill.

Project Period: 2004-2009

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

Qualification and Pilot Demonstration of HPHT Intelligent Downhold NEtwork and Gauge

...

Awarded: NOK 2.5 mill.

Project Period: 2004-2007

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

DRILLTRONICS Demonstration - Model and Software for Monitoring, Control and Prediction of the drilling process, integrated with existing rig

...

Awarded: NOK 1.3 mill.

Project Period: 2004-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

AKSIO - Active Knowledge System for Integrated Operations

...

Awarded: NOK 7.0 mill.

Project Period: 2004-2009

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Efficient reservoir characterization and production optimization using the augmented Lagrangian and level set methods

Updating of reservoir models with respect to dynamic data is a major challenge, which requires large effort from the field subsurface asset teams. Also, optimal use of available platform process capacities is a major challenge, especially for mature fiel ds with many wells, and for fields with n...

Awarded: NOK 4.7 mill.

Project Period: 2004-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Fault Facies

The project work encompasses two stages, each covering three sub-themes/research tasks and requiring the integration of geology, geophysics, rock mechanics, mathematics, engineering and programming in order to succeed. Stage 1: As the fault facies (FF) project represents an entirely new concept...

Awarded: NOK 9.0 mill.

Project Period: 2004-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Improved Oil Recovery in Heterogeneous Reservoirs

More than 50% of the oil is left behind after oil production is completed in most of the oil reservoirs on the Norwegian continental shelf. This is not acceptable in a global energy perspective. The single most important reason for such a low oil recovery is reservoir heterogeneities, i.e. varia...

Awarded: NOK 5.0 mill.

Project Period: 2004-2008

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Mineral phase transitions control on basin subsidence: The role of temperature, pressure, fluids and melting

The project focuses on studying and modeling the impact of metamorphic reactions within the crust and lithospheric mantle on the formation of extensional sedimentary basins. The volume changes of metamorphic reactions invariably cause changes in the bulk densities of lithospheric units. Numerical...

Awarded: NOK 6.2 mill.

Project Period: 2004-2008

Location: Oslo