0 projects

Selections based on text queries do not reflect the Research Council's published statistics. Read more...


Text queries provide an overview of all projects containing the specified text in either its title or summary. This may result in a different selection of projects than that used by the Research Council as presented in its various publications. The Research Council's statistics are normally based on selections in set categories. You will find these in the left menu, in the diagrams themselves or when selecting from the left column of autocomplete suggestions via the search field.

Les mer...

IS-RUOK-EONR-økonomi

University of Mannheim - NHH Bergen Double Degree Program (MSc in Management and MSc in Business Administration and Economics)

...Change Management, International Human Resources Management and Global Marketing. As I am...my second Master year at NHH Bergen in the Energy, Natural Resources and the Environment track...Accounting, Business Language in the Energy Sector and a seminar in the third semester....

Awarded: NOK 91,000

Project Period: 2012-2013

Location: Ukjent Fylke

PETROMAKS2-Stort program petroleum

Digital Twin for Optimal Design and Operation of Compact Combined Cycles in Offshore Oil and Gas Installations

...goal of DIGITAL TWIN is to develop modelling software...operational efficiency and reliability. The digital twin will be designed for use in greenfield...oil and gas production which will increase energy efficiency and reduce fuel consumption and...

Awarded: NOK 9.6 mill.

Project Period: 2021-2025

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Hydrogen Pathways 2050 - Transition of the Norwegian society and value creation from export

...will study the transition towards zero emission for the Norwegian society, with a special focus on...Hydrogen may play a key role in the future energy system, as it provides flexibility both to...and how hydrogen can be an export product for Norway in the future. The project includes...

Awarded: NOK 14.0 mill.

Project Period: 2021-2026

Location: Akershus

EUROSTARS-EUROSTARS

E:238 Lifecycle Digital Twins of Green Process Plants to Support Fast and Cost-efficient Climate Action

...product and a breakthrough in green process engineering, bridging the gap between cutting-edge...are still in their early stages and the market for lifecycle digital twins of green processes is...companies who have been using lifecycle digital twins for their fossil-based process plants...

Awarded: NOK 4.0 mill.

Project Period: 2022-2024

Location: Akershus

PES2020-Prosj.etabl.støtte H2020

Innovation, Developement and Economic Analysis for Sustinability

...development, it is essential to transform the today?s socio-technical systems and go...?take-make-waste? model that exploits natural resources beyond the carrying capacity of...problems in the socio-economic production system arising from our production and consumption...

Awarded: NOK 19,999

Project Period: 2017-2017

Location: Telemark

INDNOR-India-programmet

Sustainable development of geothermal energy in North Western Indian Himalayas

...Himalayas are promising area for geothermal utilization containing geothermal...provinces. Development of the geothermal resources has the potential to supply the region with...and sustainable development of geothermal energy in North Western Indian Himalayas addresses...

Awarded: NOK 1.0 mill.

Project Period: 2010-2011

Location: Oslo

FME-Forskningssentre for miljøvenn

Zero Emission Buildings

...coordinated strategies: - reduction of energy demand through technological measures -...a combination of many technologies. Much R&D has already been undertaken in this area, and...build on existing results and on-going relevant R&D projects. But new technolo gies, built on...

Awarded: NOK 0.20 mill.

Project Period: 2008-2008

Location: Trøndelag - Trööndelage

RENERGI-Fremtidens rene energisystemer

High Temperature PEM Fuel Cells Operating with Organic Fuels

...non-renewable energy resources (fossil fuels) are by far the most...environmental pollution. Environmental and energy security concerns are speeding the pace of...CO2 emissi ons, lowering costs and securing energy security. Small organic molecules produced...

Awarded: NOK 3.6 mill.

Project Period: 2007-2010

Location: Trøndelag - Trööndelage

LATIN-AM-Latin-Amerika-programmet

Contested Territory: Assessing Claims over Land and Natural Resources in Latin America

...and a right to control and use the land and natural resources within their geographical space....problematic in Latin America, where land and natural resources play a fundamental role in the...of renewable and non-renewable resources. Although not lacking in rhetorical force,...

Awarded: NOK 79,000

Project Period: 2013-2013

Location: Oslo

IS-AUR-Samarb.progr. Norge Frankrike

Exploring and leveraging energy monitoring on End-to-End worst edge-fog-cloud continuum for observatories deployed in extreme environments

...monitoring of energy usage is the key to analyze and understand...will be the first step in order to deal with energy efficient infrastructures in terms of...services. But providing an End-to-End energy monitoring solution remains a real challenge...

