0 projects

PES-HORISONT-EU-PES Horisont Europa

Writing support from Ixion for EEC Accelorator. Contactless Monitoring

Please check enclosed file

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Vestfold

PES-HORISONT-EU-PES Horisont Europa

EU Horizon Eurostars Application for Aviant

The initial phase of Aviant's application development involves conducting thorough market research to identify potential project partners who are a strategic match. To upgrade our current drone platform to SAIL-III, we are specifically interested in partners specializing in (1) drone propulsion s...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

PES - Woman TechEU - SifoTEK

In line with program objectives, the Woman TechEU program is “supporting women leading deep tech startups from Europe to grow into tomorrow’s tech leaders and putting women at the forefront of deep tech in Europe”. The above fully matches SifoTEK’s positioning and organizational structure, being...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

Empowering Lithium367 Womentech Business

Det skal skrives søknad til EU

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Akershus

PES-HORISONT-EU-PES Horisont Europa

PES EIC Accelerator - FutureFerm

As per an already approved EIC Accelerator stage-1 proposal, PLAATO is looking to revolutionize fermentation technology beyond alcoholic beverage industries - building the infrastructure needed for the next generation of emerging industrial fermentation-based industrial processes. Effectively, PL...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Obstetrisk sjokkindeks indikator - identifisering av alvorlig blødning etter fødsel

Prosjektets hovedmål er å utvikle et medisinsk-teknisk apparat som kan identifisere postbartumblødninger (PPB) på bakgrunn av pasientens fysiologiske respons, obstetrisk sjokkindeks (OSI). Utfordringen med dagens metoder er at diagnosen PPB i hovedsak baserer seg på estimert/målt blodtap. Der mer...

Awarded: NOK 49,999

Project Period: 2024-2025

Location: Østfold

PES-HORISONT-EU-PES Horisont Europa

NLP for data extraction – PES for WomenTechEU

A detailed project plan and budget will be developed, outlining the required resources, timelines, and estimated costs. Additionally, Grayn will establish partnerships with potential collaborators and secure preliminary commitments for co-funding and in-kind contributions to strengthen the fundin...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Nordland - Nordlánnda

PES-HORISONT-EU-PES Horisont Europa

Sustainable and flexible pre-processing concept for recycling of mixed-chemistry Li-ion battery waste

Consortium is in place, and the writing has started. Work from now will be writing, meetings with consortium and liteature consultation. No external costs - only hours internally.

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Akershus

PES-HORISONT-EU-PES Horisont Europa

Beyond state-of-the-art battery recycling by increasing the selectivity and specificity of efficient pre-processing technologies

The work will consist in office work and meetings with the consortium and coordinator.

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Oslo

MSCA-Marie Sklodowska-Curie Actions (MSCA)

Smart and Sustainable Host UniverCities: leveraging city-university interactions to further the twin green and digital transition

Smart and Sustainable Host UniverCities: leveraging city-university interactions to further the twin green and digital transition

Awarded: NOK 6.0 mill.

Project Period: 2024-2028

Location: Rogaland

EUROSTARS-EUROSTARS

4892 PavisusVL

Riktig håndtering av luftveiene er avgjørende for pasientsikkerheten under operasjoner og i akutte situasjoner. Til tross for framskritt innen medisinsk teknologi, kan det å sikre pasientens luftveier på første forsøk være utfordrende, noe som potensielt kan føre til komplikasjoner og negative ut...

Awarded: NOK 6.0 mill.

Project Period: 2024-2026

Location: Oslo

MILJØFORSK-Miljøforskning for en grønn samfunnsomstilling

RESources in Coastal groundwater Under hydroclimatic Extremes (RESCUE)

Det er flere kilder til ferskvann: nedbør, innsjøer, elver, snø, permafrost, vanndamp, grunt grunnvann og dype grunnvannsakviferer, for å nevne noen. Det er også ferskvannsressurser under havbunnen, kjent som offshore-akviferer (se figuren til høyre). Nyere forskning anslår at volumet av vann i a...

Awarded: NOK 3.5 mill.

Project Period: 2024-2027

Location: Oslo

MSCA-Marie Sklodowska-Curie Actions (MSCA)

Improve offshore infrastructure resilience against geohazards towards a changing climate

Improve offshore infrastructure resilience against geohazards towards a changing climate

Awarded: NOK 9.0 mill.

Project Period: 2024-2028

Location: Trøndelag - Trööndelage og 3 andre

EIC-The European Innovation Council (EIC)

Intelligent Radiation Sensor Readout System?

Intelligent Radiation Sensor Readout System?

Awarded: NOK 7.3 mill.

Project Period: 2024-2028

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

AI for Open Source Software Security Certification

The main goal of CertifAIit project is to propose a holistic view on novel AI-based development technologies, data technologies and Cybersecurity compliance issues, by offering a toolset to implement secure code, easy to be integrated by third parties for releasing certified products, with a conc...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

Prosjektetablererstøtte til Eurostars

Agoprene AS har utviklet et nytt bioskum, et miljøvennlig alternativ til dagens petroleumsbaserte skumgummier. Agoprenes bioskum er laget av 100% biobaserte ingredienser, hovedsakelig sjøgress. Vi sikter på å levere en søknad til Eurostars-fristen den 14.mars 2024 (Eurostars 3 - Call 6). For å de...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Vestfold

PES-HORISONT-EU-PES Horisont Europa

DIRS - A Digital Incentivisation & Regulation PaaS and ecoSystem for controlling connected mobility services

The purpose of the project is to prove the relevance, impact power, and technical and commercial feasibility of a new digital incentivisation & regulation PaaS and ecosystem solution, DIRS. The new services delivered by the new DIRS platform will be offered to the market within 12 months from the...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Rogaland

PES-HORISONT-EU-PES Horisont Europa

Project support for Lead optimization for nomination of a preclinical development candidate for AML therapy

The PES grant will be used to engage personnel in KinSea to have dedicated time to write and coordinate the project proposal.

