0 projects

PES-EU-Prosjektetablererstøtte EU (bedrift)

Manufacture of Aerospace preforms: Supply Chain Optimisation Tool

...

Awarded: NOK 40,000

Project Period: 2012-2013

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

MECHANICAL DEGRADATION OF EOR/IOR POLYMERS CAUSED BY PROCESS EQUIPMENT

Mechanical degradation of polymers is a well known technical problem in the industry. Polyacrylamide molecules are flexible chain molecules that can be broken when submitted to high shear rates. This causes an irreversible loss of viscosity of the solutio n, and higher weight polymers will be mor...

Awarded: NOK 0.20 mill.

Project Period: 2012-2012

Location: Rogaland

BIA-Brukerstyrt innovasjonsarena

Future Advanced Steel Technology for Tunneling - FAST-Tunn

The two main objectives in this project is to develop more efficient cutter rings for Tunnel Boring Machines (TBM) used in hard rock formations, with 25% increased efficiency and improve the capabilities of the NTNU model for performance prediction of tun neling operations. Norwegian rock is part...

Awarded: NOK 10.5 mill.

Project Period: 2011-2015

Location: Rogaland

PETROMAKS2-Stort program petroleum

Separation friendly produced water pump.

This project shall have main experimental focus on oil in water droplet break up in pumps, and the resulting effect on downstream oil/water separation. Next, it shall be focused on how pumps impact produced water injection chemicals, which are used to imp rove reservoir flooding operations. The p...

Awarded: NOK 4.6 mill.

Project Period: 2011-2013

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Low Shear Centrifugal Pump for Produced Water Application

A first target application for a low shear pump will be for produced water to de-oiling hydrocyclones on low pressure fields, a well known technology gap. The industry is searching for better pumps, and the benefits are obvious and easy to document. Typ honix has already done some initial studi...

Awarded: NOK 0.20 mill.

Project Period: 2010-2010

Location: Rogaland

PETROMAKS2-Stort program petroleum

Development of a subsea Typhoon Valve.

To qualify and quantify the potential advantages of the Typhoon Valve technology in a subse application, it is necessary to address the following six issues: 1. Examine and determine Typhoon Valve ability to reduce emulsion viscosity 2. Study and determi ne Typhoon Valve resistance against erosi...

Awarded: NOK 4.5 mill.

Project Period: 2009-2013

Location: Rogaland

DEMO2000-Prosj.ret tekn.utv. petro.virk

Pilot Installation and Testing of Typhoon Valve

...

Awarded: NOK 1.1 mill.

Project Period: 2008-2012

Location: Rogaland

FUNN-3-Tilskudd til ulønnet FoU-innsats

34783 T50

...

Awarded: NOK 62,150

Project Period: 2008-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Development and testing of a new low shear valve concept

...

Awarded: NOK 3.5 mill.

Project Period: 2006-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Typhoon Valve - Feasibility Study

PREPROJECT DESCRIPTION The preproject is planned as four more or less parallel activities. There is no obvious milestones before the project termination, except the application to PETROMAKS before 15.03.2006. We intend to have regular contact with the par ticipants to keep them updated on the pro...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Rogaland