0 projects

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Typhoon Valve - Feasibility Study

PREPROJECT DESCRIPTION The preproject is planned as four more or less parallel activities. There is no obvious milestones before the project termination, except the application to PETROMAKS before 15.03.2006. We intend to have regular contact with the par ticipants to keep them updated on the pro...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Improving sub-sea pumping reliability

...

Awarded: NOK 0.88 mill.

Project Period: 2006-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

CODIO - Collaborative Decisionmaking in Integrated Operations

CODIO - Collaborative Decisionmaking in Integrated Operation The CODIO project proposes to create a new synthesis of previous work in integrated operations, decision support, and semantic technology in order to improve decision making processes in future well planning and execution. The ultimat...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Seawater-based fresh water - a way to reduce environmental impact on infections?

...

Awarded: NOK 0.50 mill.

Project Period: 2006-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

The safe behaviour program in Statoil - Does it work? A studie of the "colleagueprogram" in Statoil

...

Awarded: NOK 0.60 mill.

Project Period: 2006-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Time and space for management? The implications of extensive system requirements for the role of management and HSE practice offshore

...

Awarded: NOK 0.50 mill.

Project Period: 2006-2006

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Model centric e-field control processes

...

Awarded: NOK 3.2 mill.

Project Period: 2006-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

BioGuard - a real-time environmental monitoring system for offshore drilling and production operations

...

Awarded: NOK 3.3 mill.

Project Period: 2006-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Crosswell and borehole to seabed EM technology development

...

Awarded: NOK 2.7 mill.

Project Period: 2006-2008

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Mapping of residual oil between wells: a combined use of Electromagnetic (EM) logging and e-Core technology

...

Awarded: NOK 0.94 mill.

Project Period: 2006-2009

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Forskning, utvikling, testing, bygging av prototype. Running Casing Tool & Pick up Elevator & Casing Drilling Tool. Total mechanized Tool

Konseptet er karakterisert som et multi løfte- og kombinasjonsverktøy for rørlengder, rørstreng, brønnrør, stigerør, borestreng og lignende i et borehull eller brønn. Handteringen består i at èt verktøy løfter, senker, skrur rør inn eller ut, fyller og si rkulerer borevæske, sement og andre væske...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Agder

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

ReelWell - Drilling Concept - Reducing cost and improving safety/performance for offshore drilling.

...

Awarded: NOK 5.5 mill.

Project Period: 2006-2007

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Formation Sealing around Badger Explorer

...

Awarded: NOK 0.48 mill.

Project Period: 2006-2006

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Free convection effects in pipes and complex geometries exposed to cooling

...

Awarded: NOK 1.6 mill.

Project Period: 2006-2009

Location: Buskerud

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Amplitude-LNG Loading System Fabrication & Qualification

...

Awarded: NOK 0.73 mill.

Project Period: 2006-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Wireless vibration monitoring

...

Awarded: NOK 5.1 mill.

Project Period: 2006-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Underwater ElectroMagnetic Sensorsystem

...

Awarded: NOK 2.3 mill.

Project Period: 2006-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Condition- and performance-monitoring of critical subsea and topside systems and equipment

...

Awarded: NOK 13.7 mill.

Project Period: 2006-2010

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Improved Water Saturation Estimates from Resisitity Logs based on Capillary- and Electrical Properties from Porous Plate Meas

...

Awarded: NOK 3.7 mill.

Project Period: 2006-2011

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Multiscale-Streamline Simulation of Highly Heterogeneous and Fractured Reservoirs

...

Awarded: NOK 3.4 mill.

Project Period: 2006-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

5th International Conference: "Contaminants in freezing ground, CFG5"

...

Awarded: NOK 49,999

Project Period: 2006-2006

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

The Jan Mayen micro-continent - Searching for new knowledge on prospectivity, basin evolution and sediment provenance

The Norwegian continental margin has been extensively studied through a large number of seismic surveys and drill holes, and the subsurface geology is therefore generally well known. In comparison, the knowledge on the subsurface geology of the conjugate East Greenland margin is rudimentary. More...

Awarded: NOK 9.6 mill.

Project Period: 2006-2009

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

TERMINERT! Fiber optic marine seismic streamer

...

Awarded: NOK 4.9 mill.

Project Period: 2006-2009

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Electrocoalescence - Criteria for an efficient process in real crude oil systems

The fundamental mechanism active in the electrocoalescence process has been identified as a formation of an electrohydrodynamical surface instability. Hydrodynamic models for drop movement has been established and verified experimentally in model systems. This far, coalescence has been studied u...

Awarded: NOK 12.5 mill.

Project Period: 2006-2010

Location: Trøndelag - Trööndelage

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

New Methods and Technology for preventing noise induced hearing loss at offshore platforms

...

Awarded: NOK 0.65 mill.

Project Period: 2006-2006

Location: Vestland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Intelligent Data Sheets and Collaborative Work Processes Methodology, Product Model, Testing and New Business Processes

...

Awarded: NOK 7.5 mill.

Project Period: 2006-2008

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Practical guidance for securing remotely controlled safety instrumented systems (SIS)

...

Awarded: NOK 0.85 mill.

Project Period: 2006-2006

Location: Buskerud

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

WIRESCAN Sub-Sea Development Project Real-Time Condition Monitoring and Analysis for Sub-Sea Wire Systems

...

Awarded: NOK 3.0 mill.

Project Period: 2006-2009

Location: Akershus

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Integrated anisotropic depth imaging and velocity tomography for quantitative interpretation of multicomponent seismic data

...

Awarded: NOK 6.7 mill.

Project Period: 2006-2009

Location: Oslo

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Multi physics simulation of the well in-flow zone.

Petrell AS has over a period of years developed a software package known as Brilliant. This software has been used for a number of applications like fluid flow, gas dispersion, fire, radiation, heat conduction, stress analysis, etc. The software handles p orous media as well as ordinary flow. Br...

Awarded: NOK 99,999

Project Period: 2006-2006

Location: Trøndelag - Trööndelage