0 projects

PES-EU-Prosjektetablererstøtte EU (bedrift)

RETROFIT OF SHIPS WITH GREEN TOOLS AND TECHNOLOGIES

...

Awarded: NOK 0.10 mill.

Project Period: 2010-2010

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Increased gas transport capacity through increased accuracy in numerical modelling of the sea bottom temperature

The Norwegian gas production is transported in large diameter pipelines to Europe, covering around 15% of the European natural gas consumption. Optimal operation of this network is necessary to continue developing the competitive edge of Norwegian natural gas in Europe, and also embedded in TTA8...

Awarded: NOK 99,999

Project Period: 2009-2009

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Rapid transportation of complex fluid mixes.

An effective way of planning and operating process plants and pipeline networks is the use of simulations. Accurate simulations make it possible to cut costs and increase the safety and accuracy of the estimated capacity and thus increase the capacity. An important part of this is the understand...

Awarded: NOK 65,176

Project Period: 2008-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Optimization of operation control, capacity estimation and monitoring of gas transport

The Norwegian gas production is transported in large diameter pipelines to Europe, covering around 15% of the European natural gas consumption. Otimal operation of this network is necessary to continue developing the competitive edge of Norwegian natural gas in Europe, and also embedded in TTA8. ...

Awarded: NOK 58,135

Project Period: 2008-2009

Location: Rogaland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

U.S.-Norway Summer School, Haugesund

...

Awarded: NOK 0.20 mill.

Project Period: 2007-2007

Location: Rogaland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

State of the art investigation of design and operational aspects of CO2-Offshore pipeline transport systems

A very important part of the Norwegian industry is based on export of oil and gas. The one consequence with big impact and focus is the emission of CO2, and how to reduce it. In addition to exporting fossil fuels, we have the opportunity to become a lead player in exporting technology, within t...

Awarded: NOK 0.48 mill.

Project Period: 2007-2007

Location: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

Optimised Development through Innovative Networks

...

Awarded: NOK 99,999

Project Period: 2007-2008

Location: Rogaland

PETROMAKS-Maksimal utnyttelse av petroleumsreserver

Improved over pressure protection and operational efficiency of multi-phase well streams

Over pressure protection of oil platforms is crucial to operation regularity, crew and equipment. Over pressurizing incidents on platform installations result from faulty operation of pressurised flow lines and uncertainties in modelling. These incidents may cause unrestricted unload of oil and g...

Awarded: NOK 99,999

Project Period: 2006-2007

Location: Rogaland

PES-POS-Prosjektetablererstøtte EU

Posisjonering i forbindelse med 7. rammeprogram

...

Awarded: NOK 49,999

Project Period: 2006-2008

Location: Rogaland

CLIMIT-Forskning, utvikling og demo av CO2-håndtering

Konsulentoppdrag - Polytec

...

Awarded: NOK 0.26 mill.

Project Period: 2006-2006

Location: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

NEST - Theoretical Description of the Dielectric Properties of Water for Tomographic Use

...

Awarded: NOK 49,999

Project Period: 2005-2005

Location: Rogaland

PES-EU-Prosjektetablererstøtte EU (bedrift)

CRAFT- Novel Tomography for Multiphase Measurements in the Gas Industry

...

Awarded: NOK 99,999

Project Period: 2005-2006

Location: Rogaland