0 projects

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Develop, prototype design and offshoretest a unique sensor for continous monitoring of hydrocarbone leakage from subsea production templates

...

Awarded: NOK 2.9 mill.

Project Period: 2005-2007

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Ship based Production and Transportation of HLG (Heavy Liquified Gas)

If natural gas is condensed under pressure, less energy is required for the condensation process compared to atmospheric LNG. Due to the reduced amount of heat to be transferred in the condensation process, reduced power consumption and the reduced requir ement for pre-treatment, the investment c...

Awarded: NOK 2.7 mill.

Project Period: 2005-2007

Location: Viken

DEMO2000-Prosj.ret tekn.utv. petro.virk

Fiscal MultiPhase and WetGas Meter

...

Awarded: NOK 2.5 mill.

Project Period: 2005-2006

Location: Ukjent Fylke

DEMO2000-Prosj.ret tekn.utv. petro.virk

Power Suction Tool

...

Awarded: NOK 1.5 mill.

Project Period: 2005-2008

Location: Rogaland

SUPOPETR-SUP-OED Petroleumssektor

Enabling technology for sub sea production of oil and gas using electricity for power supply and control.

Fundamental research and development of new competence at NTNU, will provide a basis for the creation of more cost-effective technology for oil and gas production from smaller or complex sub sea fields. Further, increased recovery from mature fields requi res electric power for water or gas injec...

Awarded: NOK 8.9 mill.

Project Period: 2005-2011

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

Development and Commercialization of a Real-Time Integrated Geosteering Software Tool

...

Awarded: NOK 2.8 mill.

Project Period: 2005-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Experimental investigation and CaCO3 scale deposition during oil recovery.

The international oil&gas industry on the Norwegian continental shelf is facing higher water production as fields mature. Many oil fields in operation today have major scale problems, and new insight and know-how in this area are important. Halten/Nordla nd is one of the major gas producing fiel...

Awarded: NOK 6.9 mill.

Project Period: 2005-2008

Location: Trøndelag - Trööndelage

INFRA-Infrastrukturtiltak

Felles FoU-selskap mellom UiS og RF

...

Awarded: NOK 0.70 mill.

Project Period: 2005-2005

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Membrane contactor demonstration project

...

Awarded: NOK 4.5 mill.

Project Period: 2005-2006

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Co-Visualization of Temporal and Spatial Data for Real-Time Reservoir and Production Management Work Processes

...

Awarded: NOK 2.2 mill.

Project Period: 2005-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Prototype development of an electrically driven direct multistage pump for CO2 fluid injection

...

Awarded: NOK 9.9 mill.

Project Period: 2005-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Compressed Energy Technology

...

Awarded: NOK 5.6 mill.

Project Period: 2005-2006

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

IntelliGel-New methods for blocking water, increasing oil production and reducing sand production from subsea wells by intelligent chemistry

...

Awarded: NOK 3.6 mill.

Project Period: 2005-2007

Location: Ukjent Fylke

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Estimation of false amplitude anomalies on seismics from Ocean Bottom acquisition (OBS/OBC) from converted waves in 3D anisotropic models

Ideally, a seismic data cube should contain amplitudes that are proportional to the reflectivity of the subsurface. In practice, the seismic amplitudes used for interpretation are highly dependent on other factors such as survey geometry, instrumentation, filtering and muting of prestack data, m...

Awarded: NOK 4.5 mill.

Project Period: 2004-2007

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reinjection of produced water: Effect of nitrate treatment on reservoir souring and microbially induced corrosion.

The properties of the injection water influence the microbial population in the water injection system and oil reservoir. Most important are microbially mediated H2S production from the oil reservoir (reservoir souring) and Microbial Induced Corrosion (MI C) of pipelines caused by Sulfate Reducin...

Awarded: NOK 3.2 mill.

Project Period: 2004-2007

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Evaluering av UEP (Undervanns Elektrisk Potenisale) og UMF (Undervanns Magnetisk Felt) brukt for tilstandskontroll av

Forprosjektet vil består av følgende aktiviteter: 1.Kjøpe inn eventuelt lage sensor for måling av elektrisk potensiale og magnet felt. Naxys har gode kontakter med miljøet hos Forsvarets Forskningsinstitutt (FFI) som jobber med relevante havbunns sensorer . 2.Utføre studie av relevant litteratur ...

