0 projects

ENERGIX-Stort program energi

FASADER I GLASS - Som holder hva vi lover

Forskriftene kan oppfylles ved at en regner at byggets netto energibruk skal ligge under en gitt ramme. Til denne beregningen benyttes NS 3031:2007 Beregning av bygningers energiytelse. I beregningen inngår det en rekke bygningstekniske faktorer, som besk river bygningens utforming og kvaliteter....

Awarded: NOK 2.4 mill.

Project Period: 2009-2013

Location: Oslo

ENERGIX-Stort program energi

Intelligent biogas fuelled energy conversion technologies

-

Awarded: NOK 7.8 mill.

Project Period: 2009-2014

Location: Rogaland

ENERGIX-Stort program energi

High Voltage AC and DC Subsea Cables for Offshore Wind Farms and Transmission Grids

Within Energi 21 (a unifying R&D strategy for the energy sector) five technology target areas are identified in order to respond to the key challenges and to the national objectives. In the strategy document for Energi 21, one of the target areas for more intensive basic research is an energy sy...

Awarded: NOK 12.8 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Miljøgevinst ved Avanserte Måle- og Styringssystemer (AMS)

Trussel om klimaendringer har ført til økt fokus på energiforbruk. EU skal innen 2020 redusere CO2-utslippet med 20% og spare 20% energi, i forhold til en normal utvikling av energiforbruket. I Energi21 fokuseres det bl.a. på energieffektivisering i bygni nger og husholdninger og bruk av fjernavl...

Awarded: NOK 2.3 mill.

Project Period: 2009-2013

Location: Oslo

ENERGIX-Stort program energi

Optimal Short-Term Scheduling of Wind and Hydro Resources

The project aims at developing methods for short-term scheduling of combined hydro- and windpower systems, that take into account uncertainties in different components of the short-term scheduling. The scheduling problem is normally solved by deterministi c methods, assuming that these uncertaint...

Awarded: NOK 7.6 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Engineering og etablering av HyNor hydrogenstasjon på Romerike (HyNor Romerike)

Dette prosjektforslaget omhandler implementering, bygging og drifting av et hydrogen-produsjonsanlegg og en hydrogenstasjon på Romerike basert på fornybar energi. Basert på grundig planleggingsarbeid utført i perioden 2007-2008 har HyNor Romerike i løpet av 2008 fått mer klarhet i kostnader og v...

Awarded: NOK 10.3 mill.

Project Period: 2009-2013

Location: Akershus

ENERGIX-Stort program energi

Markedsnært prosjekt - Hydrogenveien i Norge, Knutepunkt Oslo

Hydrogenbussprosjektet - HyNor Dette prosjektet har vært et demonstrasjonsprosjekt for hydrogenbusser med brenselcelle i Oslo og Akershus. Prosjektet har vært en del av EU-prosjektet CHIC (www.chic-project.eu) som testet ut 26 ikke-kommersielle busser i rutekjøring i en rekke Europeiske byer. ...

Awarded: NOK 13.8 mill.

Project Period: 2009-2017

Location: Oslo

ENERGIX-Stort program energi

Air Insulated Switchgear Technology

-

Awarded: NOK 11.0 mill.

Project Period: 2009-2014

Location: Akershus

ENERGIX-Stort program energi

Reduced energy consumption in buildings - impacts on indoor air quality and health

Prosjektet "Reduced energy consumption in buildings - impacts on indoor air quality and health" har produsert ny kunnskap som bidrar til å sikre at energieffektiviseringstiltak i bygninger ikke går ut over inneklima, luftkvalitet og helse. Bygninger står for 40 % av energibruken i fastlands-Norg...

Awarded: NOK 5.5 mill.

Project Period: 2009-2015

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Solid-state photoelectrochemical production of hydrogen

The project explores the viability of a novel way to use solar energy to split water, producing hydrogen. This involves the use of a semiconductor electrode on a solid-state high temperature proton conducting electrolyte so as to enable direct formation o f dry hydrogen on the cathode, utilising ...

Awarded: NOK 5.5 mill.

Project Period: 2009-2013

Location: Oslo

ENERGIX-Stort program energi

SUPOENER: The Future Role Of Biomass Energy In Norway - An Interdiciplinary Technological, Economical And Environmental Research Program

I WP1 har vi sett på utvikling av økonomisk realistiske bioprosesser for konvertering av trebiomasse til biodrivstoff. Denne forskningen har omfattet tre deler: (1) enzymatisk omdannelse av polysakkarider som cellulose til enkle sukkerarter som kan omdannes til for eksempel etanol gjennom ferment...

