PETROMAKS-Maksimal utnyttelse av petroleumsreserver

The Neogene uplift of the Barents Sea

Hydrocarbon exploration in the Norwegian part of the Barents Sea has been rather unsuccessful so far, as the traps seem to have experienced partial or complete drainage of hydrocarbons. The problems of finding commercial hydrocarbon deposits in the Norw egian Barents Sea have been attributed to...

Awarded: NOK 5.0 mill.

Project Period: 2010-2012

Location: Rogaland

PETROMAKS2-Stort program petroleum

Integrated EOR in Fractured and Heterogeneous Reservoirs

Prosjektet har funnet nye og bedre metoder for økt oljeutvinning; laboratorieresultater viser spesielt gunstige resultater ved bruk av CO2 og CO2 skum; inntil 95% av oljen blir produsert under kontrollerte betingelser. Dette gir grunnlag for en mulig økt oljeutvinning etter vannflømming på feltsk...

Awarded: NOK 16.0 mill.

Project Period: 2010-2015

Location: Vestland

PETROMAKS2-Stort program petroleum

Geoillustrator - Sketch-based illustrative earth models visualization

I tidlige faser av utforskning av olje og gassfelt er det vanlig at ekspertene lager flere alternative tolkninger av hvordan geologien kan se ut i og rundt reservoaret. Et problem da er at disse tolkningene i stor grad befinner seg som mentale modeller i hodene til ekspertene. Kommunikasjon og f...

Awarded: NOK 10.2 mill.

Project Period: 2010-2014

Location: Vestland

PETROMAKS2-Stort program petroleum

Optimizing Water Chemistry for Enhanced Oil Recovery

We propose to quantify the impact of injected water chemistry on the recovery of oil on the field scale. This will be done by building a streamline model for the chemical changes that occur as the injected fluid moves from injection to a production well. The main focus will be on fractured chalk...

Awarded: NOK 11.1 mill.

Project Period: 2010-2013

Location: Rogaland

PETROMAKS2-Stort program petroleum

Glaciations in the Barents Sea area

Prosjektets hovedmål er forbedret kunnskap om sen kenozoisk geologisk utvikling i Barentshav-området. Følgende resultater er oppnådd: 1) Det er etablert et nytt høyoppløselig rammeverk for stratigrafi og paleomiljø, basert på biostratigrafiske og paleomagnetiske data fra ODP brønner på Yermak-p...

Awarded: NOK 11.0 mill.

Project Period: 2010-2015

Location: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

Barents Sea Rock Properties

Geologisk informasjonen fra sedimentære bassenger kommer i hovedsak fra seismiske data. Disse dataene viser fordelingen av hastighet og tetthet i bassenget. Forståelsen av hvordan bergartsegenskapene forandres som funksjon av begravning og sammensetning er til dels svært mangelfull. Disse prosess...

Awarded: NOK 6.7 mill.

Project Period: 2010-2015

Location: Oslo

FORINFRA-Nasj.sats. forskn.infrastrukt

Geosystem 3-D Seismic Imaging (G3)

The P-Cable 3D Seismic system is a newly developed system for acquisition of high-resolution 3D data. The P-Cable system has been developed from idea to proven technology during the past eight years. It offers forefront marine technology developed by a co nsortium of Norwegian Universities and co...

Awarded: NOK 9.0 mill.

Project Period: 2010-2012

Location: Troms - Romsa - Tromssa

NAERINGSPH-Nærings-phd

Estimation of swell heights and reflection coefficients in rough-sea from dual-sensor towed streamer data

Subsurface imaging from conventional streamer acquisition is flawed by the sea surface level variation and sea surface reflection coefficient fluctuation. Based on a novel dual-sensor towed streamer acquisition system, a new tool for imaging the sea-surfa ce from decomposed wavefields will be dev...

Awarded: NOK 1.3 mill.

