0 projects

PES2020-Prosj.etabl.støtte H2020

Sustainable Innovative Sludge Treatment and Management System

Hovedmålet med prosjektet kan leses ut av en foreløpig arbeidstekst for søknaden: "The current and existing technological developments for resources recovery from sludge mainly focus on energy, nutrients, biopolymers, adsorbents and building materials, bu t none of them can be considered as the u...

Awarded: NOK 29,999

Project Period: 2014-2015

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Demonstration of innovative technologies in municipal wastewater treatment in the Mediterranean region.

...

Awarded: NOK 55,000

Project Period: 2013-2013

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of an Ultrasonic Greywater Treatment System

...

Awarded: NOK 29,999

Project Period: 2010-2011

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Sustainable and Innovative Sludge Treatment and Integrated Management for Resources recovery

...

Awarded: NOK 90,000

Project Period: 2009-2010

Location: Oslo

NAERINGSPH-Nærings-phd

Stipend til Ph.D. utdanning for Pascale Stang ved UMB og Aquateam - Utvikling av en ny biologisk prosess for rensing av avløpsvann

Aquateam er en miljøteknologibedrift med behov for meget høyt kvalifisert arbeidskraft. De fleste prosjektene krever kompetanse på Ph.D.-nivå. I flere år har Aquateam slitt med å få tak i folk med gode prosesskunnskaper. Den beste måten Aquateam kan si kre seg kompetanse på er derfor ved vider...

Awarded: NOK 1.2 mill.

Project Period: 2009-2013

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Adaptation of water supply and sanitation systems to cope with climate change

...

Awarded: NOK 49,999

Project Period: 2009-2009

Location: Oslo

BILATNAER-Bilat.samarb.m.N-AM,Kina,Jpn,I

A Sustainable Process to Capture and Store CO2 to Produce More Renewable Bio-Energy

This study aims to integrate different individual processes to utilize micro-algae for production and storage of CO2 (CO2 battery) and further utilise the algal biomass to produce methane by anaerobic digestion for combustion (in addition to treatment of biomass and/or wastewater sludge from diff...

Awarded: NOK 0.40 mill.

Project Period: 2008-2008

Location: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

Construction of sewage pipeline system and modernization of the municipal wastewater treatment plant in Wisznice

...

Awarded: NOK 40,000

Project Period: 2007-2007

Location: Oslo

PES-EØS-Prosjektetablererstøtte EØS-området

Construction of sewage pipeline system and modernization of the municipal wastewater treatment plant in Strzyzow

...

Awarded: NOK 50,000

Project Period: 2007-2007

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sustainable PWRI through application of the PWRI bio-toolbox

...

Awarded: NOK 6.6 mill.

Project Period: 2007-2010

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Understanding the Secondary Effects associated with reservoir Souring Mitigation

Reinjeksjon av produsert vann vil bli et meget viktig løsning for å kontrollere utslipp av produsert vann i følsomme områder. Risiko for forsurning av reservoaret regnes som en av de mest kritiske faktorene som kan hindre suksess. Det er derfor stort beho v for å videreutvikle kunnskapen som gjør...

Awarded: NOK 69,999

Project Period: 2006-2006

Location: Oslo