0 projects

PES2020-Prosj.etabl.støtte H2020

Decision Support Tool for Rail Infrastructure Managers

The objectives will be achieved through a holistic management tool based on the FACT (Find, Analyse, Classify, Treat) principle, as described briefly in the following: Find - Improved techniques for the assessment of existing assets will be developed. Analyse - Advanced probabilistic models f...

Awarded: NOK 45,938

Project Period: 2014-2014

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

ëMediCare Patient treatment by an online medicine dispenser

The aim of the current project is to develop project concept and proposal for H2020 call SME instruments 1 2014 with spesific Topic Disrupticve ICT technologies call identifier ICT 37. The summary of the project is provided in the attacment.

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Horizon 2020, SME Instrument Phase 1: Biological Water Alarm System (BiWAS)

I SME Instrument phase 1 så skal det utføres et mulighetsstudie for å verifisere både det teknologiske/praktiske samt den økonomiske levedyktigheten. Aktivitetene kommer til å omfatte: Risikovurdering, markedsundersøkelser, brukerinvolvering, åndsverksfor valtning, innovasjonsstrategiutvikling, p...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Vestfold

PES2020-Prosj.etabl.støtte H2020

Facilitating National Road Authorities to consistently include life cycle impact and cost considerations in all infrastructure planning

Life cycle impacts and resource efficiency of road construction, operation and maintenance are largely influenced by choices in the early planning of road infrastructure (e.g. related to road type and route location). Possibilities for improving life cycl e impacts and resource efficiency thus al...

Awarded: NOK 37,687

Project Period: 2014-2014

Location: Trøndelag - Trööndelage

PES2020-Prosj.etabl.støtte H2020

Intelligence search system

Se vedlagte prosjektbeskrivelse for arbeidet med søknaden til Horizon2020.

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Innlandet

PES2020-Prosj.etabl.støtte H2020

Zero emission battery electric fast ferries

EU har støttet BB GREEN prosjektet med å finansiere byggingen av en fullskala luftassistert batteri-elektrisk prototype. Dette prosjektet ønsker å benytte denne investeringen for først å kartlegge aktuelle bruksområder / ruter / applikasjoner og definere business caset rundt dette (Fase 1); samt...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Vestfold

PES2020-Prosj.etabl.støtte H2020

Holographic Scanner for Safe Real-Time High Throughput Screening of People and Their Bags

The Call in question, DRS-17-2014/2015: Critical infrastructure protection topic 7: SME Instrument topic Protection of urban soft targets and urban critical infrastructures specifically asks European SMEs to come forward with proposals aimed at (among oth er topics) development of novel high thro...

Awarded: NOK 39,999

Project Period: 2014-2014

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

Improving disaster resilience as part of climate change adaptation

To achieve its objectives, the project has been divided into 6 work-packages corresponding to: 1. Climate change projections 2. Future impacts of climate change 3. Future impacts of extreme events 4. Performance and impact of adaptation options 5. Govern ance of risk and adaptation 6. Decision s...

Awarded: NOK 69,999

Project Period: 2014-2014

Location: Oslo

VAM-Velferd, arbeid og migrasjon

Changes in labour market institutions, immigration and ageing; challenges for the Norwegian welfare state

I en oppfølging av en tidligere studie i prosjektet studerer vi hvor robuste funn basert på makrodata er ved å utnytte mikrodata som skiller mellom sammensetningseffekter og mer strukturelle forhold. Hovedresultatet er at immigrasjon har hatt en negativ effekt på lønn i Norge for «innlendinger» o...

Awarded: NOK 7.0 mill.

Project Period: 2014-2019

Location: Oslo

SSF-Svalbard Science Forum

Shifting Climate States of the Polar Regions - field campaign at Svalbard 2014

This cross-disciplinary proposal will collect and produce data on glacier and climate variability throughout the last 10 000 years, a research effort that will be carried out at Svalbard. Arctic lakes represent natural systems that are particular sensitiv e to climate change and the sites chosen ...

Awarded: NOK 43,999

Project Period: 2014-2014

Location: Vestland

SSF-Svalbard Science Forum

Paleomagnetic Synchronization: A transect of sedimentological archives from N-Svalbard towards Arctic-Norway

Continental ice sheets and sea level in the Svalbard - Barents Sea - Arctic-Norway region were near their modern configurations at least by 8000 years ago, and the pre-industrial climate system was essentially established, including its feedbacks. The maj or difference was the large summer insola...

Awarded: NOK 34,999

Project Period: 2014-2014

Location: Vestland

DIV-INT-Annet internasjonalt samarbeid

Søknad om støtte til IIASA Young Scientists Summer Program

The vulnerability of food and water shortage increases as the Earth is warming. Today, the two main pressures on water availability is climate change towards a more variable and in some regions drier climate and increased water consumption due to populati on growth. In order to mitigate water sho...