Project Period: 2010-2012

Location: Oslo

PETROMAKS2-Stort program petroleum

Nanotechnology EOR - LPS flood for North Sea reservoirs

In order to fulfil the ambitious targets set for oil recovery on the Norwegian continental shelf (NCS) it is necessary to implement enhanced oil recovery (EOR) methods. The targets cannot be achieved by improved exploration, drilling and field management alone. Most of the Norwegian fields are d...

Awarded: NOK 3.6 mill.

Project Period: 2010-2013

Location: Vestland

NORDSATS-Forskningsløft i Nord

Sensorteknologi (tidligere: Subsea Sensors for Oil and Gas)

This project will support leading edge research on advanced technologies for subsea sensors and provide a better physical understanding of the sensor principles. In parallel, the commercialization capabilities of the research groups will be studied and en hanced. New knowledge will also be create...

Awarded: NOK 38.2 mill.

Project Period: 2009-2017

Location: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

Sea floor stability offshore Lofoten, Northern Norway

Mindre utrasninger av ulik størrelse og form karakteriserer kontinentalskråningen utenfor Lofoten. I dette studiet har vi bruk en multi-disiplinær tilnærming for å evaluere deres opprinnelse samt skråningens stabilitet i dag ved å kombinere morfologiske, sedimentologiske, geotekniske og geofysis...

Awarded: NOK 7.6 mill.

Project Period: 2009-2014

Location: Troms - Romsa - Tromssa

PETROMAKS2-Stort program petroleum

Improved imaging, mapping and monitoring of hydrocarbon reservoirs

I inneværende periode har det vært stort fokus på å teste ut og videreutvikle forskjellige måter for å skille mellom trykk og metning fra seismiske data og å bruke andre simuleringer eller målinger i tillegg. Spesielt for grunne reservoarer eller grunne l ekkasjer blir det langt vanskeligere å br...

Awarded: NOK 15.5 mill.

Project Period: 2009-2014

Location: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

Functional microgels for enhanced oil recovery applications.

In this project, we will try to develop different microgel systems for enhanced oil recovery applications. Microgels have several advantages compared to the polymer systems currently used for EOR applications. They are more tolerant to high temperatures a nd salinity, and less prone to degradatio...

Awarded: NOK 3.2 mill.

Project Period: 2009-2013

Location: Oslo

PETROMAKS2-Stort program petroleum

Stimulated Production: Steady and Non-Steady State Two-Phase Flow

One of the most important goals in the recovery of hydrocarbons is to find methods which make it possible to recover the last 20 to 60% of the oil after the production well is declared not profitable. There are many reasons why a large percentage of the oil is ...

Awarded: NOK 8.5 mill.

Project Period: 2009-2014

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

A novel approach to surfactant flooding under mixed-wet conditions

Traditionally, surfactant flooding has been a method for reducing residual oil after water flooding (Sorw), i.e. the target is oil trapped by capillary forces at pore scale. Field remaining oil saturation after water flooding (ROS) may be substantially hi gher than Sorw. The focus will be on ROS ...

Awarded: NOK 10.2 mill.

Project Period: 2009-2012

Location: Rogaland

PETROMAKS2-Stort program petroleum

Low salinity water flooding of North Sea reservoirs: Physical and chemical effects

-

Awarded: NOK 9.0 mill.

Project Period: 2009-2014

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Fault Facies II

Fault related feature have a major impact on fluid flow in many hydrocarbon reservoirs. Despite their ubiquity standard industrial models are not equipped to handle fault zones in a realistic manner. Consequently the ability to forecast fault impact on re servoir performance and drilling operatio...

Awarded: NOK 0.62 mill.

Project Period: 2009-2010

Location: Vestland

PETROMAKS2-Stort program petroleum

Empirical Understanding of Sedimentary Architecture

The shape and stacking of sedimentary bodies, especially sandstones which form hydrocarbon reservoirs, is controlled by a number of processes at the time of deposition. These include the rate of subsidence, the rate of sediment supply, the sedimentary env ironment, the climate and the grainsize o...

