0 projects

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Sparse Passive-Active Reservoir monitoring using Seismic, Electromagnetics, gravity, and surface deformation

...for large scale CO2 storage operations is the cost associated with the geophysical...safe storage and to assess conformance between the predicted and observed behaviour of the...A possible solution such for low-cost monitoring is the use of sparse geophysical data,...

Awarded: NOK 11.0 mill.

Project Period: 2023-2026

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

HVDC inertia provision

...power systems are facing new challenges when traditional thermal...energy sources with power electronic grid interfaces. In central Europe, an increasing share...periods with few synchronous generators in operation, and the resulting low equivalent rotating...

Awarded: NOK 14.5 mill.

Project Period: 2017-2022

Location: Trøndelag - Trööndelage

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Bayesian monitoring design.

...the current plans to utilize the large theoretical...North Sea there is a need for economical monitoring technologies that will either assure...over large areas. This is also required by international regulations and agreements. BayMoDe...

Awarded: NOK 6.6 mill.

Project Period: 2016-2020

Location: Vestland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Large-Scale Demonstration of pressurized Chemical Looping Technology (CLC) in Natural Gas Power Generation with CO2 Capture

...proposal describes a five-year knowledge-building project with user-involvement (KMB) that.... This technology is not a mature technology, and the industry actors in the project consortium...from the possibility of developing knowledge and business opportunities through their...

Awarded: NOK 21.6 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Kongsberg on-line Wake model

...Maritime (KM) is currently developing a Wind Farm Management System. The system...Condition Monitoring, Production Forecasting and Wind Farm Control. In addition, various tools...developed to provide integrated present ation and improved operation support for wind farms. KM...

Awarded: NOK 4.9 mill.

Project Period: 2014-2017

Location: Akershus

PES2020-Prosj.etabl.støtte H2020

GRID PV - utility-friendly integration of Solar PV at high penetration levels

...PV is already the cheapest form of electricity generation in...existing fossil fuel operating costs. Hence, there is still a strong drive for solar PV cost...Renewable Energy (VRE) in large scale impacts the integrity, reliability, security and stability...

Awarded: NOK 89,999

Project Period: 2019-2020

Location: Trøndelag - Trööndelage

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

CO2 Capture: Enabling Research and Technology

...The NTNU and SINTEF team behind this proposal...groups within CO2 capture that are among the most active and productive in the world, also...real p rogress, is a formidable collaborative and united effort, internationally oriented,...

Awarded: NOK 15.4 mill.

Project Period: 2007-2013

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Solutions and strategies for operation and maintenance of utility-scale solar power plants

...proposed project brings together the technological know-how of Scatec...Statoil, with an extensive O&M experience from the energy industry on very large scales,...SCADA software developer for the PV industry, and IFE, the leading, Norwegian research group on...

Awarded: NOK 7.2 mill.

Project Period: 2018-2021

Location: Oslo

FRINATEK-Fri prosj.st. mat.,naturv.,tek

Control implementation of optimal operation of process plants

...The principal objective of this project is to...where one uses a constant setpoint policy for the controlle d variables, and in this project we...This project is related to a larger activity in plantwide control performed in the group of...

Awarded: NOK 8.2 mill.

Project Period: 2011-2016

Location: Trøndelag - Trööndelage

NANO2021-Nanoteknologi og nye materiale

Novel oxygen carriers in sustainable hydrogen production

...looping hydrogen production (CLHP) using a...(methane, steam and air) has attracted lots of interest due to inherent CO2 separation,...separation processes, thermal neutrality, and reduced economic sensitivity towards process...

Awarded: NOK 10.2 mill.

Project Period: 2021-2025

Location: Trøndelag - Trööndelage

NAERINGSPH-Nærings-phd

Anaerobic digestion of pyrolysis products

...society produces various types of waste streams. With an increased focus on...stricter regulations regarding waste handling, the demand for sustainable waste handling...Pyrolysis is the thermal decomposition of organic materials in the absence of oxygen....