Awarded: NOK 11.8 mill.

Project Period: 2008-2017

Location: Akershus

ENERGIX-Stort program energi

ECLAIR-RFCP-CT

...

Awarded: NOK 1.0 mill.

Project Period: 2008-2013

Location: Oslo

ENERGIX-Stort program energi

DEVELOPING NEXT GENERATION LOW COST AND DURABLE PEM WATER ELECTROLYSERS

Hydrogen Technologies (Hydro) is working towards commercialisation of PEMWE technology. The fundamental PEMWE catalyst development took place at NTNU during the late 1990s. Hytrec AS (and partner Statkraft) has decided to utilise PEMWE technology for the ir R&D and demonstration centre at Tyholt...

Awarded: NOK 3.6 mill.

Project Period: 2008-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

End Use of Photovoltaic Technology in Norway

The overall objective of this project is to investigate the hypothesis that "solar electricity is a viable alternative even in Norway". Because of the project, we will know more about under what assumptions this is true, or - conversely - why the hypothes is is false. This will be achieved throug...

Awarded: NOK 6.2 mill.

Project Period: 2008-2013

Location: Agder

ENERGIX-Stort program energi

Novel light-weight metal hydrides for hydrogen storage applications

One major unsolved problem for the introduction of hydrogen into the global energy system is effective storage of hydrogen. This proposal addresses hydrogen storage in aluminium hydride and novel boron-based hydrides. Both groups of materials have hydroge n contents in the range of 10 wt% H. Rece...

Awarded: NOK 8.3 mill.

Project Period: 2008-2013

Location: Akershus

ENERGIX-Stort program energi

Advanced MOFs for Hydrogen Storage in Cryo-adsorption Tanks

The following work tasks have been defined in the Norwegian part of the project: 1. Measurement and development of models for predicting the basic material quantities. Of particular interest to the Norwegian group are the thermophysical and flow related properties (e.g effective thermal conducti...

Awarded: NOK 2.8 mill.

Project Period: 2008-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Vegbelysning - strategi og teknologi for behovstilpasset styring

Prosjektet vil omfatte både teoretiske utredninger, fysiske forsøk med utprøving av ny teknologi som grunnlag for senere industriell videreutvikling av måleutstyr for funksjonsstyrt belysning. De teoretiske utredningene vil være knyttet til synlighet av o bjekter i og nær vegbanen, og nyere forsk...

Awarded: NOK 1.1 mill.

Project Period: 2008-2013

Location: Akershus

ENERGIX-Stort program energi

Bærekraftig produksjon av hydrogen fra avfall

Det tekniske anlegget er tilnærmet ferdigstilt. Oppgradert biogass blir produsert i full skala. Det har dessverre ikke lykkes Lindum å driftssette hydrogenreformeringsanlegget innenfor dette prosjektet slik målsetningen var. Det er imidlertid slik at Lindum fortsatt har planer for å jobbe videre ...

Awarded: NOK 8.9 mill.

Project Period: 2008-2018

Location: Buskerud

ENERGIX-Stort program energi

Building markets, shaping policy? The role of economics in energy policy and energy use

In this project, we plan to study empirically to what extent economists have been able to influence policy-making in the energy area and the outcome of their advice. The aim is to analyse the interaction between economists and policy-makers. First, we wan t to do a case study of the decision to l...

Awarded: NOK 3.4 mill.

Project Period: 2007-2014

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

HYBRID HYDROGEN STORAGE SOLUTIONS

Hydrogen, in combination with electricity/electric grid, is by many predicted to become the future choice as energy carrier. One especially foresees the possibility to use hydrogen as energy vector based on renewable energy. These are solutions that in th eory totally prevent emission of greenhou...

Awarded: NOK 3.9 mill.

Project Period: 2007-2014

Location: Vestland

ENERGIX-Stort program energi

Life-Time Commissioning for Energy Efficient Operation of Buildings

Buildings account for over 40% of the energy use and the CO2 emissions in Europe. This buildings should fulfill many requirements, but practical experience shows serious discrepancies between assumptions and goals and the reality. There are several reason s for this problems: poor design, poor op...

Awarded: NOK 10.0 mill.

Project Period: 2007-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Not in my nature? The controversies and politics of environmentalism and public planning in localising wind farms

...

Awarded: NOK 1.2 mill.

Project Period: 2004-2013

Location: Trøndelag - Trööndelage