Awarded: NOK 6.7 mill.

Project Period: 2009-2013

Location: Vestland

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning NORCE AVD STAVANGER (tidl. IRIS)

...

Awarded: NOK 154.2 mill.

Project Period: 2009-2019

Location: Rogaland

PETROMAKS2-Stort program petroleum

Enhanced Oil Recovery methods - Moving Science into Applications

Nye utvinningsmetoder har vært utviklet gjennom prosjektet. Lav salt vanninjeksjon har blitt kombinert med surfaktant for å dempe kapillaritet. Likeså har lav salt vann også blitt kombinert med polymer injeksjon. Hensikten er at polymer injeksjon akkumulerer olje i det porøse mediet (dannelse av ...

Awarded: NOK 14.0 mill.

Project Period: 2009-2014

Location: Vestland

PETROMAKS2-Stort program petroleum

Mechanisms of Primary Migration

Hydrocarbon fluids of relevance to petroleum exploration are formed as organic-rich source rocks undergo burial and are subjected to increased temperature and pressure in sedimentary basins. Many mechanisms have been proposed for the subsequent migration of the fluids in the source rocks and the...

Awarded: NOK 7.4 mill.

Project Period: 2009-2013

Location: Oslo

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning IFE

...

Awarded: NOK 829.8 mill.

Project Period: 2009-2022

Location: Akershus

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning NORCE Norwegian Research Centre AS (Tekn.-Ind.)

...

Awarded: NOK 220.6 mill.

Project Period: 2009-2022

Location: Vestland

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning Norsar

...

Awarded: NOK 93.2 mill.

Project Period: 2009-2022

Location: Akershus

RBGRUNTEKN-Res.bas.grunnbev.tekn-ind.inst

Grunnbevilgning SINTEF Petroleum

...

Awarded: NOK 114.8 mill.

Project Period: 2009-2017

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Norwegian-Russian collaboration on deep seismic studies of the crust and upper mantle in the Barents Sea

We will establish a closer collaboration between Norwegian and Russian scientists in relation to one of the key research tasks focusing on the crust and upper mantle structure within the ongoing PETROMAKS project 'Petroleum-related regional studies of the Barents Sea region' (PETROBAR). The main...

Awarded: NOK 0.79 mill.

Project Period: 2009-2010

Location: Oslo

PETROMAKS2-Stort program petroleum

Improved sub-salt and sub-basalt imaging by joint inversion of seismic, gravity, magnetic and electromagnetic data

Oil and gas exploration in increasingly challenging regions requires improved imaging technology. This project aims at developing a new joint inversion technology, suitable for the imaging of challenging settings, such as sub-salt and sub-basalt areas. T he joint inversion will integrate seismic...

Awarded: NOK 6.7 mill.

Project Period: 2009-2013

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

Real time rock mechanics measurement during drilling - development of a new downhole scratch tool

...

Awarded: NOK 0.11 mill.

Project Period: 2008-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

pre-proejct: 3D ray-based seismic imaging in complex geologies

Ray-based methods are often seen as not accurate enough for the imaging of complex geology. However, proper implementations can mitigate the inherent limits of those methods. Velocity model estimation and imaging are concerned. Both rely on an optimized and accurate seismic migration code. Both ...

Awarded: NOK 39,718

Project Period: 2008-2009

Location: Trøndelag - Trööndelage

PETROMAKS2-Stort program petroleum

URE - Uncertainty in Reservoir Evaluation - High-Contrast Spatial Features

Project summary: After decades of research on stochastic reservoir characterization, mapping of average properties and representation of heterogeneities are in frequent use in the petroleum companies. Methodologies for data integration and uncertainty ar e also available. Focus of the current pr...

Awarded: NOK 6.4 mill.

Project Period: 2008-2013

Location: Trøndelag - Trööndelage