Awarded: NOK 2.4 mill.

Project Period: 2020-2023

Location: Vestfold

IS-BILAT-Mobilitet Norge-USA /Canada

Research leave at MIT LFEE for Asgeir Tomasgard

...Infrastructure for natural gas production and...lifetime of 30 years and more. This means that the operational use of the infrastructure and the...Strategic decision suppor t models for investment analysis need to capture the long term...

Awarded: NOK 0.24 mill.

Project Period: 2006-2007

Location: Trøndelag - Trööndelage

IKTPLUSS-IKT og digital innovasjon

Controlling Spins in Quantum systems in an Online Setting

...Semiconducting spin qubits have small sizes and incredible...so far been prevented by material noise limiting qubit coherence and decreasing gate fidelity....strong sensitivity to electric fields can be profited from if a sufficiently large number of gate...

Awarded: NOK 2.6 mill.

Project Period: 2022-2025

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Performance analytics for utility-scale PV power plants

...to the extremely rapid growth in the PV industry,...to new high-efficiency architectures, much of this is based on young products with only a few...data related to performance, degradation and fault rates in modern PV power plants. This...

Awarded: NOK 9.4 mill.

Project Period: 2021-2024

Location: Oslo

NAERINGSPH-Nærings-phd

Hybridization of Hydropower Plants With Floating PV: Design and Optimization

...societies are nowadays aiming to an increasing use of renewable energy...power generation, like wind and solar PV, the future of power systems is likely to be built...Hydropower is generally considered as one of the cheapest and most reliable renewable energy...

Awarded: NOK 2.0 mill.

Project Period: 2019-2024

Location: Oslo

INT-BILAT-BILAT-ordningen

China - bilateral cooperation within biogas from sewage sludge for renewable energy production

...currently under development for establishment of a project with the working title "Biogas from...energy production in China". The main objective of the main project is to increase production and...in China through development of centralized biogas production technology from sewage sludge....

Awarded: NOK 0.14 mill.

Project Period: 2007-2008

Location: Oslo

ENERGIX-Stort program energi

Sustainable design and operation of hydro power plants exposed to high sediment yield

...The present proposal is about the sustainable...power plants exposed to high sediment yield. The global development of hydropower is an...potential, it is challenged by both social and ecological considerations. Consequently,...globale utviklingen av vannkraft er et viktig skritt mot et...

Awarded: NOK 12.3 mill.

Project Period: 2015-2020

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Biogas Reactor Technology for Norwegian Agriculture

...In order to reduce the greenhouse gas emissions...should be treated by anaerobic digestion (AD). The AD plant economy can be enhanced by increased...of energy rich substrates like fish en silage and /or food or slaughterhouse waste. However, the...

Awarded: NOK 15.9 mill.

Project Period: 2011-2016

Location: Akershus

IKTPLUSS-IKT og digital innovasjon

Analytics for asset Integrity Management of Wind farms

...65 GW of onshore wind turbine installations in Europe...end-of-design-life by 2028. It is time for the operators to decide on one of the three...lifetime extension, or repowering. The last two options will increase the operating...sammendrag Vindturbiner blir normalt designet for 20-25 års...

Awarded: NOK 16.3 mill.

Project Period: 2021-2025

Location: Agder

MAROFF-2-Maritim virksomhet og offsh-2

Feasibility study of a concept for operating remotely controlled underwater vehicles from an unmanned surface vessel, phase 2.

...to superior performance and versatility, work-class ROVs are – and are...remainthe workhorse of subsea construction and IMR within oil & gas and renewables. ROVs are...subsea vessels. However, for many ROV duties, there is limited- or no value added from the...

Awarded: NOK 5.5 mill.

Project Period: 2020-2022

Location: Buskerud

HAVBRUK2-Stort program for havbruksforskning

New technologies for sustainable farming of Atlantic salmon in semi-closed systems - AquaDome as a full scale test platform

...project aims to realize The Botngaard System as a new closed cage farming...new solutions for sustainable development of the fish farming industry, within a number of...includes technology, instrumentation and monitoring of water quality and fish welfare, new...