Awarded: NOK 29,999

Project Period: 2014-2014

Location: Oslo

SSF-Svalbard Science Forum

A high-resolution paleoclimate reconstruction from Lake Erlingvatnet, NW Svalbard. RiS ID: 6676

The goal of this research is to carry out a high-resolution paleoclimate reconstruction from Lake Erlingvatnet in NW Svalbard. This study would form part of my PhD thesis at the University of Massachusetts, Amherst. Fieldwork and subsequent analysis would be carried out in cooperation with colle...

Awarded: NOK 40,999

Project Period: 2014-2014

Location: Vestland

SSF-Svalbard Science Forum

Reconstructing Holocene climate variability from lake sediments of Amsterdamøya, RiS ID 6655

There are gaps in our knowledge of Holocene paleoclimate in the High Arctic due to a lack of well-resolved records and limitations of existing proxy data. Our understanding of High Arctic climate variability can be improved with the application of new bi ogeochemical methods and chronologic tool...

Awarded: NOK 32,934

Project Period: 2014-2015

Location: Vestland

PETROMAKS2-Stort program petroleum

Petroleum economics: investment analysis and corporate behaviour

A. Kostnadsutvikling på norsk sokkel En unormalt lang oppgangskonjunktur på mer enn ti år har gitt sterk kostnadsøkning i oljeindustrien, i Norge og i andre utvinningsland. Kombinert med sterkt fall i oljeprisen har oljebransjen og utvinningsland fått store økonomiske utfordringer. Dette har git...

Awarded: NOK 8.0 mill.

Project Period: 2014-2018

Location: Rogaland

IS-RUOK-EONR-økonomi

Master thesis: Development of an European natural gas market model.

The aim of my stay in Norway is to write my master thesis in cooperation with the Norwegian School of Economics in Bergen. Topic of the master thesis is to develop an European natural gas market model that analyzes the impact of the Norwegian natural gas supply on the total European gas market. ...

Awarded: NOK 30,000

Project Period: 2014-2014

Location: Ukjent Fylke

SSF-Svalbard Science Forum

The influence of flea infestation on the reproductive success of barnacle geese (Branta leucopsis) in Kongsfjord, Svalbard.

The aim of this project is to investigate the effect that infestation of nests by fleas (Ceratophyllus vagabundus vagabundus Boheman, 1866) has on the incubation, and hatching and fledging success of barnacle geese on the Lovén islands in Kongsfjord. Nes ts will be mapped and a minimum of 20 nes...

Awarded: NOK 35,999

Project Period: 2014-2015

Location: Akershus

KLIMAFORSK-Stort program klima

Transforming Climate Knowledge with and for Society: mobilising knowledge on climate variability with communities in northeast Bangladesh

Sylhet-provinsen i Nord-øst Bangladesh har et unikt lokalt klima med særlig mye nedbør i pre-monsuntida om sommeren. Men det er stor usikkerhet knyttet til årsaker og virkning av dette regnværet, og lokalsamfunnene er svært sårbare for endringer i nedbørsperiode og -mengde. TRACKS bragte sa...

Awarded: NOK 10.9 mill.

Project Period: 2014-2018

Location: Vestland

BIONÆR-Bionæringsprogram

Consumers in a sustainable food supply chain: understanding barriers and facilitators for acceptance of visually suboptimal foods

A lot of food gets wasted that is still fine to eat, but doesn't look perfect: it may have an odd shape, unattractive colour, breaks or dents, or with a best-before date that is close by or even past. These "suboptimal foods" may account for a large share of food waste: around 25% of foods that a...

Awarded: NOK 2.4 mill.

Project Period: 2014-2017

Location: Akershus

IS-RURE-EONR-rettsvitenskap

The burden of presentation and proof in trademark trials in Germany and Norway

The core part of the project is the influence of European provisions on the burden of demonstration and proof in trademark infringement trials in Germany and Norway. It can be observed that both German and Norwegian codifications of civil procedure are in creasingly influenced by European provisi...

Awarded: NOK 85,000

Project Period: 2014-2014

Location: Ukjent Fylke

ENERGIX-Stort program energi

Window Integrated Solar Collector

Prosjektet handler om å lage vinduer som fanger opp den unyttige delen av solspekteret (IR-stråling / varmestråling) og gjør den om til elektrisk energi. Dette skal fås til vha. nanopartikler som sprer IR-strålingen sideveis så den forplanter seg bort til endene av glasset. Resiprositetsteoremet...

Awarded: NOK 0.35 mill.

