0 projects

VAM-Velferd, arbeid og migrasjon

Network on employment of migrant workers in China

As China continues to develop its economy in a global context of financial crises and reduced international demand for Chinese goods, the role of migrant workers continues to be crucial. Their livelihoods, rights and social security are important issues f or researches and policy makers alike. Th...

Awarded: NOK 0.50 mill.

Project Period: 2009-2012

Location: Oslo

VAM-Velferd, arbeid og migrasjon

Nordic models facing crisis: Implications for labour market adjustment and inclusion.

This project aims to compare the implications of the global crisis for workforce adjustment at company level and for perceptions of employment security and risk in the Nordic labour forces. While the Nordic models won praise for their ability to adapt and recover after the homemade crises of the...

Awarded: NOK 5.0 mill.

Project Period: 2009-2014

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Teknologisk optimalisering av lengdestrømsrenner som oppdrettssystem

...

Awarded: NOK 0.16 mill.

Project Period: 2009-2010

Location: Troms - Romsa - Tromssa

PES-INST-Prosjektetablererstøtte EU (FoU)

A Systems Biology Attack on Metastasis: the Fatality of Melanoma

...

Awarded: NOK 0.25 mill.

Project Period: 2009-2010

Location: Oslo

STAB-Statistikk og kunnsk.grunnlag

Variations in reporting of R&D statistics from firms in Norway

The project will investigate if there is a substantial underreporting of R&D from Norwegian firms to the R&D statistics by Statistics Norway. The analysis will give explanations and feed into the debate about the understanding of intramural R&D in firms a nd possibly also impact the formulation o...

Awarded: NOK 1.4 mill.

Project Period: 2009-2011

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Brownfield regeneration through sorbent amendment

...

Awarded: NOK 0.20 mill.

Project Period: 2009-2010

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

Sustainable and Innovative Sludge Treatment and Integrated Management for Resources recovery

...

Awarded: NOK 90,000

Project Period: 2009-2010

Location: Oslo

PES-EU-Prosjektetablererstøtte EU (bedrift)

integrated Versatile Image and Sensor communications Infrastructure for Omnipresent Networks

...

Awarded: NOK 0.20 mill.

Project Period: 2009-2010

Location: Akershus

HAVBRUKS-Havbruk - en næring i vekst

Larvi 2009 - 5th fish and shellfish larviculture symposium

Larvi-konferansen er uten sammenligning verdens mest rennomerte konferanse innen yngelproblematikk på marine arter. Konferansen er avholdt hvert fjerde år, alltid i Gent. Forskningsrådet har vært en hovedsponsor i alle Larvi-konferansene som er gjennomfør t så langt. Dette er den direkte årsaken ...

Awarded: NOK 84,833

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

MAROFF-Maritim virksomhet og offshore operasjoner

Elektrisk drevet pod/utenbordsmotor

Det er en rekke teknologier som må utvikles og designes til et konsept med høy pålitelighet, minimalt vedlikehold og konkurransedyktige ytelser og kostnader. Dette gjelder: 1) Utvikling av en kompakt vannkjølt elektrisk permanent magnet motormed liten y tre diameter og lengde som kan drive en p...

Awarded: NOK 99,999

Project Period: 2009-2009

Location: Agder

PES-EU-Prosjektetablererstøtte EU (bedrift)

Development of medium and high capacity tensiometer and tensiocone for field measurement of negative porewater pressure

...

Awarded: NOK 29,561

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Satellite WEB services on Nordic forest monitoring

...

Awarded: NOK 89,999

Project Period: 2009-2010

Location: Akershus

MAROFF-2-Maritim virksomhet og offsh-2

ADEMAR - advanced decision-support system for the development of global maritime logistics networks

The maritime industry constantly faces a number of commercial, technological and societal challenges. Many current challenges are closely linked to the globalization of world trade which has led to greater value chain complexity, and to new and demanding maritime operations in harsh environments...

Awarded: NOK 93,999

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

IS-RUOK-EONR-økonomi

Stenersen, Eirik Nøren eonr øk kat 1

...

Awarded: NOK 69,999

Project Period: 2009-2010

Location: Ukjent Fylke

IS-EC-Europacollegeprogram

Osnes, Mari Ane coe

...

Awarded: NOK 55,000

Project Period: 2009-2009

Location: Ukjent Fylke

IS-RURE-EONR-rettsvitenskap

Fiskerstrand, Beate eonr juss kat 1

...

Awarded: NOK 35,000

Project Period: 2009-2010

Location: Ukjent Fylke

IS-RURE-EONR-rettsvitenskap

Thornes, Helene eon r stat kat 1

...

Awarded: NOK 35,000

Project Period: 2009-2009

Location: Ukjent Fylke

PES-INST-Prosjektetablererstøtte EU (FoU)

Development of Advanced Characterization Methods and Tools for very thin (thickness below 100 µm) Silicon Solar Wafers and Cells

...

Awarded: NOK 74,999

Project Period: 2009-2010

Location: Nordland - Nordlánnda

ENERGIX-Stort program energi

Thermally Managed Systems for Storage, Compression, and Supply of Hydrogen Gas

MH-compression is a safe and reliable method to compress hydrogen. The single most important component of such thermal machines is the MH-materials itself. Typical design parameters for any compressor systems are overall pressure gain and throughput capac ity, both of which in case of a MH-based ...

