0 projects

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Ice ages: subsidence, uplift and tilting of traps - the influence on petroleum systems

The proposed project will model the isostatic response of Cenozoic glaciations in the Barents Sea region and northern North Sea to constrain its potential impact on existing petroleum systems. With greatly improved geological boundary conditions, that is (1) more complete knowledge on timing and ...

Awarded: NOK 12.6 mill.

Project Period: 2005-2010

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Reliable Bulk Transport on Offshore Oil Rigs

This application is a collaborative research effort by the oil industry, process industry, university sector and the research institute sector. It is aimed at achieving cost effective drilling and safer and improved occupational hygiene on offshore oil ri gs. This application consists of two sub-...

Awarded: NOK 4.2 mill.

Project Period: 2005-2008

Location: Telemark

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Hydrates in petroleum production - Assessment of Plug Risk

During transport of oil, gas and water in pipelines, solid gas hydrate plugs may form when the conditions are within the thermodynamic range of stability of natural gas hydrates. The cost of hydrate prevention is often a project stopper for small field de velopments. However, the presence of oil ...

Awarded: NOK 6.4 mill.

Project Period: 2005-2009

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Injection of Oil-swellable Absorbent Polymers into oil-well perforations

This preparatory project (Forprosjekt) aim to evalute and specify a potential new technology to increase the production rate of oil production wells. The work will form a basis for defining a main project applicable for the PETROMAKS programme. This poten tial new technique and product will contr...

Awarded: NOK 99,999

Project Period: 2005-2006

Location: Nordland - Nordlánnda

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Quantification of geological processes that govern basin scale fluid flow

We will assess geophysical characteristics and geological processes of focused fluid flow systems that may go through or connect to potential hydrocarbon reservoirs. The total number of hydrothermal vent complexes in the Norwegian offshore basins is estim ated to be between 2000 and 3000, and we ...

Awarded: NOK 7.2 mill.

Project Period: 2005-2009

Location: Troms - Romsa - Tromssa

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forprosjekt. Data mining and knowledge discovery for smart reservoir characteraization

see attached file

Awarded: NOK 49,999

Project Period: 2005-2006

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

New Subsea and Downhole Instrumentation. Novel measurement methods for real-time reservoir control, e-field operation and subsea processing.

Recent advances in measurement science are attributed to aspects such as novel sensor technology, signal processing methods and finally multiple modality systems. The focus in this project will be to extract more information firstly from each measurement, and secondly from the combination of sev...

Awarded: NOK 17.6 mill.

Project Period: 2005-2009

Location: Vestland

DEMO2000-Prosj.ret tekn.utv. petro.virk

eCAD

...

Awarded: NOK 1.2 mill.

Project Period: 2005-2006

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Detrital zircon as a tool in stratigraphic correlation and sedimentary provenance analysis

From detailed analytical studies of detrital grains of the mineral zircon (ZrSiO4) in clastic sediments, it is possible to obtain unique information on the age, composition and petrogenesis of the rock(s) in which the zircons formed (the protosource). For any given sedimentary rock, chemical and...

Awarded: NOK 3.8 mill.

Project Period: 2005-2008

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Activation of downhole tools

...

Awarded: NOK 0.89 mill.

Project Period: 2005-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Optimisation of Glycol Loop Design and Operation

Glycol, usually monoethylene glycol (MEG), combined with corrosion inhibiting chemicals is often the preferred solution for hydrate inhibition and corrosion mitigation for long distance gas condensate pipelines transporting unprocessed well stream. The gl ycol is often circulated in a closed loop...

Awarded: NOK 10.8 mill.

Project Period: 2005-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Dynamic optimization of the production from wells with rate-dependent fluid composition

Well-optimize relates to the research targets "Reservoarovervåking og -styring, spesielt hurtig oppdatering og bedre reservoirmodeller" and "Sanntids reservoar styring" of the Petromaks programme. The project team will collect frontier knowledge from dif ferent diciplines, and based on this info...

Awarded: NOK 99,999

Project Period: 2005-2005

Location: Trøndelag - Trööndelage

DEMO2000-Prosj.ret tekn.utv. petro.virk

VISPO 3D - phase 2

...

Awarded: NOK 1.5 mill.

Project Period: 2005-2006

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Modeling of capillary pressure and phase entrapment in porous media with account for wettability change

The development of efficient IOR technologies relies on understanding and accurate modeling of multiphase flow mechanisms encountered on various scales, from pore-scale to Darcy scale and further to geo-facies and reservoir scale. Such an integrated multi -scale modeling of water-alternating-gas ...

Awarded: NOK 6.9 mill.

Project Period: 2005-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Honoring the complexity of the petroleum reservoir - a new modeling tool for sea bed logging

SBL is a new and expanding exploration technique with the potential of acting as a direct hydrocarbon indicator. This technique was pioneered by Statoil in close collaboration with NGI. The technology was later transferred to the commercial company EMGS, run by former members of Statoil's scienti...