Awarded: NOK 0.10 mill.

Project Period: 2023-2024

Location: Troms - Romsa - Tromssa

POLARPROG-Polarforskningsprogram

Political Philosophy Looks to Antarctica: Sovereignty, Resource Rights and Legitimacy in the Antarctic Treaty System

...pressure over natural resources in Antarctica will mount in the...to Antarctica: climate change, dwindling natural resources in occupied territories, and the...more generally, and of the Antarctic Treaty System more specifically, by focusing on two topics....

Awarded: NOK 6.7 mill.

Project Period: 2017-2021

Location: Oslo

ENERGIX-Stort program energi

ERA-Net: dAta-DRivEN smArt buiLdINgs

...to be one of the lowest-cost opportunities for providing the flexible demand needed to...the development of new algorithms. The best-performing solutions will be implemented in real-life...replicability, and to demonstrate real-life...står for 40 % av energiforbruket i EU, og hoveddelen av...

Awarded: NOK 0.80 mill.

Project Period: 2022-2025

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

Geological High-temperature Optimized Storage Technology – Digital Twin

...thermal energy storage is a concept where excess heat from...human activities is injected into the ground for later (long or short term) recovery and use,...for district heating. The green shift of the energy sector will require rapid uptake of renewable...

Awarded: NOK 4.0 mill.

Project Period: 2023-2027

Location: Trøndelag - Trööndelage

SIRKULÆRØKONOMI-Sirkulær økonomi

BALancing humAn and Natural resource use in a Circular bioEconomy

...circular rather than linear flows of resources. The project’s research findings will...understanding of the interlinkages between natural and human resources systems as well as the...patterns. These sectors include aquaculture, forestry and agriculture. BALANCE empirically...

Awarded: NOK 11.8 mill.

Project Period: 2021-2025

Location: Trøndelag - Trööndelage

MAROFF-2-Maritim virksomhet og offsh-2

ICHzero - Integrated cooling and heating for zero-emission operation of offshore ships

...urgent demand for renewable energy production has resulted in...sustainable way, there is a significant demand for service operation vessels (SOV) designed with...scattered throughout many different technical systems, software applications and information...

Awarded: NOK 4.9 mill.

Project Period: 2023-2025

Location: Møre og Romsdal

PES2020-Prosj.etabl.støtte H2020

Membranes for Flexible and Cost-effective CCS (FLECCS)

...technology, aiming at a 15-25% reduction in energy penalty and 30-40% reduction in capture cost...an operational environment. Reinertsen New Energy will have the following Scope: WP4 System...Energy) will: - Develop a conceptual design for the hybrid membrane-CO2 liquefaction system,...

Awarded: NOK 79,999

Project Period: 2018-2021

Location: Trøndelag - Trööndelage

ENERGIX-Stort program energi

SET 7: IFEs Deltakelse i EERA-JPGE (Geotermisk)

...d in two FP5 EU projects on geothermal energy (Soultz and Engine) where Jiri Muller has...SP1:Resource assessment SP2:Accessing and engineering a reservoir SP3:Process engineering and...In May 2012, IFE organised a workshop for EERA-JPGE on tracer technology, corrosion and...

Awarded: NOK 0.14 mill.

Project Period: 2013-2014

Location: Akershus

NAERINGSPH-Nærings-phd

Application of Systems Engineering Methods in the oil and gas industry

...Systems Engineering has been used in industries such...For the subsea industry, however, the use of Systems Engineering is less mature. As oil and gas...from other industries, more research on systems engineering specific for the oil and gas...

Awarded: NOK 1.6 mill.

Project Period: 2018-2022

Location: Buskerud

INTSAMGEN-Internasjonalt samarbeid generelt

Role of Biomass in Norway's Energy Future

...States a major new initiative in biomass energy research is the project "Role of Biomass in...can make large contributions to future demands for energy services, especially transportation"...are also initiatives t o promote biomass energy, but they are inevitably small compared with...

Awarded: NOK 85,000

Project Period: 2005-2005

Location: Oslo

BIA-Brukerstyrt innovasjonsarena

Digital twins for Operational Management Systems (OMS) and production analytics

...companies need systems for execution, reporting, analyzing and...lowers the barriers of cost and complexity for realizing and operating such systems. The...be generated automatically from generic plant information models (digital twin patterns). One OMS...

Awarded: NOK 11.9 mill.