Awarded: NOK 6.0 mill.

Project Period: 2009-2013

Location: Akershus

MAMMOGRAFI-Evaluering av Mammografiprogr

Overdiagnosis in the Mammography Breast Cancer Screening Programme in Norway

-

Awarded: NOK 0.73 mill.

Project Period: 2009-2015

Location: Ukjent Fylke

ELSA-Etiske,rettslige og samf.m. as

Developing an ISO standard for nanotechnology ethics? A status report.

There is insufficient regulation of nanotechnology. Regulation of nanotechnology will be developed by national and international public authorities, but may also take the form of voluntary standards, for instance, as developed by the ISO. An advantage of the ISO system is that their standards ar...

Awarded: NOK 0.50 mill.

Project Period: 2009-2010

Location: Oslo

PETROMAKS2-Stort program petroleum

Biota Guard Arctic - A Real time environmental effect monitoring system for offshore drilling and production operations in the Arctic

In May 2006 Biota Guard AS initiated a Joint Industry project which main objective was to develop and demonstrate an industrial prototype of a real-time environmental effect monitoring system. The project was supported by the Petromaks program and by indu stry sponsors StatoilHydro and ENI Norge....

Awarded: NOK 7.2 mill.

Project Period: 2009-2013

Location: Rogaland

IKTPLUSS-IKT og digital innovasjon

Autonomy and Automation in an Information Society for All

Forskningsprosjektet Autonomi og automatisering i et informasjonssamfunn for alle (A3: 2009-2014) har hatt som mål 1) å bidra til en ny forståelse for hvordan digital automatisering av offentlige tjenester samspiller med behovet for autonomi og handlingsrom hos brukere av disse tjenestene, og e...

Awarded: NOK 9.7 mill.

Project Period: 2009-2015

Location: Oslo

KREFT-Offentlig kreftprogram

Integration of clinical and basic research to improve treatment of multiple myeloma

Multiple myeloma is due to clonal expansion of malignant plasma cells. The incidence in the Nordic countries is approximately 6 new cases per 100,000 per year, which corresponds to nearly 20% of all haematological cancers. Approximately 300 people are gi ven this diagnosis each year in Norway. I...

Awarded: NOK 5.8 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

KREFT-Offentlig kreftprogram

Molecular and biological characterization of cancer metastases

Purpose: Metastasis is the principal cause of cancer death, and for most tumor types staging, prognostication and therapy is inadequate. Hence, new knowledge on how to prevent metastasis and identification of predictive markers is among the most important challenges in cancer research. Our strat...

Awarded: NOK 6.7 mill.

Project Period: 2009-2013

Location: Oslo

ELSA-Etiske,rettslige og samf.m. as

Deliberative processes - increased citizenship or a treat to democracy? A synthesis of recent research within nano-technology

The project will be organised around the writing of a position paper on dualism of deliberative processes (50 pages) and the consequences of further research and political activities. In the first part of the paper we will build upon existing documents a nd publications from the deliberative pro...

Awarded: NOK 0.43 mill.

Project Period: 2009-2010

Location: Oslo

ELSA-Etiske,rettslige og samf.m. as

Designed to get away, emerging deliberation and governance on autonomously disseminating technologies.

GM biocontrol agents represents novel and controversial technical means to deal with biological entities that often span political borders. These agents are explicitly designed to spread and/or endure in the environment remote from day-to-day human manage ment. They entail high-stake and urgent i...

Awarded: NOK 0.50 mill.

Project Period: 2009-2010

Location: Troms - Romsa - Tromssa

ELSA-Etiske,rettslige og samf.m. as

NANOETHOS - Novel challenges for ELSA studies

A keyword in the proposed project is the ethos of science. We take the starting point that ethos of science is a necessary prerequisite for social robust development and application of nanotechnology. As reflected in many recent discussions on the issue o f how the ELSA of nanotechnology should b...

Awarded: NOK 0.38 mill.

Project Period: 2009-2010

Location: Trøndelag - Trööndelage

SYNKNØYT-Progr.f.synkrotron- og nøytron

Microbial recognition investigated by membrane protein crystallography

The main goal of this project is to structurally and functionally characterize the molecular interactions underlying infection by the common gastric pathogen H. pylori. This will not only lead to a better understanding of the fundamental molecular recogni tion mechanisms, but also put us in a pos...

Awarded: NOK 3.6 mill.

Project Period: 2009-2013

Location: Oslo

MAROFF-2-Maritim virksomhet og offsh-2

Beregningsmetoder for krefter i vannsøylen - et forprosjekt mot BIP for å gi et forbedret lastbilde og økt sikkerhet i subsea operasjoner.

Når utstyr skal fraktes ned igjennom vannsøylen og ned til havbunn utsettes det for dynamiske krefter. Spesielt igjennom skvalpesonen er de dynamiske kreftene dominerende. Kreftene som blir påført er vanskelig å estimere/beregne nøyaktig pågrunn av det ko mplekse kraftbilde som blir påført fartøy...

Awarded: NOK 2,573

Project Period: 2009-2010

Location: Rogaland