Awarded: NOK 4.2 mill.

Project Period: 2005-2010

Location: Oslo

DEMO2000-Prosj.ret tekn.utv. petro.virk

"CannSeal" Remedial External Casing Packer Technology

...

Awarded: NOK 0.67 mill.

Project Period: 2005-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Quantitative interpretation of 4D seismic data for improved reservoir management

Prediction of how a hydrocarbon reservoir is being drained is often based on a numerical flow simulation model. 3-D seismic surveying is the most efficient technique to obtain reservoir information between wells. If seismic acquisition is repeated severa l times over the life of a field, it is p...

Awarded: NOK 1.5 mill.

Project Period: 2005-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

ReelWell - Jointed string version. for new drilling concept to improve the cost efficiency for exploration and production drilling.

The project aims on development of a new concept for drilling and completion of petroleum wells. The main purpose of the work is to clarify the technical foundation and organisation possibilities for a Joint Industry Project for developing a new concept for drilling. Some of the technical founda...

Awarded: NOK 99,999

Project Period: 2005-2005

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Multipoint Methods for Improved Reservoir Models

The best method for accurately representing the distribution of petrophysical properties within a reservoir is by representing the geometries of the facies and then populating facies bodies with petrophysical properties. There are a few stochastic techn iques available for modeling facies: - O...

Awarded: NOK 5.3 mill.

Project Period: 2005-2008

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Geological History of the Barents-Kara Seas: Geophysical and palaeogeographic maps of the Barents Sea and Kara Sea - Preproject

The Barents Sea and the Petchora Basin north of 67 deg. N, is one of the World most prolific hydrocarbon provinces, with more than 60 discoveries since the exploration started in the early eighties. Substantial data have been collected, and a number of Pa leozoic to Cenozoic hydrocarbon plays hav...

Awarded: NOK 99,999

Project Period: 2005-2006

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

POPUP Positioning.

Get enough knowledge and information about the technical and organitional challenges for our company regarding research and development of this product.

Awarded: NOK 99,999

Project Period: 2005-2005

Location: Møre og Romsdal

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Establishment of scientific and technological basis, consortium and pilot plant requirements for new GTL technology

...

Awarded: NOK 99,999

Project Period: 2005-2005

Location: Vestland

SIPOPETR-SIP-OED Petroleumssektoren

Droplet Transport Modelling and Generation Enhancement in Hydrocarbon Multiphase transport

Liquid accumulation due to velocity difference between gas and liquids has a significant influence on the capacity and operability of a multiphase hydrocarbon production system. Droplet transport increases the liquid transport and thereby reduces the liqu id accumulation. Present models for dropl...

Awarded: NOK 10.0 mill.

Project Period: 2005-2009

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Developing exploration tools: Microstructural controls on magnetic minerals and magnetic anomalies on the Norwegian continental margin

Geomagnetic field research is in a period of unprecedented opportunity, with the Oersted, Champ, SAC-C Earth satellites, and the new SWARM mission recently approved by ESA. Advances in technology and instrumentation have provided the scientific community with a vast amount of high-quality data fr...

Awarded: NOK 2.7 mill.

Project Period: 2005-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Right time integration and use of production data in reservoir characterization and sweep analysis to maximize the reservoir performance

...

Awarded: NOK 4.1 mill.

Project Period: 2005-2008

Location: Akershus

DEMO2000-Prosj.ret tekn.utv. petro.virk

Qualification of Compact Tubular Coalescer (CTC)

...

Awarded: NOK 1.2 mill.

Project Period: 2005-2007

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Tools for studying hydrate slurry transport in hydrocarbon transport lines - principally gas-condensate lines

Good mathematical models for the physico-chemical processes that govern the critical flow assurance aspects of direct well stream production are important for e-field operations as well as for the initial design. Such models are today inaccurate and immat ure or in some cases non-existent. This p...

Awarded: NOK 8.6 mill.

Project Period: 2005-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Basement Heat Generation and Heat Flow in the western Barents Sea - Importance for hydrocarbon systems

The main objective of the project is to determine the basement composition in the western Barents Sea, primarily from geophysical data, in order to provide input to heat flow estimates; radiogenic heat production varies as a function of basement type and constitutes approximately 50% of the total...

Awarded: NOK 6.0 mill.

Project Period: 2005-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

High Capacity Drill Pipe.-Low Weight High Strength Steel Pipes for Extended Reach and Real-time Communication.

...

Awarded: NOK 51,428

Project Period: 2005-2006

Location: Trøndelag - Trööndelage

PES-INST-Prosjektetablererstøtte EU (FoU)

Prosjektetableringsstøtte til CO2ReMoVe (IP 6RP)

...

Awarded: NOK 38,902

Project Period: 2005-2006

Location: Trøndelag - Trööndelage