Project Period: 2020-2022

Location: Østfold

PES2020-Prosj.etabl.støtte H2020

"GRACE: Green Recirculated Artic Char Environment" - a radical new land-based farming model for the aquaculture industry.

...the context of depleting land, energy resources and population growth, the...vital role in sustainably meeting future demand for dietary protein. That said, the aquaculture...dark side. This model of farming is responsible for 110 million tonnes of sea water pollution per...

Awarded: NOK 74,999

Project Period: 2020-2021

Location: Akershus

NATURNAER-Natur og næring

Second generation Wood Fibre Composites (Samfinansiering fra VM og PROSBIO)

...This project will focus on specific Nordic natural fibre resources which are lacking high-value...regarding wood fibre defibration, fibre engineering, fibre handling and feeding into...will be a co-operation between SINTEF/PFI and forest owners, natural fibre producers,...

Awarded: NOK 3.0 mill.

Project Period: 2005-2008

Location: Vestland

PES-HORISONT-EU-PES Horisont Europa

nov El - energy - re C ycling - s O lution - to - i M prove - onbo AR d - eff I ciancy - of - pmfc - for - waterbour N e - op E rations

...aim is to recover and recycle waste energy of proton exchange membrane fuel cell (PEMFC)...by at least 20% through CHP system. The energy will be recovered by a combination of...cycle to recover energy from the cooling system of the fuel cell, minimizing energy losses of...

Awarded: NOK 0.12 mill.

Project Period: 2021-2021

Location: Nordland - Nordlánnda

PES2020-Prosj.etabl.støtte H2020

Writing the SME instrument phase 1 application for Waterfountain R&D and demonstration model, feasability study.

...members of Oisann Engineering will submit an application for...2020 from the European Commission. The abstract for our SME Phase 1 Project is the following: In...to mitigate the water crisis; desalination is forecasted to be a USD $26.81bn industry in 2025....

Awarded: NOK 49,999

Project Period: 2018-2019

Location: Vestland

ENERGIX-Stort program energi

Simulation of governing processes in superheated and supercritical geothermal systems: mathematical models, numerical methods and field data

...are key to unlocking near-magma geothermal resources. Production from these low-carbon energy...and compete. Initial experience from these systems point to shortcomings in current process...simulation capacity, that impede efficient engineering operations. SIGS focus on two mechanisms...

Awarded: NOK 4.0 mill.

Project Period: 2020-2024

Location: Vestland

PES2020-Prosj.etabl.støtte H2020

Advancing gamification technologies: Paths to an integrative framework with tool support for creating digital games in non-leisure contexts

...project is to develop consortium and proposal for Horizon 2020 LEIT-ICT-21 call Advanced digital...methodologies and tools t o produce and apply digital games and gamification in non-leisure...are applicable in domains beyond health care systems. Project deliveries will facilitate the...

Awarded: NOK 0.25 mill.

Project Period: 2014-2014

Location: Oslo

RENERGI-Fremtidens rene energisystemer

Efficient incentive mechanisms for introduction of renewable resources and development of transmission in deregulated power markets

...current and alternative incentives structures for introduction of renewable generation capacity...suitability of th e existing numerical models for assessing the transmission issues related to...resources will be evaluated. The most suitable formulation for a numerical analysis of the issues...

Awarded: NOK 0.71 mill.

Project Period: 2007-2008

Location: Vestland

FINNUT-Forskning og innovasjon i utdanningssektoren

DiCoTe: Increasing professional Digital Competence in ECTE with focus on enriching and supporting children’s play with coding toys

...meets the urgent need to enhance professional digital competence in Early Childhood Teacher...during the last decade. Despite these efforts, it has been reported that teachers in...digital competence that is required for adequately supporting children’s play with...

Awarded: NOK 12.0 mill.

Project Period: 2021-2025

Location: Rogaland

RENERGI-Fremtidens rene energisystemer

Store vindmøllegeneratorer

...is developing a new generator system with a weight reduced generator and an...SmartGenerator to contribute in the national effort of establishing economical viable new...SmartGenerator will also establish engineering and industrial activities in different...

Awarded: NOK 7.0 mill.

Project Period: 2005-2009

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Efficient Wind Energy System for Icing Conditions

...energy in cold climate areas is set to grow rapidly...the effects of icing and low temperatures on energy production may prevent otherwise good wind...in cold climate regions is about 60GW. Performance losses are very common due to icing...

Awarded: NOK 99,999

Project Period: 2015-2016

Location: Nordland - Nordlánnda