Project Period: 2014-2017

Location: Trøndelag - Trööndelage

GLOBVAC-Global helse- og vaksin.forskn

Acceptability and Effectiveness of Umbilical Cord Cleansing with 4% Chlorhexidine for the Prevention of Newborn Infections in Uganda

Ca. 2.5 millioner nyfødte i verden dør årlig, og hele 98 prosent av disse finner sted i lav- og mellominntektsland (LMICs). En tredjedel av disse dødsfallene blant nyfødte i LMIC forårsakes av infeksjoner, og mange av disse starter med infeksjon i navlestumpen. Det finnes flere mulige tiltak for ...

Awarded: NOK 6.0 mill.

Project Period: 2014-2021

Location: Vestland

KLIMAFORSK-Stort program klima

Crafting Climate Transitions from below

Å bygge klimaomstilling nedenfra: Håndverkeres rolle som rådgivere og formere av Klimaomstilling i byggenæring og energipolitikk Crafting Climate Transitions from Below har gitt et bidrag til kunnskapen om klimaomstillinger ved å sette fokus på håndverkernes rolle som aktører på to områder: So...

Awarded: NOK 5.9 mill.

Project Period: 2014-2018

Location: Trøndelag - Trööndelage

VAM-Velferd, arbeid og migrasjon

Active ageing - pathways and outcomes

På bakgrunn av befolkningsaldring og bekymring for velferdsstatens bærekraft er en offentlig målsetting å stimulere til økt aktiv, eller produktiv, aldring. Men i hvilken grad vil, kan og får eldre delta? AgePaths er et longitudinelt og komparativt forskningsprosjekt som studerer motivasjon, barr...

Awarded: NOK 11.1 mill.

Project Period: 2014-2020

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

IMPROVING THE OLDER ADULTS WELLBEING BY THE USE OF ICT SUPPORTING HORTICULTURAL THERAPY

"TEORETISK" BAKGRUNN: Gardening can be a very fulfilling and therapeutic activity for the elderly, even for those suffering mental health diseases like Alzheimer's disease and other forms of dementia. Furthermore, tending plants can overcome feelings of i solation by giving individuals the opport...

Awarded: NOK 49,999

Project Period: 2014-2014

Location: Oslo

BIONÆR-Bionæringsprogram

Avslutningskonferanse prosjektet Recovery Oriented Green Care Services

Konferansen markerer avslutningen av prosjektet Recovery oriented Green Care Services (ROGCS) der resultater formidlers og det skapes en møteplass mellom tilbydere, brukere, forskere, landbruksmyndigheter, NAV, helse- og omsorg, og forskere fra inn- og ut land. Målet med ROGCS-prosjektet har vært...

Awarded: NOK 65,613

Project Period: 2014-2014

Location: Innlandet

PES2020-Prosj.etabl.støtte H2020

Low Frequency multi-element transducers and instrumentation for NDI (None Destructive Inspection) of Concrete.

I prosjektet skal vi utvikle og produsere instrument for ikke ødeleggende inspeksjon/testing NDI/NDT, av fast betong. En ny ultralyd transducer med tilhørende analog og digital elektronikk for raskere innsamling av data med brukervennlig brukergrensesnitt og videopresentasjon. Teknologifronten m...

Awarded: NOK 0.12 mill.

Project Period: 2014-2014

Location: Oslo

PES2020-Prosj.etabl.støtte H2020

PES for H2020 prosjektsøknad 'UbiqID - Local Identity Management for Ubiquitous Authentication'

This PES-project has the objective of establishing a consortium and developing a project application for the H2020 call Access Control, in Working Programme Societal Chellenges. Call deadline is August 28th 2014. The consortium project idea is to demonstr ate how user preference for the OffPAD pr...

Awarded: NOK 79,999

Project Period: 2014-2015

Location: Oslo

DIV-INT-Annet internasjonalt samarbeid

Arctic scenario workshop

Adaptation Actions for a Changing Artic-part C (AACA-C)er et prosjekt vedtatt av ministermøtet i Arktisk Råd mai 2013. Arctic Monitoring and Assessment Programme (AMAP) er ansvarlig for implementering av prosjektets del C. AACA-C inneholder flere work-pac kages, blant annet klimanedskaleringer ti...

Awarded: NOK 79,999

Project Period: 2014-2014

Location: Troms - Romsa - Tromssa

PES2020-Prosj.etabl.støtte H2020

PES støtte Energy EE5: Integrated Decision Support for Early Steps of NZEB Renovations (EarlyNZEB)

The goal of the project is to develop information and methodical support for building owners in order to ? Think: bring building owners to think about deep renovation of a building ? Prepare: support building owners in the assessment of different options for deep renovation (including NZEB renov...

Awarded: NOK 46,474

Project Period: 2014-2014

Location: Akershus