0 projects

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Making Citius X100 a solution to the missing 4D component in seismic work, to find oil and gas reservoir.

Gather enough information about tecnological and eqonomical aspects of starting up a main project with the aim to produce a new product within the 4D seismic market.

Awarded: NOK 99,999

Project Period: 2005-2005

Location: Møre og Romsdal

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Liquefaction of Unprocessed Well Stream (LUWS)

IFE has filed an international patent application offering a new method and system for condensation of unprocessed well stream from offshore gas or gas condensate fields when conventional liquefaction technology becomes too expensive. In the present conce pt, well stream is supposed to be unproce...

Awarded: NOK 99,999

Project Period: 2005-2006

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Monitoring and re-use of operating experience in eOperations

The following activities shall be focused on: 1. Investigate how other industries have applied eOperation-type monitoring and experience utilisation and what learning can be applied from this for offshore eOperations 2. What data types are needed (minimu m) for monitoring safety and operational ...

Awarded: NOK 49,999

Project Period: 2005-2005

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

e-Operation, value potential and new technology for real-time reservoir management, production optimization and operation.

...

Awarded: NOK 10.0 mill.

Project Period: 2005-2008

Location: Telemark

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

IntelliGel-New methods for blocking water, increasing oil production and reducing sand production from subsea wells by intelligent chemistry

...

Awarded: NOK 3.6 mill.

Project Period: 2005-2007

Location: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Development and Commercialization of a Real-Time Integrated Geosteering Software Tool

...

Awarded: NOK 2.8 mill.

Project Period: 2005-2008

Location: Akershus

INFRA-Infrastrukturtiltak

Felles FoU-selskap mellom UiS og RF

...

Awarded: NOK 0.70 mill.

Project Period: 2005-2005

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Membrane contactor demonstration project

...

Awarded: NOK 1.7 mill.

Project Period: 2005-2006

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Prototype development of an electrically driven direct multistage pump for CO2 fluid injection

...

Awarded: NOK 3.5 mill.

Project Period: 2005-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Compressed Energy Technology

...

Awarded: NOK 5.6 mill.

Project Period: 2005-2006

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Ship based Production and Transportation of HLG (Heavy Liquified Gas)

If natural gas is condensed under pressure, less energy is required for the condensation process compared to atmospheric LNG. Due to the reduced amount of heat to be transferred in the condensation process, reduced power consumption and the reduced requir ement for pre-treatment, the investment c...

Awarded: NOK 2.7 mill.

Project Period: 2005-2007

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Experimental investigation and CaCO3 scale deposition during oil recovery.

The international oil&gas industry on the Norwegian continental shelf is facing higher water production as fields mature. Many oil fields in operation today have major scale problems, and new insight and know-how in this area are important. Halten/Nordla nd is one of the major gas producing fiel...

Awarded: NOK 6.8 mill.

Project Period: 2005-2008

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Pressure Management in Subsea Drilling and Well Intervention for increased Productivity and Recovery

The Ocean Riser In-balanced Intervention System (ORIBIS) allows the Bottom Hole Pressure (BHP) to be controlled independent of flow rate through the well bore. The 7 3/8 inch High Pressure (HP) riser will carry a Subsea BOP and a LRP (Low Riser Disconne ct Package). On top of the HP riser will ...

Awarded: NOK 3.5 mill.

Project Period: 2005-2007

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Develop, prototype design and offshoretest a unique sensor for continous monitoring of hydrocarbone leakage from subsea production templates

...

Awarded: NOK 2.8 mill.

Project Period: 2005-2007

Location: Akershus

SUPOPETR-SUP-OED Petroleumssektor

Enabling technology for sub sea production of oil and gas using electricity for power supply and control.

Fundamental research and development of new competence at NTNU, will provide a basis for the creation of more cost-effective technology for oil and gas production from smaller or complex sub sea fields. Further, increased recovery from mature fields requi res electric power for water or gas injec...

Awarded: NOK 8.9 mill.

Project Period: 2005-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Co-Visualization of Temporal and Spatial Data for Real-Time Reservoir and Production Management Work Processes

...