Awarded: NOK 0.10 mill.

Project Period: 2004-2005

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Characterization of microseismicity

The pre-project should cover a literature study and a survey of main frontiers of knowledge and technology. It should also include activity to establish collaboration to relevant institutions and clarify the direction of the research in a later main proje ct. The pre-project should lead to a jo...

Awarded: NOK 0.10 mill.

Project Period: 2004-2005

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

Field Piloting Project; DWI 3000 - Demonstration of a Fibre Rope Deployment System for Ultra Deep Water Installation of subsea hardware.

...

Awarded: NOK 2.3 mill.

Project Period: 2004-2005

Location: Møre og Romsdal

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Subsea drilling module

As part of its technology gap analysis, Wellbore Solutions AS has identified a market need for remotely controlled sub-sea drilling robots for pre-drilling of wells. Drilling of sub-sea wells is highly expensive as rig rates often is around 2-250,000 USD per day. Also, it becomes more and more ...

Awarded: NOK 0.10 mill.

Project Period: 2004-2005

Location: Ukjent Fylke

PES-EUR-Prosjektetablererstøtte Eureka

Process Qualification

Within the natural gas market segment, there are many different technology and process solutions that will benefit from a systematic approach for qualification, e.g. within - gas treatment: o acid gas removal (H2S/CO2) o dehydration o Mercury remov al - liquefaction of natural gas to LNG/...

Awarded: NOK 0.10 mill.

Project Period: 2004-2005

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Bidrag til Society of Petroleum Engineers (SPE) sin konferanse med lansering av bok om petroleumsforskning

...

Awarded: NOK 50,000

Project Period: 2004-2005

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

SILD Phase 2 - A new concept for Environmental Friendly Well Testing and Reservoir Fluid Sampling

...

Awarded: NOK 3.4 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reel-Well - Drilling and Well Concept

The concept is based on a new patented idea of well construction. The idea is to perform the drilling operation with a dual drill string and a downhole movable packer, which implies a re-arrangement of the drilling fluid hydraulics compared to conventiona l drilling. The method can utilise modern...

Awarded: NOK 1.2 mill.

Project Period: 2004-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Cumulative light hydrocarbon parameters: Calibration of models for the process of cumulative filling and mixing of reserv

The processes of oil generation and entrapment are complex and dynamic, though at a slow rate. The composition of the oil expelled by the source rock changes throughout the generation period, giving different inputs into the reservoir over time. Incorp oration these aspects into quantitative b...

Awarded: NOK 0.64 mill.

Project Period: 2004-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Sustainable produced water treatment by increasing the operational window of the Epcon CFU to include treatment of solids.

...

Awarded: NOK 2.1 mill.

Project Period: 2004-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. SWIT - Subsea water injection and treatment

The main objective of this R&D project is to develop a system for subsea water injection and treatment (SWIT). It will be designed to significantly reduce the cost of water injection into subsea reservoirs, thus contributing towards increased oil recovery (IOR). The project is a response to the...

Awarded: NOK 0.10 mill.

Project Period: 2004-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Molecular tools in oil and gas exploration

A principle objective in the Norwegian oil and gas policy is to achieve oil production for 50 years and gas output in a century-long perspective. The recoverable petroleum resources on the NCS were estimated to total 13.8 billion scm oe at 2001 and 28 % o ut of this remain to be discovered. There...

Awarded: NOK 3.1 mill.

Project Period: 2004-2008

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

VISPO 3D

...

Awarded: NOK 0.60 mill.

Project Period: 2004-2005

Location: Viken

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Waterflooding of carbonate reservoirs - Optimization and improved oil recovery

Oil recovery from carbonate reservoirs is more or less dictated by the wetting condition of the reservoir. Opposite to sandstone reservoirs, about 90% of the carbonate reservoirs are believed to be neutral to oil-wet. The oil properties described by the a cid and base number appeared to play an i...

Awarded: NOK 3.2 mill.

Project Period: 2004-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Continuous updating of reservoir simulation models and improved reservoir management

To fully exploit the increased use of permanent sensors for monitoring pressure, temperature and flow rates it is natural to consider methods for continuous updating of the reservoir simulation models from this information. The main task of this project i s to make the ensemble Kalman filter tech...

Awarded: NOK 4.1 mill.

Project Period: 2004-2007

Location: Rogaland