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Troms - Romsa - Tromssa

PES-HORISONT-EU-PES Horisont Europa

RuralTwin PES

Writing a HE project proposal called RuralTwin. This is a follow-up proposal of NextGEOSS, (BLB was a partner and continue to maintain the resulting NextGEOSS datahub and platform), The H2020 project ILIAD developing the Digital Twin of the Ocean, BLB member of Coordination team as Innovation man...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Buskerud

PES-HORISONT-EU-PES Horisont Europa

Advanced Remote Infrastructure System Evaluation

The ARISE platform will continually update and digitally record the maintenance and repair status of infrastructure assets. It will adopt an interoperable data-sharing approach, adhering to existing standards and contributing to standardization. Moreover, ARISE will bolster skills development, of...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Søknad til EIC Accelerator steg 2 (Plug In)

Kyoto Group AS er et teknologiselskap innen fornybar energi som utvikler standardiserte industriskala systemer for generering og lagring av varme, såkalte Termiske Batterier, eller Thermal Energy Storage system (TES). Systemene tillater lading med rimelig strøm om natten eller når kraften er bill...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Akershus

MSCA-Marie Sklodowska-Curie Actions (MSCA)

Using museum specimens to understand mushroom population genomics.

Using museum specimens to understand mushroom population genomics.

Awarded: NOK 2.3 mill.

Project Period: 2024-2026

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

Development of a High Temperature downhole convertible coring and drilling system for a Geothermal drilling application.

The general project description is to develop and test a High Temperature system for a Geothermal well drilling application that allows drilling and selective coring without tripping, and which further includes controlling and adjusting the inclination of the wellbore by downhole adjustment of a ...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Rogaland

MSCA-Marie Sklodowska-Curie Actions (MSCA)

Material Science Innovation for Accelerated, Sustainable and Safe Implementation of Carbon Capture and Storage

Material Science Innovation for Accelerated, Sustainable and Safe Implementation of Carbon Capture and Storage

Awarded: NOK 9.0 mill.

Project Period: 2024-2028

Location: Trøndelag - Trööndelage og 3 andre

PES-HORISONT-EU-PES Horisont Europa

SPRINT - Sodium-ion batteries for stationary applications featuring improved electrodes PRocesses, Inherently safe and Non-Toxic materials

1) Scope and concept development of the project to optimise and demonstrate in end-user conditions two European, sustainable, techno-economically viable and safe Sodium-Ion Batteries (SIBs) to match the requirements of a wide range of energy storage applications. 2) Preparation of this EU project...

Awarded: NOK 49,999

Project Period: 2024-2024

Location: Vestfold

PES-HORISONT-EU-PES Horisont Europa

Prosjektetablererstøtte til EIC Accelerator Step 2

Agoprene søker med dette om PES-støtte fra Forskningsrådet for å utarbeide og sende inn en vinnende søknad til EUs flaggskipprogram "EIC Accelerator" til fristen den 13. mars 2024. Agoprene sendte inn en "Step 1"-søknad i Q4 2023 som fikk "Go" fra tre av fire evaluatorer, og dermed kvalifiserte s...

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Vestfold

PES-HORISONT-EU-PES Horisont Europa

PES Horizon CBE IA-05 2024 Bioaromatics from lignin

The project is a continuation and scale up of the RCN funded project 321427 Lignin to bioaromatics. Two technologies for depolymerisation of lignins (lignosufonates, kraft lignins, hydrolysis lignins) are ready for scale up. Borregaard plan to invest in a new demo plant for production of aromati...

Awarded: NOK 0.40 mill.

Project Period: 2024-2025

Location: Østfold

PES-HORISONT-EU-PES Horisont Europa

Støtte til EIC Accelerator søknad steg 2

Prosjektet går ut på å utarbeide og skrive en søknad til EIC Accelerator steg 2 der det stilles høye krav til både søknad, presentasjon og film.

Awarded: NOK 99,999

Project Period: 2024-2024

Location: Trøndelag - Trööndelage

PES-HORISONT-EU-PES Horisont Europa

MAIRROR

The objective of the MAIRROR proposal is to develop tools to help define design and process guidelines from any level of the characterisation pyramid. Currently, there is only interactions between the adjacent levels, but our project wants to break these barriers and generate new connections than...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Oslo

PES-HORISONT-EU-PES Horisont Europa

CLEAR-EO PES

Writing a HE project proposal called CLEAR-EO. This is a follow-up proposal of NextGEOSS, (BLB was a partner and continue to maintain the resulting NextGEOSS datahub and platform), The H2020 project ILIAD developing the Digital Twin of the Ocean, BLB member of Coordination team as Innovation mana...

Awarded: NOK 69,999

Project Period: 2024-2024

Location: Buskerud