Awarded: NOK 2.2 mill.

Project Period: 2005-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Increased gas transport capacity

...

Awarded: NOK 9.5 mill.

Project Period: 2005-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

CO2 value chain from Tjeldbergodden to Draugen/Heidrun

...

Awarded: NOK 3.0 mill.

Project Period: 2005-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Improved macroscopic sweep efficiency in CO2-flooding of North Sea reservoirs

The present research project is divided into four main activities: •Qualification of chemicals systems (foam or polymer) for sweep improving methods, including determination of system properties, interaction between chemical system and reservoir fluids, injectivity, retention of chemicals and ch...

Awarded: NOK 8.4 mill.

Project Period: 2005-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Prediction of deposition and transport of sand in sand-liquid flows (STRONG)

...

Awarded: NOK 7.4 mill.

Project Period: 2005-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT!Development of a real time updated sand production and sand transport model for production optimalization with respect to sand

This project will be a pilot project to demonstrate the advantages of real-time application of physics based models for sand management. The central activities within the project will be to: a) Development/definition of models for sand production and san d transport based on corresponding mechan...

Awarded: NOK 1.3 mill.

Project Period: 2005-2006

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Fiscal MultiPhase and WetGas Meter

...

Awarded: NOK 2.5 mill.

Project Period: 2005-2006

Location: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Power Suction Tool

...

Awarded: NOK 1.5 mill.

Project Period: 2005-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Estimation of false amplitude anomalies on seismics from Ocean Bottom acquisition (OBS/OBC) from converted waves in 3D anisotropic models

Ideally, a seismic data cube should contain amplitudes that are proportional to the reflectivity of the subsurface. In practice, the seismic amplitudes used for interpretation are highly dependent on other factors such as survey geometry, instrumentation, filtering and muting of prestack data, m...

Awarded: NOK 4.5 mill.

Project Period: 2004-2007

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reinjection of produced water: Effect of nitrate treatment on reservoir souring and microbially induced corrosion.

The properties of the injection water influence the microbial population in the water injection system and oil reservoir. Most important are microbially mediated H2S production from the oil reservoir (reservoir souring) and Microbial Induced Corrosion (MI C) of pipelines caused by Sulfate Reducin...

Awarded: NOK 3.1 mill.

Project Period: 2004-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Evaluering av UEP (Undervanns Elektrisk Potenisale) og UMF (Undervanns Magnetisk Felt) brukt for tilstandskontroll av

Forprosjektet vil består av følgende aktiviteter: 1.Kjøpe inn eventuelt lage sensor for måling av elektrisk potensiale og magnet felt. Naxys har gode kontakter med miljøet hos Forsvarets Forskningsinstitutt (FFI) som jobber med relevante havbunns sensorer . 2.Utføre studie av relevant litteratur ...

Awarded: NOK 99,988

Project Period: 2004-2005

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Characterization of microseismicity

The pre-project should cover a literature study and a survey of main frontiers of knowledge and technology. It should also include activity to establish collaboration to relevant institutions and clarify the direction of the research in a later main proje ct. The pre-project should lead to a jo...

Awarded: NOK 99,999

Project Period: 2004-2005

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Subsea drilling module

As part of its technology gap analysis, Wellbore Solutions AS has identified a market need for remotely controlled sub-sea drilling robots for pre-drilling of wells. Drilling of sub-sea wells is highly expensive as rig rates often is around 2-250,000 USD per day. Also, it becomes more and more ...

Awarded: NOK 99,999

Project Period: 2004-2005

Location: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Field Piloting Project; DWI 3000 - Demonstration of a Fibre Rope Deployment System for Ultra Deep Water Installation of subsea hardware.

...

Awarded: NOK 2.3 mill.

Project Period: 2004-2005

Location: Møre og Romsdal

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Bidrag til Society of Petroleum Engineers (SPE) sin konferanse med lansering av bok om petroleumsforskning

...

Awarded: NOK 49,999

Project Period: 2004-2005

Location: Rogaland