Awarded: NOK 5.9 mill.

Project Period: 2015-2021

Location: Nordland - Nordlánnda

EUROSTARS-EUROSTARS

E!6027 Offshore Cultivation of Seaweed

...The goal in SEAWEED-STAR is to develop a cost...offshore seaweed cultivation system, based on the principles of the Seaweed Carrier cultivation...The timing of this project is excellent and urgent. The worldwide demand for renewable...

Awarded: NOK 7.3 mill.

Project Period: 2011-2013

Location: Trøndelag - Trööndelage

FRIPRO-Fri prosjektstøtte

KeyMAT: Advanced Synthesis Designs to Unlock Redox/Acidity Cooperativity in Nanoporous Materials for Selective Oxidation Reactions

...oxidation of alkanes such as methane promises to be an...waste mitigation strategy, provided superior and scalable catalysts can be designed, exhibiting...The challenge is in the strong C-H bond of methane with a bond dissociation energy (BDE)...

Awarded: NOK 8.0 mill.

Project Period: 2023-2026

Location: Oslo

F-KJEM-Naturvitenskap, kjemi

Plantwide control of chemical processes

...have also proposed a systematic method for control structure. The proposed research will focus...the following issues: 1. Self-optimizing Control 2. Achievable decentralized perfor mance 3....4. Computational complexity 5. Complexity of the control system 6. Secondary controlled...

Awarded: NOK 1.4 mill.

Project Period: 2005-2007

Location: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Certified battery shut down system

...The more stringent requirements for operating SPS...environmentally vulnerable areas are pushing the industry towards developing all-electric...electrical motors to operate subsea valves. The solutions that have emerged so far focus on...

Awarded: NOK 6.3 mill.

Project Period: 2018-2020

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Electric power systems for subsea processing and transportation of oil and gas

...SINTEF Energy Research proposes a joint long term...oil companies, supplier industry, NTNU and the Norwegian Research Council with the...and skills on design, analysis and verification of systems for transmission and distribution of...

Awarded: NOK 8.1 mill.

Project Period: 2006-2012

Location: Trøndelag - Trööndelage

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Accelerating Carbon Capture using Oxyfuel technology in Cement production

...In AC²OCem, pilot-scale experiments, as well as...will be performed to bring the key components of oxyfuel cement plants to TRL6 with the aim of...will explore the 1st generation oxyfuel for retrofitting, focusing on optimization of the oxyfuel...

Awarded: NOK 7.9 mill.

Project Period: 2019-2023

Location: Trøndelag - Trööndelage

EUROSTARS-EUROSTARS

E!5720 Green indoor growth factory for production of high value compounds through GMO plants.

...The main partner Lumigreen AS, Norway, has since...research in development of novel production and growth systems for plants, based on the use of...Ltd. Lumigreen has succeeded in development of both a computer controlled photosynthesis...

Awarded: NOK 3.2 mill.

Project Period: 2010-2013

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Network of Nano chemical sensors and Nano water cleaning/energy generating technology for supporting eco-intensive aquaculture

...to limited access to freshwater resources combined with stringent environmental regulations....also facing challenges, related to fish health and emissions of nutrients. Eco-intensive...Fish is, highly susceptible to pollutants in water, and keeping up the eco-intensive...

Awarded: NOK 0.25 mill.

Project Period: 2017-2017

Location: Oslo

SIP-NHD-Strategiske instituttprogram finansiert av NHD

Optimization and environmental improvement of CO2-capture processes

...is now a well established fact that in order to mitigate unwanted environmental...capture and storage of CO2 is one method promising significant cuts. The continuing growth of...to exhaust gases from both power generation plants and industry in general. Post-combustion...

Awarded: NOK 4.1 mill.

Project Period: 2008-2011

Location: Telemark